Post Job Free

Resume

Sign in

welder skill from building construction association Singapore

Location:
Singapore, Central Singapore Community Development
Posted:
September 05, 2023

Contact this candidate

Resume:

MR YOUNUS

PROFESSIONAL

SUMMARY

Career Objectives: Looking for high

quality environment where my

knowledge and skis can be utlized to

be benefiting their feel confident

of discharging my duties effectively

and sincerely to reach the objectives

ofthe organization successful

EDUCATION

Clase Eight

Agi High School-adaripur

Bangladesh, Bangladesh

ore Trade Course

BCAAcademy- Singapore, Singapore

Construction Skilled

BCA Academi- Singapore, Singapore

Bess Building Construction Safety

Supervisor Corse, 02/2020,

Fonda Global - Singapore

SKILLS

+ PowerTools Operations + Calculations and Measurements

+ Overhead Welding Postion + MiG Welding

+ Hand Saw + Sheet Metal Fabrication

+ FluxCore (FCA) Welding + Welding nd Botting

+ Fabrications Knowledge + Pipe Welding

+ Scaffolding Safety + Welding Techniques

+ Hand and Power Tool Operation + Maintain Equipment

+ Grinding and Buffing + Structural Welding

+ Safe Work Practices + AWS Certified

+ TG Welding Expertise + Power Saws

+ Stainless Stel Metal Welding + Plasma utter

+ Engineering Drawings Analysis + Cutting

WORK HISTORY

Welder, 01/2002-01/2004

Wellson Marine Engineering Pte Ltd

+ SAW (ARCK) & FAW (MIG

+ Welded in flat, horizontal, vertical, znd overhead positions.

Welder, 08/2008 08/2012

‘Tellus marine Engineering Pte Ltd

+ Welded in flat, horizontal, vertical, znd overhead positions.

+ Inspected welds and checked eicsl measurements to meet specications,

+ Fabricated shop parts directly from blueprints.

+ Removed and repaired unacceptable welds with air arc and grinder to meet quality

guidelines

{6G ARCK (SMAW) TIG(GTAW) Welder 06/2013-01/2016

Citiwall Pte Ltd, - Singapore

+ GTAW (IG) WELDER

+ Welded in flat, horizontal, vertical, znd overhead positions.

+ Inspected welds and checked cical measurements to meet specifications,

+ Prepared welding equipment to perform advanced welding work

+ Chipped off excess weld slag, and spatter using hand tots

+ Completed welding projects using gs tungsten arc, gas metal ac, fux-cored ac,

plasma are, and shielded metal are squipment.

+ Trained and supervised junior welders to use proper techniques, apply best

practices and comply with quality standards,

+ Cut, grinded and bent edges of materials tobe joined forsnug fit using power

grinders and hand tools

+ Welded metal components in vertical, ovehead and flat positions

+ Bolted, clamped and tack-welded pats to secure components prir to welding

+ Welded various connections with high-quality final resus.

+ Completed projects safely by closely monitoring conditions when ightingtorches

andusing tools

6G ARCK (SMAW)) TI (GTAW ) Welder, 03/2017 03/2018

Citiwall Engineering Pvt Ltd Singapore

Welder, 11/2019. 11/2020

itiwall Engineering Pvt Ltd Singapore

+ Welded in flat, horizontal, vertical znd overhead postions

+ Inspected welds and checked erica measurements to meet specifications,

+ Fabricated shop parts directly from blueprints.

+ Removed and repaired unacceptable welds with air arc and grinder to meet quality

guidelines

+ Operated hoists, cranes, and powertools to dismantle equipment to find and

remove defective parts,

+ Chipped off excess weld slag, and svatterusing hand tots,

+ Set up and operated shielded metalare and gas metal arc welding equipment.

+ Trained and supervised junior welders to use proper techniques, apply best

practices and comply with quality standards,

{6G ARCK(SMAW), TIG(GTAW) Welder, 11/2020 11/2021

Alatern Technology Pvt Ltd- Singapore

+ Welded various connections with high-quality final resus.

+ Maintained safety by wearing protective equipment, staying alert and following.

procedures.

+ Cut, grinded and bent edges of materials tobe joined forsnug fit using power

srinders and hand tools

+ Welded metal components in vertical, ovehead and flat positions

+ Inspected welds and checked eicsl measurements to meet specications

+ Fabricated shop parts directly from blueprints.

+ Removed and repaired unacceptable welds with air ar and grinder to meet quality

guidelines

+ Prepared welding equipment to peform advanced welding work

+ clamped, held, tack- welded, heat-bent and bolted component partsto achieve

requited configurations and positions

+ Completed welding projects using gs tungsten arc, gas metal ac, fux-cored are,

plasma are, and shielded metal are squipment.

+ Operated hoists, cranes, and powertools to dismantle equipment to find and

remove defective parts,

+ Chipped off excess weld slag, and svatterusing hand tots,

+ Set up and operated shielded metalare and gas metal arc welding equipment.

66 TIc (GTAW)ARCK(SMAW)MIG(FCAW)Welder, 11/2023 - 11/2022

‘hou Vi Engineering Pte Ltd, -Singapore

1 GTAW) Ark (SMAW) &.MIG

+ Welded various connections with high-quality final resus.

+ Maintained safety by wearing protective equipment, staying alert and llowing.

procedures.

+ Cut, grinded and bent edges of materials tobe joined forsnug fit using power

grinders and hand tools

+ Welded metal components in vertical, overhead and flat positions

+ Inspected weld for accuracy and cenformance to specifications.

+ Bolted, clamped and tack-welded pats to secure components prir to welding

+ Completed projects safely by closely monitoring conditions when ightingtorches

andusing tools

+ Cleaned material surfaces to remove dirt or excess acid using chemical solutions,

wie brushes and grinders

{5G ARCK (SMAW) TIG (GTAW) Welder 03/2023 -Current

[RMT Engineering Pvt Ltd Singapore

+ Welded various connections with high-quality final resus.

+ Maintained safety by wearing protective equipment, staying alert and llowing.

procedures.

+ Cut, grinded and bent edges of materials tobe joined forsnug fit using power

grinders and hand tools

+ Welded metal components in vertical, overhead and flat positions

+ Inspected weld for accuracy and cenformance to specifications.

+ Bolted, clamped and tack-welded pats to secure components prir to welding

+ Completed projects safely by closely monitoring conditions when ightingtorches

andusing tools,

+ Cleaned material surfaces to remove dirt or excess acid using chemical solutions,

wie brushes and grinder.

+ Prepared for assembly by postinieg, aligning and securing parts using tools such

2siigs and vise.

+ Selected and operated shielded mera arc and gas metal arc welding equipment.



Contact this candidate