Post Job Free

Resume

Sign in

Quality Control Power Plant

Location:
Australia
Salary:
5000 usd
Posted:
September 05, 2023

Contact this candidate

Resume:

Tt@*gf*z*fe**e*zzz

ZZZ*zzazqzz*sqz****Eqzesfe**x*Wf

A professional with more than 19 years in the field of instrumentation and control. I have been involved in local andsz2s international construction projects of coal power plant, refinery, mining and other indusrties. I have experience working with Korean, Japanese, Taiwanese and Arabian EPCs.

J4d

Electrical & Instrument QA/QC Commissioning

Newcrest Mining Limited

P.O Box 789 Port.Moresby. NCD

Lihir Island, New Ireland Province

Papua New Guinea

July 21, 2017 to the presence

Loop Check Instrument Supervisor / Guam Advance Systems, Inc.

2 X 150MW Coal Fired Power Plant

Thermal Visayas Energy-efficient Project

Sitio Looc 2 Barangay Bato, Toledo City

January 15, 2017 to April 15, 2017

QA/QC Inspector / TRUE NORTH

SMC LIMAY 4 X 150MW X 460 T/H RH-CFB Power Power

Carbon Lamao, Limay, Bataan

March 14, 2016 to January 07,202nd zzezzesponsible for supervising construction activities and trade and field personnel related to the discipline.

3źe2w1zMonitor daily construction details and daily progress in his area

Maintain the highest quality standards while administering good construction safety practices with all on-site activities.

Promotes job site safety, encourage safe work practices and rectify job site hazards immediately. Regularly participate in HSE meetings, toolbox talks and daily jobsite walks and keep a meticulous record of these.

Prepare reports and forecasts relatin5ze1zg relatin5ze1zg sto construction progress, job manpower forecasts etc.

Sorry 2ccthe activities of subcontractors to ensure compliance with specifications and procedures and with the project objectives for safety, quality, productivity, schedule and cost. Provide solutions to subcontractor’s problems in order to achieve the successful execution of the project.

Responsible for the implementation of construction work processes, project procedures and instructions within assigned operations.

Ensure that the material handed over to the Subcontractor is controlled, preserved and issued for the intended purpose.

Serves as a coach and mentor for less experienced staff

Instrument Supervisor / DAELIM PHILIPPINES

SM200 Coal Fired Power Plant, Phase 1 Project.Sarangani Energy Corporation, Maasim Sarangani Province

March 11, 2015 to January 31,2016

Supervise all installation of panels,junctions box,instruments,and other I&C devises.

Perform site acceptanc1e test (SAT) with the presence of the client, Yokogawa and Invensys triconex vendor.

Supervise termination of multi cable primary and secondary, final meggering / continuity test of multi cable for client acceptance

Perform Pre – Loop and final loop test of the transmitters,motor operated valve (MOV), Control valves, switches and on/off valves as per the I/O lest.

Board man in DCS during pre- loop and final loop test.

Troubleshooting and field calibration, configuration of transmitter, control valve,motor operated valve during pre – loop.

Involve in functional test,pre –commissioning,and start up.

Knowledgeable with hart communicator and other instrument test equipment.

Instrument Supervisor / DAELIM PHILIPPINES

RMP-2 Refinery Project, Petron Bataan, Alangan Limay, Bataan

July 5, 2013 to january 31,2015

Supervise to the contractor in installation,termination,function testing, calibration, loop checking and troubleshooting of control equipment and field instruments

Supervision of work and making daily diaries to support claims as per work pack/work order.

Planning and scheduling of material take-off,manpower/hour and equipments for efficient implementation of instrumentation works.

Responsible for reviewing and visual inspection of installation for quality control.

Coordinates construction activities to each related department involved on problem with installation those that are subject to field condition.

Planning and making decisions for field change due to discrepancy between other trade department to arrange and discuss to the higher parties.

Plans and organizes work activities through proper documentation control related in construction such as,loop-checking,3 acceptance test,punch list making of test package.

Implementation of proper procedures in installation,material specification and standard tools familiarization.

Responsible for developing a large team work to accomplish operation objectives.

Plan work flows,manage multi priorities and meet daily production targets while consistently reducing downtime.

Establish and maintain acceptable quality levels for all assigned products.

Implements disciplinary actions to employee for violation of project rules and regulations.

ensure all work is performed in accordance with applicable Environmental, Health, Safety, codes as required by state/local & company regulations

Instrument Supervisor / AL HUGAYET EST

KAUST Commissioning Project, THUWAL, Jeddah KSA

March 31, 2009 up to December 31, 2012

Ensures the consistency of field inspection and testing of instrumentation equipment according to the standard.

