Post Job Free

Resume

Sign in

Compliance Analyst Design Drafter

Location:
Houston, TX
Posted:
September 06, 2023

Contact this candidate

Resume:

Kevin Kmetz – Pipeline Designer/ Coordinator

***** ******* *****, ******* *****, 77065

713-***-**** cell

adzip9@r.postjobfree.com

PROFESSIONAL OBJECTIVE: 43+ Years experience Design Drafting/Coordination/Project Teams

CAREER HIGHLIGHTS:

Fields include: Petrochemical-Onshore-Offshore Pipeline Mapping, GIS-GPS Compliance Systems, P & ID’s, Electrical Schematics, Civil Land/Road/Design. Utilizing proactive design tools diverse in: AutoCAD 12-2021, ArcMap 10.8 GIS, LANDesk, Civil 3d 2021, Micro station v8, 3D COADE CADWorx, Smart Plant/Structural (PDMS). Pipeline mapping duties are as follows: Construction Drawings, Alignment Sheets, Pipe Material Data Pipe Appurtenances (River Weights, etc.)

Stationing Mileposts, Land Ownership, Foreign Line Crossings, Utility Crossings Cathodic Protection

Drawing Format and Organization (Compliancy with RDG-2010) Directional Drills,

Plan and Profile, Tie-In Stationing, Stationing Equations, Property Plats, Property Boundaries, Legal Descriptions

Plot Plans, Topographical Data, Existing Improvements, Cut and Fill Requirements, Pipeline schematics.

Pipeline Integrity Data, Data Format and Organization (EPCO STD-9002) As- Built Construction Plans

PROFILE: PC literate with experience in Word, Excel, MS Interface Framme.

Experienced in training, supervising, coordinating in office/field team members with deliverables to clients.

PROFESSIONAL EXPERIENCE:

02/2022-08/2023

GULF INTERSTATE ENGINEERING, INC. 16010 BARKERS POINT LANE, HOUSTON, TX. 77079 G.I.S. Pipeline Design/ Lead Checker

Clients: Summit Midwest Carbon, L.L.C. 2,200 miles of Carbon plant pipeline.

HDD’s, Alignment sheets of 2,025 miles of integrated pipeline system.

Whitewater -Matterhorn Natural Gas pipeline. 673 miles.

11/2017- 7/29/2019, ENSITE, U.S.A.. 3100 S. GESSNER, Ste. 400, HOUSTON, TEXAS 77063

Clients: SALT CREEK MIDLAND L.L.C.- G.I.S. Pipeline Design. Construction Easements, Plats. Gathering Maps.

05/2011-04/01/2016, GULF INTERSTATE ENGINEERING, INC. 16010 BARKERS POINT LANE, HOUSTON, TX. 77079

Clients: PG&E, Spectra P/L, Williams-Constitution P/L Co., LLC. Sr. Principal Design Mapper (Pipeline Mapping)

Alignment Sheets, Road Permit, Wetland /Waterbody Permits, Facilities P& IDs. See mapping career highlights.

6/05- 12/09 UNIVERSAL/PEGASUS INT’L. 4848 LOOP CENTRAL DRIVE, HOUSTON, TX, 77081

AutoCAD 2008, LANDesk, GIS, Microstation v8

Clients: TransWestern, Enbridge & Enterprise Pipelines. Design Mapper IV (Pipeline Mapping) As-Built Construction

Construction Drawings, Alignment Sheets, Directional Drills, Pipeline schematics, See mapping career highlights.

10/03-6/05 GULLETT & ASSOC. 7135 OFFICE CITY DRIVE, TX. 77332

AutoCAD- GIS- CADOVERLAY

Sub-contractor for Houston P/L Co. (now Transfer Energy) Sr. Pipeline Designer (Gas Assessment)

As-Built Construction Plans. Drawings, alignment Sheets, Directional Drills, (see career highlights)

Meter station sites

9/02-6-03 COLUMBIA GULF GAS & TRANSMISSION, 2603 AUGUSTA, HOUSTON, TX. 77257

G.I.S.-G.P.S. Compliance Analyst, - Micro Station Framme Interface Conversion. (Pipeline Corrosion, Utility, D.O.T. Pipeline Class, Cathodic Protection, Repair-Replacement updates/reports) (Sold to Northern Indiana Public Service Co.)

