NAME
EDWIN J. CORNISTA
POSITION
TECHNICIAN / DRIVER
Unit C2,#28, Road13, Bagong Pag-asa, Quezon City,Pilippines +63-921-***-****) adzem0@r.postjobfree.com
Summary of Profile:
Work experienced in the field of telecommunication gained both in local and abroad projects.
Background and skills in Telecom implementation (installation,commissioning and integration), operation & maintenance of 2G/3G/4G networks including antenna tower rigging.
Carrying out Network Preventive Operation and Maintenance/Troubleshooting of Nokia (2G/3G/4G) Flexi/Multiradio/Airscale BTS and documenting them.
Installation Supervision and Commissioning/Integration of Nokia Flexi Edge/Multiradio/Airscale BTS .
Installation Supervision, Commissioning and Integration of Ericsson 2G/3G/4G equipment.
( Feeder / Feederless / RRH solution ).
Knowledge of all SOP's of site installation works 2G/3G/4G/5G of Ericsson and Nokia Solutions and Networks Equipment
Manage technical site survey activity and review TSSR before and as-built report after site activity.
Responsible for assisting, implementing and supervising various work activities related to installation and implementation of Telecom sites equipment such as, 2G/3G/4G/5G technologies end to end and in upgrade roll out project while adhering to the clients specificationS.
WORK EXPERIENCE :
COMPANY
FEI / COMWORKS
Period Covered:
Jan. 24, 2023 to Feb.28,2023
PLDT SLI – INSTALLATION & REPAIR
Technician / Driver
NCR – Makati CAMANAVA
Perform installation and repair of new subscriber line..
Migration SLI from copper to fiber optic cable and upgrading modem.
Conduct troubleshooting of undetected modems .
Involved in Radius/Red Fiber installation of new subscriber.
Laying unlimited length of SC-FOC from subscriber modem to NAP box.
WORK EXPERIENCE :
COMPANY
Teltrends Services Inc.
Period Covered:
May 08, 2021 to Nov. 3, 2022
Globe / Nokia Shanghai Bell 324/2G Migration Project
TI - Team Leader
Visayas Phils.
Manage the team in site installation of Panel Antenna, floor mounted outdoor Cabinet, GPS and laying DC power cable and CPRI to different type of tower mounted RRH.
Conduct installation,commissioning and integration of Nokia L26MM using ASIB,ABIC and AEHC RRH.
Involved in Nokia 5G rollout in the area of deployment, Lead the team in the installation, commissioning and integration of NR2600 (Using ASIB,ABIO and AEHC) NR700 ( Using ASIB,ABIL,ABIO,MDEA and FRPA / FHPD )
Installation, commissioning and integration of Nokia Airscale BBU, RRH LTE700/900/1800/2100.
Perform 2G(G9/G18) migration from HT to Nokia.
Perform Pre-BFT before site integration of new LTE band and Post-BFT after every activity .
Perform RET naming and have it verified by Nokia ICM NOC after every integration.
Conduct EAC installation,commissioning and simulation of active site external alarms and have it verified by Nokia/Globe NOC.
Installation of DC power system and perform AC power tapping and DC power taping to DCPDU.
Conduct site BFT ( Basic Functionality Test ) after new band integration for documentation and submit report timely after every integration.
Check antenna audit and PAT Doc's Photos taken before submission to documentation team.
Check and make sure team compliance to Nokia and Customer Clean as you go Policy .
Responsible for making sure the team has budget for mobilization and consumable materials .
Perform site assessment and conduct tool box talk before every activity and make sure all team members have there WAH ID's with them on-site.
Responsible on the implementationo of safety policy by maintaining safety work condition and ensuring observance of safe practices of entire ASP team member .
COMPANY
Martindale Technologies Inc.
Period Covered:
August 05, 2020 to Feb. 28,2021
Smart / Ericsson Ph15/18/19/20/HU/FTKproj
TI - Team Leader
NLZ - CKAB, Phils.
Manage the team in the Installation, commissioning and Integration of Ericsson LTE(4G)/2G GL1800 / mix mode with UL2100 bands ; L700 ; U850 and G900 with DUG / BB5216/R503 and BB6630.
Carry out site Pre-PAT assessment and update sites required materials defficiency for site clean-up activity prior to site PAT.
Request FTNoc Suppression and Unsuppression before and after site activity .
Perform site clean-up rectification and grooming prior to site RSA with Ericsson QA team.
Installation and commissioning of DC power system with dry cell and lithium batteries.
Installation of 8/12 and 22ports panel antenna .
Conduct Pre-SRS after site integration .
