Post Job Free
Sign in

Electrical Engineer Trouble Shooting

Location:
Lahore, Punjab, Pakistan
Salary:
8000
Posted:
September 06, 2023

Contact this candidate

Resume:

Pakistan Engineering Council

P.E.C. # ELECT/ ****8

Government of the Punjab

Exemption Certificate of competency Category “B”

Certificate # CE (P)/B-171

Membership # 92679719

IAENG

Membership no.

HAFIZ MUHAMMAD ZAMAN ZAHID

ELECTRICAL ENGINEER

DIPLOMAS Y HOBBIES

Formaciones : Diplomados, Congresos, xxxxxxxxxx xxxxxx xxxxxxxxx xxxxxxxxxxxxxxxxx

Hobbies: xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx

OBJECTIVIES:

To provide a solid foundation in the electrical, electronics, telecommunications, computer and software engineering. To develop the concepts of professional practices, innovation and enterprise,

009*********** adzihu@r.postjobfree.com 13-B, Usman Street, Mateen avenue, Gondal chowk, college road, Township,

Lahore, Pakistan.

SOFTWARE

Excel

PowerPoint

Word

xxx

Photoshop

Auto CAD

Mat LAB

WORK EXPERIENCE

LANGUAGES

Urdu: Natal

English: Excellent

French: Poor

09-Sep-2008-To-27-Jan-2010

Address: Pack Tech 138-Main Industrial Estate, Kot Lakhpat, Lahore, Pakistan.

Feb-2010-To-Dec-2012

Address: Quaid-e-Azam Industrial estate, Kot Lukhpat, Lahore, Pakistan.

PACK TECH PRIVATE LIMITED

Assistant Electrical Engineer

Missions or tasks realized: I had worked with Pack Tech. Where I had Responsibilities of trouble shooting on; Diamond engravers (K500, K405) for cylinder making. Eight, Six and five color printing machines. Solvent less lamination machine, Slitting machine for cutting paper real, Center & bottom seal, tri seal machine, Reading and data taking from 35kw Air compressor, 106 kVA, 135 KVA gen sets. Power factor & Energy improvement issues, VFD commissioning & parameters setting.

Whilshire Pharmasuitical Industries Pvt Ltd.

Electrical Engineer

Missions or tasks realized: Responsible for power factor correction, energy amendment of electrical machines. Responsible for hardware repairing of Diamond engraver 9 color machine, Maintenance of Compressor, Chiller, Boilers. Service and trouble shooting of Generators; Perkin, Dominion, Commence, Caterpillar, Waukesha. Responsible for maintenance and servicing the Solvent less lamination machine. Servicing of Power factor and Energy improving issues. Repairing of 10Kva, 135 KVA generator. VFD commissioning & parameters setting working on Delta, puma inverters. Maintenance, servicing the surgery equipment machines, My responsibility as an Electrical engineer is that they are mainly involved in designing, developing and maintaining broad range of electrical systems or components by focusing on safety, economy, reliability, sustainability and quality.

2002

Secondary School

BOARD OF INTERMEDIATE & SECONDARY EDUCATION

Lahore, Pakistan.

Grade = A+

2004

Intermediate

BOARD OF INTERMEDIATE & SECONDARY EDUCATION

Lahore, Pakistan.

Grade = A

2006

Internship (Trainee Engineer)

CREATIVE ENGINEERING PVT. LTD.

150-152/S, Small Industrial Estate, Kot Lukhpat, Lahore, Pakistan.

2008

(B.Sc) Electrical Engineer

UNIVERSITY OF CENTRAL PUNJAB

UCP, 31-Main Gulberg, Lahore, (54660), Pakistan.

CGPA = 2.71

EDUCATION

I have design and manufacture many of the electrical equipments for sectors like manufacturing, transportation, building industry, production and distribution of electricity. They primarily design, employ and enhance electrical products for any purpose. VFD commissioning & parameters setting working on Delta, puma, Yaskawa inverters

OLAYAN DESCON INDUSTRIAL Co.

