Post Job Free

Resume

Sign in

Control System Electrical

Location:
Babalan, North Sumatra, Indonesia
Salary:
IDR 45.000.000 / Net
Posted:
November 10, 2023

Contact this candidate

Resume:

SUWITONO CURRICULUM VITAE **** - NOW

Name : Suwitono

Position : Electrical Superintendent HV / LV

Years Experience : 1990 – 16 June 2023 ( 33 years) Mobile Phone : 085********* / 062*********

E-mail : adz3fa@r.postjobfree.com

I had been worked at Leighton Group since January 2018 at site PT.Vale Indonesia Soroako,

( alliance from PT. Thiess Indonesia to PT. Leighton ) have been here on site Soroako since July 2014 and I have managed the construction of a wide range of Electrical Construction, Installation HV and LV electrical, commissioning,Electrical infrastructure and maintenance projects in the construction industry, and recently directed the completion of works on :

Electrical Maintenance and Trouble shooting

Electrical Engineering for Power Planning at Larona Lining Project and Electrical QA/QC

Project Power Line 11 KV

Shut down Project for Kiln and electric and Instrument device at Kiln

ESP Electric construction and control system

Electrical Heat tracing cable for Sulphur Dioxide Remediations and Install MCC include commissioning

Install cable Power line 11 KV

Install cable pole line 380 V { Twist cable )

Electrical Installation Wash bay and commissioning

Overhead Crane electrical system and commissioning

Transformer installation

CCP Electrical Installation and Commissioning, QA / QC electrical

Electrical trainer and COP Electrical .

Electrical Engineering for project Hospital

My responsibility in here like;

• Monitor costs and commitments through requisitions and invoices,

• Development and maintain a detailed product schedule,

• Ensuring the active involvement of team members,

• Delegate tasks to the right people in the long run or every day,

• Ensure the task or work is carried out according to recommended rules or quality standards such as Total Quality Management or Six Sigma by ensuring employees follow quality standards and by using a coordinated quality control checklist,

• Organize various meetings such as project progress meeting reviews, quality circles, and the like

SUWITONO CURRICULUM VITAE 1990 - NOW

• Develop strategies to overcome obstacles or delays by applying various methods such as using technical knowledge to related industries, innovating to simplify jobs, improvising with available resources, scheduling overtime to meet deadlines and other alternative ways

• Drafting rules related to Electrical safety standards Monitor project cost estimates

• Prepare and review engineering study design drawings and documents and material and equipment specifications

• Must have good communication skills in English and the ability to undergo in a Fire Alarm system

• Working in a energetic rapidly developing team-oriented environment supporting major international projects Electrical Engineers will be the hands-on contributors responsible for

• Design and development of electric power sensors and communication conversions

• Review and cross check electrical drawing from Client

• Design for electrical construction for Installation

• Design for Electrical Panel Distribution Board and control panel

• Design and detail the electrical and fiber interconnect scheme

• The choice of electrical network and optical fiber components for use in harsh outdoor environments

• Electrical load calculation performance

• Detailing the interconnection of fibers between network elements

• Provides field support and pro-active problem solving to minimize downtime

• Design and development of foundation and bonding solutions to protect personnel and equipment

• Analytical simulation performance to reduce power surges, excessive protection etc.

• Responsible for site supervision work related to FO and electricity

• Responsible for the implementation of new design construction requirements on the site relating to FO and Electricity

• Provide technical support for all company operations and maintenance of all mechanical equipment and systems in all installations

• Prepare for interpreting engineering review planning technical specifications

• Production engineering standard drawing interpretation of construction documents

• Monitor and test the progress of all electrical work

• Verify the quality of electrical work

• Monitor every process involved in electrical work.

• Ensure the quality of electrical materials and equipment according to standards in order to pass the inspection

• Recommend items that cannot be used be not standard.

• Document inspections and tests performed at the time of installation. SUWITONO CURRICULUM VITAE 1990 - NOW

• Analyze device history records and previous product documentation for future reference.

• Make Personal QC / QCA Bookkeeping and report to QA/QC Manager Senior High School IPA / Physics ( 1987-1990 )

At SMA Negri - 1 PangkalanBerandan ( North – Sumatra ) Has Certificate

Junior High School ( 1984 – 1987 )

At SMP Negri – 1 PangkalanBerandan ( North – Sumatra ) Has Certifiacte

Primary School ( 1978 – 1984 )

At SD Inpres 054938 PangkalanBerandan

Has Certificate

COURSES

1. Supervisor Mining Operation ( POP ) Dec 2016 ( Has certificate from ) 2. Electrical Training Ak3 Electric Specialist 22Agt - 4 Sept 2016 ( Has certificate ) 3.Train Of Trainer Electrical April 2014 ( Has certificate ) 4.Electrical Training k3 Electric Technician April 2013 ( Has certificate ) 5. Incident Investigation July 2009( Has certificate ) 6. Leader Shift and Supervision February 2006( Has certificate ) 7. Safe Behaviour Observation June 2005( Has certificate ) 8. Statement of Achievement Dec 2004( Has certificate ) 9. Electrical Theory and Practice Oct 2004( Has certificate ) Qualification

SUWITONO CURRICULUM VITAE 1990 - NOW

10. Heroes English Course 1983 – 1984( Has certificate ) 2023 – Present Leighton Contractors Indonesia.

Jan /2023 – Present Electrical Superintendent HV / LV and Elect Engineering Project PT.Vale Indonesia site Soroako ( South – Sulawesi ) for Project

:

- Power line transmission 11 KV

- Power line lighting 380 Volt

- Control Room Building

- Reline Project Kiln

- Calcine Transfer Car Project Demolish and Re Install with New

- Kiln Refractory project

- Hospital Building ( X – Ray Building & CT Scan Building )

- Larona Canal Installation of Geomembrane Liner

- Dust Bin Branch Installation and Refurbishment 500 T DG Responsible for :

- Ensures that the safety and health project plans are put into practice.