Perform alarm activation and simulation of all site external alarms.
Responsible for preparing reports, lead and organize the work within the implementation function of full service level agreed between the vendor and customer .
Responsible on the implementationo of safety policy by maintaining safety work condition and ensuring observance of safe practices of entire ASP team member .
WORK EXPERIENCE :
COMPANY
Ericsson Philippines
Period Covered:
August 07, 2019 to June 15,2020
Smart Comm. Ph15/18/19/20/5G proj
TI - Site Supervisor
NLZ, Phils.
Supervised Installation and Integration of Ericsson LTE(4G)1800 mix mode with 2G 1800 / L2100 mix mode with U2100 bands ; L700 ; U850 and G900 with DUG / BB5216/R503 and BB6630.
Responsible for the alarm clearing of the escalated trouble ticket and documented them .
Carry out site Pre-PAT assessment and update sites required materials defficiency for site clean-up activity prior to site PAT.
Request FTNoc Suppression and Unsuppression before and after every site activity .
Request site access permit/keys one day before activity to every customer area head .
Conduct 2G P-Abis migration installation/commissioning via TCU/SIU, Router6k..
Monitor and verify ASP site clean-up activity for Pre-PAT / PAT readiness .
Perform site upgrade of RUS radio type to ERS radio type mixed mode with 2G/3G bands.
Ensure ASP follow safety standard by conducting toll-box talk before commencing every site activity and make sure to register with Ericsson RA session.
WORK EXPERIENCE :
COMPANY
Nokia, Qatar
Period Covered:
June 30, 2015 up to Feb.17, 2019
Ooredoo LTE Project
TI - Supervisor
Doha, Qatar
Supervised Installation,Commissioning and Integration of Nokia LTE4CA(4G) 800/1800 RF sharing with 2G DCS / 2600/2100 bands ; Flexi Zone Outdoor Micro and Pico BTS ( Smallcell ) ; Flexi lite (3G)BTS.
Review TSSR submitted and make sure site proposals are aligned with the site material request (SMR)
Supervised team members health and safety compliance as per Nokia standard and procedures and ensures that self and installation team members are working according to the health and safety plan, SOP and requirements.
Supervised Telecom installation team members on site and takes charge of end to end site completion as per plan
Supervised feeder cable vswr sweep testing and PIM testing activity and make sure proper testing procedure are followed; proper connector attachment to feeder/jumper cable are observed .
2G/3G/4G Nokia Flexi/Multiradio/Airsacle BTS Commissioning, Installation, Integration, Functionality testing ; Operation and Maintenance / SW Upgrading support to Care team .
2G Nokia Flexi EDGE / Multi Radio BTS Commissioning, Installation, Integration & Functionality testing.
Performed site verification and pre-acceptance after activity and make sure supplier installation standard in conformity with customer are followed and snags are properly rectified and provide the documents required for the preparation of site folder/s.
Coordinate PTW/access pass processing for site required to avoid cancellation of activity .
Review Site Materials Request (SMR) List & coordinates/arranges for material delivery to site .
Attends technical site surveys (TSSR) & PAT's scheduled by the customer and sub-contractor .
COMPANY
ETSI Technologies, Inc.
Period Covered:
JAN. 2008 – DEC. 2010
Project Name
Position
Location
Date Start & End
GLOBE 3G MS
Field OPS.
NGMA
Performs day to day preventive & corrective maintenance, troubleshooting, upgrading of Globe/NSN WCDMA (3G) Flexi BTS and documenting them .
Commissioning of 3G Nokia Flexi WCDMA,
Respond to Emergency Call trouble and special activities within the area of responsibilities.
Performs frequency, IUB and software upgrade of 3G Nokia Flexi WCDMA BTS.
Cable Testing / Sweep Test using site master Anritzu.
Perform basic functionality testing.
Project Name
Position
Location
Date Start & End
Various Telecom Company
Projects
TELECOM SUPERVISOR
PHILIPPINES
1996 - 2004
PLDT, SMART, PHILCOM, LIBERTY TELECOM, GLOBE TELECOM( PALAWAN BACKBONE) - TELECOM UPGRADING PROJECTS.
Supervised Installation of SIEMENS SDH Fiber Optic & SDH Microwave Radio (SRT) including Multiplexers.
Supervised Installation of SIEMENS PDH Microwave Radio including Multiplexers.
Installation Rectification and Commissioning of Siemens SRAL XD Microwave
Coordinate with the Implementation Manager all the progress of on-going site installations and customer requirements on a particular area to deliver customer satisfaction.
