Period
Country Summary of activities performed relevant to the Assignment.
Sep 2023-
2020
Sri Lanka • Project management, Documentation, Coordination part, Design changes, Rate Analysis,Utility works & Testing utility works. Jul 2019-
2017
Sri Lanka • Utility Construction Works
1.SPS 10, SPS 13A, SPS 16, SPS 15 Pump
stations.
2.SEWER MH
Nov 2017 — 3.ELECTRICAL MH,Testing & Commisioning 2016
Sri Lanka • Laying of DI Pipes.
• Tunnel Crossing.
• Steel Bridges Lunching. (Long 40m & 19m Arch Model, Height 2.55m)
Aug 2016 —
2015
Sri Lanka • Embankment Excavation. Board Piling paving ABC, Asphalt, Overpass, Under pass structures
Sept
2015 -
2014
Sri
Lanka
• Earth works, ABC nad culvert precast construction, Monthly Progress updates
Aug 2014 —
Nov 2012
Sri Lanka • Laying of Dia 250 mm, 300 mm, 350 mm, 400 mm, 450 mm, 600 mm, 900 mm, Ductile Iron transmission main from WTP to Harana, Sigiriya, Inamaluwa, Kandalama, Galewela, Kithulhitiyawa.
Distribution main 63mm,
90mm, 110mm, 160mm, 225mm, 280mm u PVC Gauge 1000type
• Water Reservoir Tank 400m3 Sigiriya (Construction top of the rock)
• Water reservoir Tank 600m3 Habarana(Construction top of the rock)
• Concrete pumping methods use for reservoirs. (200m horizontal length
& 42m Vertical Height)
• Submission IPC
Nov 2012 -
May 2009
Sri Lanka • Overall pIanning& management for laying of
Dia600mm, 800mm, 1100mm,1200mm Glass reinforced
• DEEP excavation (7.5m) with proper shoring methods
• (Interlocking piling with Silent Hammers & Trench Box shoring methods),
• Lateral connections, Placing manholes,
Lagoon
Crossing, Casting concrete of
• Thrust blocks
• Handling & procedure fallow up PE Welding Machine April
2009 - Ju y
2007
Sri Lanka • Responsible for laying of transmission mains.
• Management & labor handling, Hydro testing
• Pipe laying in Marshy Areas
• Preparation of necessary arrangements for shoring works before excavation
• Pile hacking, Placing of pile caps & Concreting
Dec 2006- • Pipe laying on pile caps & back filling Mar 2005
Sri Lanka • Officer In charge Transmission pipe line, Sedimentation Tank, Clear WaterTank
• Laying Of Dia 800mm, 1000mm, 1200mm
DI, Transmission Main
• Coordination of Hydro Testing
• Road re—instatement
• Steel Shuttering & Ply wood Form Work Installation.
• 25000 m3 Concrete volume of KG-01 Project.
2004 Sri Lanka • Assisstant Engineer, Precasting yard soil test China Geo Engineering Corporation,
Site in charge
Hoeval Construction Engineering
(Pvt) Ltd Site in charge
China State Engineering
Corporation Pvt (Ltd) Assistant Site
Manager China National Aero
Technology International Engineering
Corporation
(Va Catic—Eng) Tech Wabag Of Limited China Site Site Engineer Engineer China Geo Engineering Corporation
Site Engineer
China Geo—Salcon—Access JV Site
Engineer
3. Employment Record Relevant to the Assignment:
Employing organization and your title /
position. Contact information for
Sinohydro Corporation Limited Project
manager
Hazama Undo
Corporation (Phase 2 Project) Project
manager
Royal Arc Engineering (Pvt) Ltd Site
Engineer
Date of Birth: 21
st
December 1974
Citizenship: Sri Lanka
Education: • Degree BSC, University of Ruhuna, year 2006
• City and Guilds, institute, year 2007,2008,2009
APPLY FOR SUPERVISOR
CURRICULUM VITAE (CV)
Position Title and
No.:
Supervisor
Name of Key Expert: Madawanage Don Shirantha Perera Speaking Excellent Excellent
Excellent
Detailed Tasks Assigned ”
I
Consultant’s Team of
Name of Project: Bandaranayake International Airport Development Project Duration & Months: 2Years Location: Sri Lanka Client: Airport & Aviation Services (Sri Lanka) Limited Main Project Features: Utility Construction Works
(Specify)
Position Held: Project manager Activities Performed:
• Utility Construction Works (Specify) Sewer Disposal System SPS 10, SPS 13A, SPS 16, SPS 15 Pump stations. SEWER MH ELECTRICAL MH
Name of Project: Colombo City Water Supply Improvement Project — Phase 01 Duration & Months: Nov 2016 — 2017 Location: Sri Lanka
Client: National Water Supply and Drainage Board Main Project Features: Provide Drinkable Water Position Held: Site Engineer Activities Performed:
• Laying of DI Pipes.
• Tunnel Crossing.