Worked as a KAUST Proponent Testing &Pre- commissioning methods according to site test plan, functional test and international standard work procedures.

Managed supervision of the contractors with close coordination with ARAMCO PMT and PID is regarding the overall day to day execution of the KAUST instrumentation project.

To provide the proponent with all the records of pre- commissioning tests related to instrumentation assuring that it passes the qualifications required.

Active member of the approving staff for all the pre-commissioning and commissioning checklist & test results involving instrumentation.

Actively involved in Pre commissioning and commissioning of instruments and equipment in BAS (Building Management System), DCS (Distributed Control System) as an application of PLC (Programmable Logic Control)

Instrument Foreman / ATS Construction International, Inc.

PASAR- Installation of Rectifier 1, Isabel, Leyte

September 01, 2008 up to December 12, 2008

Preparation of daily work activities and required materials on site.

Conduct daily toolbox meeting and precaution for the safety of work.

Conduct inspection on the workable area at the site before the work undergo.

Distribute people in their respective work area.

Supervise the work to insure that all electrical & instrument works are followed as per P&ID and location plan drawing and client established procedure.

Coordinate to supervisor and other personnel on the job site.

Conduct inspection for the safe condition of work, and insure the proper personal protective equipment (PPA) is applied.

Inspection and checkout of instrument materials, in compliance with the standard design, and specification for installation in the field.

Prepares of daily and weekly accomplishment reports based on actual versus target.

Instrument Foreman / ATS Construction International, Inc.

Petron MSF Utilities Project, Petron Bataan Refinery, Alangan Limay., Bataan

September 11, 2007 to May 20, 2008

Provide leadership in establishing systems, process to enhance the current level of effectiveness and efficiency.

Conduct advance inspection and coordinate electro-mechanical system on the workable area to insure all electrical & instrument installations in the field are based on standard procedure and clear routing for any obstruction, hold point’s and follow us per drawing approve by the client.

Request and arranged approve materials and assigned manpower to their respective working area.

Installation, calibration, inspection and troubleshooting of electrical and electronic instrumentation components (transmitter, switches, valves, sensors, etc.) and system to have the correct output reading.

Perform and gather some data, such as continuity test, insulation test, and loop checking.

Conduct routine check to ensure assigned manpower are working safely, free from hazards and use the right tools, right materials for the right job.

Scheduling of daily work activities and preparation of daily and weekly accomplishment report based on actual versus target.

Instrument Foreman / T. I. D. J

South Pars PH.6.7&8, Assaluyeh, Bushier Iran

October 25, 2005 – July 5, 2006

Assigned in Local Equipment Room (LER) for installation of all panels, such as ( ESD,DCS, Marshalling, F&G, FOC ), and perform the system cable, signal cable, power cable, and all panels, responsible and cable pulling, termination and installation of different kinds of instruments, pneumatic and electronics instruments, can read and interpret P & ID and other relevant drawings and diagrams, capable of handling people, support to supervisor, monitor work progress and material requirement, attend the progress review and technical meetings.

Instrument Technician / Iscosa

Riyadh 11392 K.S.A.

February 22, 2004 – June 26, 2005

Assigned in installation, termination, punch list preparation, loop checking, pre-commissioning, commissioning, start-up, and also have experience in fault-finding, troubleshooting, calibration, vibration monitoring, repair and maintenance (PLC, Sensors, Controls, Level, Flow, etc.) Ability to read and interpret drawings, block diagrams, knowledge in plant instrumentation and control, maintains housekeeping at work site and ensures tools and equipment are in good working condition. Adheres to all safety rules and regulations

Instrument Technician / Al Hammam Co.

P.O. Box 280256, Riyadh, 11392, K. S. A.

April 04, 2003 - February 21, 2004

Assigned in installation of instruments, like for example pressure transmitter, level transmitter, flow transmitter, differential pressure transmitter, temperature transmitter, thermo-couple, environmental analyzer and others, large experience in oil and gas projects, also and shutdown projects, perform pneumatic and hydraulic pressure and leak checks, knowledgeable in calibration in most instruments in oil and gas, termination, continuity test, and insulation resistance test, loop checking and pre-commissioning.

Electrical & Instrument Technician Maintenance / Petron Bataan Refinery Alangan, Limay, Bataan

June 04, 1997 - March 31, 2003

Responsible for troubleshooting electrical and instrumentation problems, predictive & preventive maintenance.

Directly report to maintenance coordinator.

Troubleshoots & repair problems with production equipment.

Locate electrical trouble by using multi- meter & Megger.

Knows the basic troubleshooting and repairs of electrical/ electronic control circuit for AC/Ad motor circuits. This includes the ability to reprogram and drive optimization.