Perform site survey and inspection to determine the status of site prior to installation.( i.e. tower and shelter )
Responsible for preparing all necessary materials need on a particular sites to carry on the sites installation.
Ensures that equipment installations conforms with NSN standards and customer specification.
Supervised equipment and materials delivery to the radio relay station and make sure that it is being handled properly.
Project Name
Position
Location
Date Start & End
Various Telecom Company
Projects
TELECOM TECH.
PHILS.
1991 - 1996
PLDT, SMART, ISLACOM, PT&T - TELECOM PROJECTS
.
Installation of different type of SIEMENS PDH Radio and Multiplexers including Parabolic Antenna.
Installation of Motorola ( D900 ) BTS for ISLACOM GSM Mobile project.
Installation of CTR 190/210 PDH MW for ISLACOM GSM Mobile project.
Performed the installation of Siemens SDH Fiber Optic equipment.
Assure that the installations conform with siemens standard and in accordance with the approved plan and customer specification.
Prepare As-built plan and update the customer existing equipment layout plan immediately after the installation was completed .
ETSI TECHNOLOGIES INC. FOREIGN DELEGATION PROJECTS :
Project Name
Position
Location
Date Start & End
Ooredoo LTE Ph2 Project
TI - Supervisor
Doha, Qatar
April 17, 2013 to June 30, 2015
Supervise Installation, Commissioning and Integration of Nokia LTE800/1800 RF sharing with 2G DCS / 2100/2600 bands ; Flexi Zone Outdoor Micro and Pico BTS ( Smallcell )
Check and verify site installation quality.
Check subcon compliance of NSN safety standard and procedures.
Update in IPM every site completed integration .
Project Name
Position
Location
Date Start & End
QTEL UMTS 900 Project
TI - Quality Supervisor
Doha, Qatar
Sep. 10, 2011 to Dec. 30, 2012
Supervise site installation, commissioning and integration of UMTS 900 / UMTS 2100 / DCS 1800 / GSM 900 then perform site PAT with the customer representative.
Check quality of installation and make sure it conforms with NSN and customer specifications.
Verify and check equipment request and delivery before site installation.
Installation and Commissioning of DCS 1800 and UMTS 2100 for In-Building Solutions.
Site Troubleshooting for undetected MDGA, MHA and RET .
Inspect subcon personnel for PPE complaint before site activity.
Update in ( IPM ) Integrated Project Management site status after integration..
Perform F2 carrier and CE ( channel element ) upgrade of existing 3G network.
Initiate site survey for possible LTE trial sites.
Perform alarm clearing and installation rectification of Flexi Packet (MW) radio Hub 800.
Project Name
Position
Location
Date Start & End
CELCOM NodeB Modernization Project
TI Site Supervisor
Kuala Lumpur Malaysia
Dec. 15, 2010 to March 15, 2011
Performs troubleshooting / isolation and clearing of alarms of CELCOM / NSN WCDMA (3G) Flexi BTS.
Cable Testing / Sweep Test using site master Anritzu.
Coordinate and report to customer FOD personnel before and after every site activities.
Proceed to and locate site by means of GPS Navigator.
Perform basic functionality testing.
Project Name
Position
Location
Date Start & End
WATANIYA ( NEDJMA ) BTS Roll-out Project
Siemens PDH MW Comm’ng.
Oran, Algeria
Oct. 2007 - Sept. 2008
Supervised SRAL XD Microwave Radio Installation, Commissioning and perform BTS Site Integration.
Telecom implementation and provissionary acceptance with customer / operator representative.
Ensures that equipment installations conforms with NSN standards and customer specification.
Project Name
Position
Location
Date Start & End
STARHUB PDH MW Roll-out Project
Siemens PDH MW Comm’ng.
Singapore
Sept. 2005–April 2006 / March 2007–April 2007
SRAL XD MW 24/7 operation and maintenance.
Implementation Commissioning of SRAL XD MW equipment.
Commissioning of SRAL XD MW software and hardware capacity upgrade.
Performed site verification for proper installation of antenna, outdoor unit and indoor unit as per customer specifications and conform to siemens standard.
Perform Preliminary Acceptance Test of SRAL XD MW completed links.
Project Name
Position
Location
Date Start & End
LIPPO – MAXIS 2G/3G Co-located Roll-out Project
Infra. Site Survey Supervisor
Jakarta, Indonesia
May 2005 - July 2005
Perform technical site survey for suitable location of Tower & Shelter for 2G & 3G Mobile System.
Prepare survey report base on data gathered on site.
Coordinate to Radio Network Planning for the required height of the GSM antenna.