5/02-8-02 J.P. KENNY, 15115 PARK ROW, HOUSTON, TX. 77094 (Offshore- Onshore mapping.)

AutoCAD- GIS

Client: Esso- Yoho Development project- Nigeria, (Design Drafter)

Construction, Plan and Profile, Tie-In Stationing, Stationing Equations, Manifolds, Riser Tie-ins.

11/01-5/02 GULF INTERSTATE ENGINEERING, INC. 1700 W.LOOP S. HOUSTON, TX. 77027

Micro Station Bentley Client: Williams Gas Pipeline Co. - Kern River Project (Pipeline Design Team)

As-Built Construction, Plan and Profile, Tie-In Stationing, Stationing Equations, Property Plats, Property Boundaries, Legal Descriptions, Plot Plans, Construction Drawings, alignment Sheets, Directional Drills, See mapping career highlights.

03/01-11-01 J.P. KENNY, 15115 PARK ROW, HOUSTON, TX. 77094 (Offshore- Onshore mapping.)

AutoCAD- GIS

Client: Bombax Pipeline Project-Trinidad-Tobago (Design Drafter)

Construction, Plan and Profile, Tie-In Stationing, Stationing Equations,

9/98-2-23-2001 EL PASO ENERGY 1001 LOUISIANA, HOUSTON, TX. 77002

G.I.S.-G.P.S. Compliance Analyst, Flagship Project-Micro Station Framme Interface Conversion. (Pipeline Corrosion, Utility, Pipeline Class, Cathodic Protection, Repair-Replacement updates/reports) Conversion of 100-200-300 Tenneco pipelines sold to Duke Energy.

11/97-9-98 MUSTANG ENGINEERING 16900 PARK ROW, HOUSTON, TX. 77084 (Onshore Pipeline Mapping)

AutoCAD- GIS- Micro Station

Clients: Columbia Gulf Gas & Transmission, B.P. Victoria-Matagorda Bay, Project (Design Mapper- HDD’S)

As-Built Construction, Plan and Profile, Tie-In Stationing, Stationing Equations, Property Plats, Property Boundaries, Legal Descriptions, Plot Plans, Construction Drawings, alignment Sheets, Directional Drills, See mapping career highlights.

4/97-11-97 WARREN PETROLEUM 1000 LOUISIANA, HOUSTON TX. (Now Dynegy)

Micro Station Pipeline gathering maps for Gas Traders

2/96- 4/97 UNIVERSAL ENSCO, INC. 1800 BERING DRIVE, HOUSTON, TX. 77257 (Onshore Pipeline Mapping)

AutoCAD- GIS- Micro Station

Clients: Express Pipeline, Alliance, Panhandle Eastern, (AutoCAD Mapper), Blues sky infancy w/Micro station)

As-Built Construction, Plan and Profile, Tie-In Stationing, Stationing Equations, Property Plats, Property Boundaries, Legal Descriptions, Plot Plans, Construction Drawings, alignment Sheets, Directional Drills, Pipeline schematics, See mapping career highlights.

10/95-2/96 CONSOER –TOWNSEND TELEDYNE 10100 RICHMOND AVE, HOUSTON, TX. 77063 (Civil-Elect.)

AutoCAD

Client: City of Houston Submersible Substation Design Manual, PLC- Interface drawings. (Contract Drafter)

1/95-10-95 ENRON 4800 SUGARGROVE BLVD., STAFFORD, TX. (Electrical Drafter)

AutoCAD, Auto CAD-E Cable tray routing, MCC spec data sheets, Panel schedules, Loop Diagrams, P&ID’s

11/94-1/95 GIBBS ELLISON, INC. 5301 HOLLISTER, HOUSTON, TX. 77040 (Onshore Pipeline Mapping)

AutoCAD-11 Client: Pemex Pipeline. - (Contract Drafting Checker) (English-Spanish)

Alignment Sheets

8/94-11/94 FORD, BACON & DAVIS HOUSTON, TX. 77031 (Contract Drafter) (Onshore Pipeline Mapping)

AutoCAD

Client: Saudi based alignment sheets

7/92-8/94 GULLETT & ASSOC. 7705 S. LOOP E. HOUSTON, TX. 77332 (Onshore Pipeline Mapping)

AutoCADClients: Houston Pipeline, Enron, West Leg Florida Gas Project (Pipeline Design Team)

As-Built Construction, Plan and Profile, Tie-In Stationing, Stationing Equations, Property Plats, Property Boundaries, Legal Descriptions, Plot Plans, Construction Drawings, alignment Sheets, Directional Drills, Pipeline schematics, See mapping career highlights.