Diagnose, analyze and repair electronic, electromechanical and instrumentation equipment, operating in all areas, utilizing meters, gauges and other testing methods.

Install, repair, adjust and calibrates various types of measuring, recording and controlling equipment necessary to monitor or run manufacturing lines.

Knowledge of PLC logic and related controls.

Assists in calling vendors for assistance with equipment.

Review work orders with resources as they are received, ask for clarification and confer with a request or for additional clarification when needed.

Performs work in the servicing of pumps, boilers, piping and related equipment.

Installation of electrical & instrument conduit in clouding of fabrication of support.

Installation of control panel.

Checking of power lines including motor with the use of Insulation Tester (Megger), Multi-tester, Clamp Ammeter

Installation of fire, water deluge system.

Calibration and instillation of instrument such as Control Valve, Transmitter, Thermocouples, Fire Alarm, Smoke Detector, Limit Switches.

Analyze / interpret inspection and calibration results, prepare report obtained during preventive maintenance routing inspection.

Calibration of malfunctioning transmitter

Calibration of control valve

Pull out of a defective control valve

Inspection and cleaning of flame detector in furnace

Pull out of defective transformer

Instillation of instrument tubing in control valve & transmitter

Recondition of contract of relay pressure gauge

Testing and commissioning shutdown project

Replacing of defective pressure gauge

Replacing defective thermocouple.

Inspection and verification of Electrical/Instrumentation Materials as per construction package.

Factory Acceptance Test,Site Acceptance Test, loop checks, functional test and commissioning of Instrumentation Works.

Installation of cable trays, conduits, transmitters, junction box, marshalling cabinets, dcs panels, pneumatic tubing, impulse lines and pneumatic air system.

Termination of field instrument, junction box and marshalling panels.

Calibration, loop checking, troubleshooting and pre-commissioning and commissioning.

Quality control and instrumentation design review competence inclusive of engineering drawings, such as. P&ID, ILD, datasheets, loop drawing, logic control diagram and hook-up drawing

Competency to issue Non-Conformance Reports with respect to instrument works to subcontractor and/or Vendor Personnel for rectification and/or back charge.

Trained in Plant safety

Team leadership and supervisory work experience.

Basic Practical Electricity Training Course

Republic of the Philippines/Department of Education, Culture and Sports

Bureau of Non-formal Education Region, Region V

February 10 – 17, 1990

NMYC, Certificate of Training (Electrician)

Republic of the Philippines/Department of Labor and Employment

MTC & PMPO, PEO Compound Masbate, Masbate

April 06, 1990

Building Wiring Electrician SEA BMB Consultants, Inc.

Republic of the Philippines/Department of Labor & Employment

Pambansang Sanggunian sa Laang-Bisig at Kabataan

April 20-23, 1990

Crude & Vacuum Heater Replacement

Saudi Aramco

Riyadh Refinery, K.S.A.

October 29, 2003

Calibration for Process Instrumentation

Meralco Foundation, Inc.

August 26, 2006 to September 30, 2006

Instrumentation and Control Servicing

Technical Education and Skills Development (NCII)

March 16, 2013

Electro-technical Institute

Instrumentation and Control Servicing NC II

January 7 – February 15, 2013

Masbate Colleges

Liberal of Arts

1990 - 1992

Electrical Technology

Bicol University School Of Arts And Trades, Legazpi City

1992 – 1994

Date Of Birth : March 14, 1972

Place of Birth : Masbate, Masbate

Gender : Male

Civil status : Married

Height : 5’5”

Weight : 143 lbs.

Religion : Christian

Nationality : Filipino

SSS No. : 33-6294656-6

Tin No. : 924-178-036

Passport no. : P1938366A

Phil. Health no. : 19-025811189-7

Person to be notified In case of emergency

Name : Marietta R. Viterbo

Address : 129 Goma Bagumbayan st

Masbate,City.

+653***-***-****

WORKING EXPERIENCES

PROFESSIONAL SKILLS

TRAININGS ATTENDED

EDUCATIONAL BACKGROUND

PERSONAL PROFILE

CHARACTER REFERENCES

Eng’g. Lorenzo R. De Leon

Chemical Supervisor/SMC Global Power

+639**-***-****

SMC Global Power

+639**-***-****

Mr. Young Chul Cho

E & I Manager Dealim

+639**-***-****

Engr. Adrian Reyes

Trainor Specialist

+639**-***-****

+639**-***-****

Mrs. Decena L. Coronel

Company Nurse/ Petron Bataan Refinery

+639**-***-****

SMC Global Power

+639**-***-****



Contact this candidate