Project Name
Position
Location
Date Start & End
BANGLALINK BTS Swap and Roll-out Project
BTS Swap Supervisor
Dhaka, Bangladesh
Dec. 2004- March 2005
Perform installation and supervision of swapping Ericsson RBS (Radio Base Station) to Siemens 2G BS240 & replace old panel antenna to a new GSM antenna.
Ensures that telecom installations conforms with Siemens standards and customer specification.
Implementation Commissioning of SRAL XD MW equipment and perform BTS site integration.
Supervise installation of ELTEK rectifier.
Perform Installation supervision, commissioning and Troubleshooting of Microwave Radio SRAL XD (System Radio Access at Low Capacity)
Perform installation supervision of siemens BSC.
Project Name
Position
Location
Date Start & End
DIGI swap – out Project
BTS Swap Supervisor
Kuala Lumpur, Malaysia
July 2003 – July 2004
Manage the team in the Hot Swap Installation and Commissioning of Base Transceiver Station from Ericsson to Siemens 2G BTS BR 7.0, particularly BS240, BS240XL, BS241, BS 82 type. Ensure that the installations are in standard and in accordance with the approved plan and customer specification.
Coordinate with Installation Swap Manager all the progress of on-going site installations and customer requirements on a different particular area to deliver the customer’s satisfaction. .
Perform Technical site survey and inspection to determine the status of site prior to the swap out activity.
Assist and support the Siemens Acceptance team during their acceptance specially when requires joint troubleshooting.
Provide support on the Radio Network Planning on going optimization.
Prepare an As-Built plan and update the customer existing equipment layout plan immediately after the installation is completely done.
Follow up the day-to-day technical problems encountered by the team during the installation .
Project Name
Position
Location
Date Start & End
SABAFON TELECOM Mobile Roll – out Project
Installation Supervisor
Sana’a, Yemen
Mar.2001–August 2001
Installation Supervision and performed siemens BTS240 site network integration.
Performed Installation Supervision of BSC, TRAU and SRAL XD MW ( Low Capacity ).
Installation of Siemens DC power supply system particularly GR 40 rectifiers including batteries.
SKILLS INVENTORY
Language/s / Fluent
English, Tagalog
Soft Skills
MS Excel / Word / Powerpoint
Driving License (YES/NO)
YES
TRAININGS AND CERTIFICATES
Course Title
Training Center – Location
Date Attended
Construction Occupational Safety and Health {COSH)
Medalla Building, Cubao,Quezon City, Philippines
Oct. 31, Nov. 1, 7, 8, 2020
Airscale LTE Radio Access System ( RA4112-17-LTE )
Nokia Solutions & Networks - Doha, Qatar
July 30, 2017
IP and Ethernet Essentials for Flexi Packet / Flexi Packet Multi Radio Installers ( CT3408-01A )
Nokia Solutions & Networks - Doha, Qatar
Feb. 5 to Feb. 6, 2014
Nokia Flexi Multiradio Installation and Commissioning RL40 ( RA4110-05 )
Nokia Solutions & Networks - Doha, Qatar
April 18, 2013
Flexi Packet Multi Radio ( FPMR Hub 800 ) Installation and Commissioning
Nokia Solutions & Networks - Doha, Qatar
June 4, 2012
Flexi WCDMA BTS Installation and Commissioning ( RA4531-04N )
Nokia Solutions & Networks - Doha, Qatar
Oct. 27 to Oct. 28, 2011
Flexi Packet FP 15 – Operation Administration ; Maintenance and Commissioning.
Kuala Lumpur, Malaysia
June 20 to June 24, 2011
Nokia Flexi EDGE BTS Training.
ETSI - In - house
June 2010
Nokia WCDMA Flexi BTS ( RU10 version
ETSI - In - house
May 2010
Nokia Flexihopper Installation & Commissioning .
Bandung, Indonesia
June 2007
GSM Basics & SBS Commissioning .
ETSI - In - house
June 2003
Antenna Installation & SRAL Comm’ning Course .
ETSI - In - house
March 2003
SRAL Enabling Course .
ETSI - Mercedes
July 2002
Andrew Cable Splicing & Connector Attachment .
Makati City, Phils.
April2002
SDH Introduction / SDH Basic training .
ETSI - In - house
January 2000
Installation for Siemens Transmission Systems .
Bandung, Indonesia
February 1994
Contact Number :
Mobile # : +63-921-***-****
email : adzem0@r.postjobfree.com
EDUCATIONAL BACKGROUND
College Diploma
Diploma in Radio Communication Technology
Name of School
Cebu Technical School, Cebu City, Philippines
C U R R I C U L U M V I T A E