4/92-7/92 CARROL ENGINEERING HOUSTON, TX. 78470 (Civil- Site Survey) AutoCAD

7/91-3/92 KAREN ROSE ENGINEERING HOUSTON, TX. (Civil- Site Survey) AutoCAD

10/90-7/91 GULF INTERSTATE ENGINEERING, INC. 1700 W.LOOP S. HOUSTON, TX. 77027

Client: Saudi –Aramco, (Pipeline Mapper) (Intergraph Micro Station)

10/86-8/90 Dewberry & Davis- Bengston, DeBell, & The Engineering Groupe, Lake Ridge, Va. 22192

(Civil- Land Development) (Board)

Clients: Potomac Mills Mall- IKEA, Dale City Subdivisions, Lake Ridge Recreational Center, Manassas Virginia-Robert Trent Jones Golf Course, Ballston-Metro Building, Washington, D.C..

1/85-10/86 MICHAEL BAKER ENG. HOUSTON, TX. 77027 (Civil- Airport Runways, Site-Surveys) (Board)

83-85 CONTRACT DRAFTER/SURVEY VARIOUS HOUSTON FIRMS. (Board)

7/80- 3/82 GULF INTERSTATE ENGINEERING- 1200 W. LOOP S. HOUSTON, TX. 77027 (Pipeline Mapper)

Client: Alyeska (TAPS) 800 mile Pipeline from Prudhoe Bay Alaska to Valdez. (Board)

As-Built Construction, Plan and Profile, Tie-In Stationing, Stationing Equations,Construction Drawings, alignment Sheets, Pipeline schematics, See mapping career highlights.

1/80-6/80 BURNIP & SIMMS CABLE CO. HOUSTON, TX. 77027 (Cable TV-Survey, Drafter) (Board)

EDUCATION:

HAMMOND TECH-VOC. H.S. HAMMOND, IND. 1970-1974 Non-Graduate, G.E.D. - 2010 H.C.C.

HORN CAD CENTER- COADE CADWorx 3D Pipe-Plant CERTIFIED PDMS– 12-3-2010

HORN CAD CENTER- COADE CADWorx 3D Plant/Structural CERTIFIED PDMS – 3-4-2011

WELDING CAREER:

6/79-12/79 KOENIG TRUCKS, HOUSTON, TX. (H.F.D. Rescue Trucks, Jaws of Life. PTO installs.)(MIG, Arc)

7/78-6/79 MOBILE EQPT. HOUSTON, TX. (Houston Light & Power knuckle boom trucks) (MIG, Arc)

3/76-7/78 BLAW-KNOX FOUNDRY & MILL, E. CHICAGO, IND. CERTIFIED A.S.M.E. X-RAY WELDER

M60 ARMY TANK, HULLS, TURRETS, STEEL POURING BELLS - A.S.W. UNION MEMBER (MIG, Arc)

8/75-3/76 STANRAY RAILWAY CO. E. CHICAGO, IND. CERTIFIED A.S.M.E. X-RAY WELDER

BOXCAR, HOPPER CAR ASSEMBLY - A.S.W. UNION MEMBER (MIG, Arc)

3/74-8-75 UNION TANK CAR CO., E. CHICAGO, IND. CERTIFIED A.S.M.E. X-RAY WELDER

PETROLEUM TANKER RAILWAY CARS - BOILERMAKERS UNION MEMBER (MIG, Arc)

U.S. PASSPORT- AVAILABLE FOR TRAVEL ASSIGNMENTS

Harris County Sheriffs Office- Graduate Class #31 Citizens Police Academy, District V Alumni, April 28th, 2011

Houston Fire Department Mid Rise-High Rise Fire Warden Class November, 2015



Contact this candidate