• Steel Bridges Lunching. (Long 40m & 19m Arch Model, Height 2.55m) Name of Project: Extension of high way Road Andarawewa — Wetiya Duration & Months: Aug 2016 — 2015
Location: Sri Lanka
Client: Road Development Authority
Main Project Features: Construction of Highway Road Position Held: Assistant Site Manager
Activities Performed:
• Embankment Excavation. Board Piling paving ABC, Asphalt, Overpass, Under pass structures Name of Project: Improvement and rehabilitation of priority road project Duration & Months: Sept 2014 — 2015
Location: Sri Lanka
Client: Road Development Authority
Main Project Features: Thiruwanaketiya Agalawatte road (B421) Road widining Position Held: Site Engineer Activities Performed:
• Earth works, ABC nad culvert precast construction, Monthly Progress updates 5. Language Skills (indicate
only languages in which you English can work):
Sinhala
Japanies
6. Adequacy for the Assignment:
Reading Writing
Excellent Excellent
Excellent Excellent
- -
Reference to Prior WorId'Assignments that Best Illustrates Capability to Handle the Assigned Tasks
Name of Project: Kandy North Integrated Water Supply Project at Alawathugoda Kandy Duration & Months: Nearly 3 Years & still work. Location: Sri Lanka Client: National Water Supply & Drainage Board Main Project Features:Provide of Drinkable Water. Position Held: Project manager
Activities Performed: Project management, Documentation, Coordination part,
Name of Project:
1. Ridiyagama Rd, Ambalanthota
2. 600mm for transmission main & construction of water treatment plant of capacity 15000m3 per day Duration & Months: July 2007 — 2009
Location: Sri Lanka
Client: National Water Supply & Drainage Board
Main Project Features: The scope of work in this project is supplying & laying of 40Km of DI pipes of diameter varying 150mm Position Held: Site Engineer
Activities Performed:
• Responsible for laying of transmission mains.
• Management & labor handling, Hydro testing
• Pipe laying in Marshy Areas
• Preparation of necessary arrangements for shoring works before excavation
• Pile hacking, Placing of pile caps & Concreting
• Pipe laying on pile caps & back filling
• General administration of the site.
Name of Project: Waste Water Disposal System for Rathmalana /Moratuwa & Ja—EIa/Ekala areas Duration & Months: May 2009 — Nov 2012
Location: Sri Lanka
Client: National Water Supply & Drainage Board
Main Project Features: Laying of sewer pipes, construction sewer MH, Precast segments, Trenches Protection, Dewater System Position Held: Site Engineer Activities Performed:
• Overall planning& management for laying of Dia600mm, 800mm, 1100mm,1200mm Glass reinforced
• DEEP excavation (7.5m) with proper shoring methods
• (Interlocking piling with Silent Hammers & Trench Box shoring methods),
• Lateral connections, Placing manholes, Lagoon Crossing, Casting concrete of
• Thrust blocks
• Handling & procedure fallow up PE Welding Machine
• Supervision of Air test, Vision test & Close Circuit Television (CCTV) Name of Project:
1. Anuradhapura Road, Dambulla
2. Greater Dambulla Water Supply Project Stage—01/project Cost 10000 Million SLR, under Exim bank India & peoples bank Sri Lanka loan
Duration & Months: Nov 2012 — Aug 2014
Location: Sri Lanka
Client: National Water supply & Drainage Board Main Project Features: Provide Drinkable Water Position Held: Site Engineer Activities Performed:
• Laying of Dia 250 mm, 300 mm, 350 mm, 400 mm, 450 mm, 600 mm, 900 mm, Ductile Iron transmission main from WTP to Harana, Sigiriya, Inamaluwa, Kandalama, Galewela, Kithulhitiyawa. Distribution main 63mm, 90mm, 110mm, 160mm, 225mm, 280mm u PVC Gauge 1000 type
• Water Reservoir Tank 400m3 Sigiriya (Construction top of the rock)
• Water reservoir Tank 600m3 Habarana (Construction top of the rock)
• Concrete pumping methods use for reservoirs. (200m horizontal length & 42m Vertical Height)
• Submission IPC
• Handling sub—contractors
• Hydro test carried out
• Use of LEAK Detector
• LS drawings modification to GFC
[Signature of the Expert
Date: 24/ 03/ 2023
Day/Month/Year
Name of Project: Kaluganga Water Supply Project (KG-01) Duration & Months: Mar 2005 — Dec 2006 Location: Sri Lanka Client: National Water Supply & Drainage Board
Main Project Features: Provide Drinkable Water Position Held: Site in charge Activities Performed:
• Officer In charge Transmission pipe line, Sedimentation Tank, Clear WaterTank
• Laying Of Dia 800mm, 1000mm, 1200mm DI, Transmission Main
• Coordination of Hydro Testing
• Road re—instatement
• Steel Shuttering & Ply wood Form Work Installation.
• 25000 m3 Concrete volume of KG—01 Project.
Name of Project: DBST Road (Hanwella — Malwana Road) Duration & Nonths:Mar 2005- 2004 Location: Sri Lanka
Client: Road Development Authority
Main Project Features: Road Development
Position Held: Site in charge
Activities Performed: Casting Precast, Cover slabs, Filling and compaction sub base.