Electrical & Instrumentation Engineer

Missions or tasks realized: Served as electrical/instrument engineering department at olayan descon industry. Now I’m working with mechanical department in Yanbu to rise the status of workshop. I prepared the electrical and control diagram of rolling machine to keeping an eye on spare parts and raise purchase requisitions whenever required to control operation and for preventive maintenance, One of my major job functions is to work as site Asst. E&I Engineer in SAMREF at YANBU

TECHNOSOLUTION ENGINEERING

Electrical Engineer

Missions or tasks realized: As an Electrical engineer my core responsibilities are mainly involved in designing, site maintenance installation of electrical systems or components by focusing on health safety rulers, I prepared the electrical and control diagram of panels power factor panels, Servicing of Power factor and Energy improving issues, TSE register contractor of oil and gas at Total Parco depots in all over Pakistan, I’m serving as an permit holder at sites and project controller

ALPHA ENGINEERING & SERVICES

Site Manager

Missions or tasks realized: Electrical site engineers direct and oversee electrical engineering projects at construction sites, resolving issues and ensuring that work is completed according to specifications. They balance project management and engineering tasks ranging from designing electrical plans to monitoring contractors.

ZAHID ELECTROPLATING WORKS

Electrical Engineer

Missions or tasks realized: Responsible for Power factor, genset and Energy improving issues. Maintenance Serving and trouble-shooting of electroplating plants to achive the clients desired requirements in the field of surface treatments where our clients are Suzuki Honda Toyota and MG companies and we are here to meets the OEM’s automotive parts manufacturing goals & standards.

03-Mar-2013-To-27-Aug-2013

Address: P.O. Box 31120, yanbu al-Bahar 41951,

Kingdom Of Saudi Arabia.

30-Aug-2013-To-30-Sep-2013

Address: Plot #702, Block-3,

Sector C-2, Hamad Shaheed chowk,

Green town, Lahore, Pakistan.

01-Oct-2013-To-31-Oct-2014

Address: 13-B, Usman Street, Mateen avenue, Gondal chowk, College Road, Lahore, Pakistan.

01-November-2014-till Present

Address: Unit#20, Saidpur, Industrial area, Multan road, Lahore, Pakistan.

SELF PROJECTS

F.R Cables Spell petrochemical (Pvt) Ltd.

Involved in a project from the concept and detail of the design to implementation, testing and handover

Involved in maintenance programs’, gen sets.

Commissioning & parameter setting of intermediate wire drawing machine where two micro master 440 VSD is in master slave mode connected through communication port

Identify requirements of the customer.

Design products and systems.

Read technical drawings and design specifications.

Research appropriate solutions and estimate timescales and costs.

Make prototypes and models of products.

Propose modifications and retest products.

Qualify the final system or product.

Service and maintain equipment.

Prepare product documentation, give presentations and writing reports.

To monitor a product that is in market so as to improve its future design.

SAILKOT INTERNATIONAL AIRPORT LTD, S.I.A.L

Research appropriate solutions and estimate timescales and costs.

Troubleshooting on ATC tower, microcontroller base cards

Make prototypes and models of products.

Work to European, British and other standards.

Liaise with other design team members.

Liaise with contractors and clients.

Attend on site meetings.

SHELL INSTALLATION

Chaklala.

Troubleshooting on transformer rectifier at Nalah Lei.

Work on Cathodic protection issues on pipelines.

Give the standards for impressed current Cathodic Protection system.

Diagnosing insulation leakage in pipelines.

Taking the measurement of half-cell test

TOTAL PARCO PAKISTAN LIMITED

Safety Management System Training (HSSE)

On 9th-May-2018 at AVARI Hotel Lahore, Pakistan.

@zamanza40070042

Zaman Zahid

url.linkedin

+923*********

Syed Suleman Shah

ALPHA ENGINEERING & SERVICES CEO

Phone +923*********

adzihu@r.postjobfree.com

Usman Zahid

ZAHID ELECTROPLATING WORKS CEO

Phone +923*********

adzihu@r.postjobfree.com

REFERENCES

SOCIAL



Contact this candidate