- Oversee the whole Electrical construction and

Maintenance process.

- Ensures that the wages and purchases are within the budget.

- Organize the workers to make certain that they are all performing well to satisfy the Electrical construction and Maintenance requirement.

- Record the total expenditure for the resources bought and the payments given for workers.

- Common inspection on the safety and performance of the workers.

- Mediate with inspectors of the government on the customary requirements of the site with respect to its safety and licenses.

- Track the Electrical construction and Maintenance process to make sure that it is completed on time.

- Take charge of the subcontractors and see to it that they are punctual.

- Ensure that the budget is maintained. At the same time quality is also preserved.

- Records the progress of the project in association with the Supervisor

- Electrical Engineering

Experience

SUWITONO CURRICULUM VITAE 1990 - NOW

- Responsibility for all electrical reports and

Documentation

- Make report of electrical QA/QC and give to QA/QC Manager

2013 – 2018 PT.Thiess Contractors Indonesia .

July 2014 – Dec

2017

Electrical Senior Supervisor HV / LV at Site PT.Vale Indonesia site Soroako ( South – Sulawesi ) for Project :

- Electrical Installation of Electro Static Presipitator ( ESP )

- HV cable termination at Switchgear and Transformer B17, B18, B4 and B5

- Electrical shutdown Maintenance Kiln

- Sulphur Dioxide Remidiation Electrical Installation

- Calcine crane electrical Installation

- Washing bay electrical Installation system

- Hoist Crane electrical installation

- CCP Electrical Installation

Responsible for:

- Responsibility for the safety in the work and make good team work

- Responsibility electrical for construction and MEP

- Responsibility for Electrical Maintenance and shut down for Job

ESP, KILN, Burner, EHT cable

- Preparing and check materials as per drawing for the project

- Make Schedule for the Jobs

- Understanding with Electrical Standard as Per Project Standarization

- Control and check work stndard for electrical Installation

- Witnessing and sentencing of all site inspections within their disciplines

- Coordinate all site inspections with Client

- Ensure that all inspection reports are accurate and that all attached documents are current status

- Ensure all work is correctly prepared prior to any inspection being undertaken

- Review all inspection reports for compliance

SUWITONO CURRICULUM VITAE 1990 - NOW

- Assist the site QC manager in the organisation,

maintenance and control of the quality system

- Lease with the site construction engineers and provide assistance when requested

- Prepare non conformance reports to the QA manager and assist in developing corrective actions

- Assist the QC manager and construction manager in resolving any discrepancies and ambiguities

- Coordinate with the Client QC inspectors for the resolution of site problems

- Coordinate with the Client to ensure that

communications exist and are maintained

- Assist with Client in the resolution of drawing

interpretation

- Attend the weekly QC meetings

- Review work procedures and method statements for compliance with good work practices and the customers contract specializations

- The issuance of non conformance reports in conjunction with the site QC manager

- Compliance with the site's health and safety regulations April 2014 – July

2014

Electrical Course for Train of Trainer at PT.Thiess Contractors site BalikPapan

Training For

- Alternating Current Machine

- Carry out repairs to single electrical circuits

- Conduit, Cable Tray & Trunking System

- Drawings and Diagram for Electrical Work

- Electrical Installation-Protection & Method Device

- Electrical Wiring & Equipment

- Generator Set

- Perform Electrical Measurement

- Perform manual soldering desoldering - electrical electronic components

- Shutdown & Isolate Machine

- Single and Three Phase Circuit

- Terminate and Connect Electrical Wiring

- Test, evacuate and Charge refrigeration System

- Transformer

- LOTO

- Electrical Power tools

SUWITONO CURRICULUM VITAE 1990 - NOW

Sept 2013 – April

2014

Electrical Inspector for Lahai Coal Project at PT.BHP Billiton site Haju ( Conveyor system, MCC room, Generator synchronize, Stock file lighting, Camp, Hospital, fuel dispencer, weight bridge and water treatment )

( Central Kalimantan )

Responsible for ;

- Understanding with Electrical Standard as Per Project Standarization

- Control and check work stndard for electrical Installation

- Witnessing and sentencing of all site inspections within their disciplines

- Coordinate all site inspections with the site

subcontractors and client

- Ensure that all inspection reports are accurate and that all attached documents are current status

- Ensure all work is correctly prepared prior to any inspection being undertaken

- Review all inspection reports for compliance

- Examines Installation of Electrical Systems

- Investigates Code Violation Occurances

- Monitors Assigned Construction Areas

- Assist the site QC manager in the organisation,

maintenance and control of the quality system

- Lease with the site construction engineers and provide assistance when requested

- Prepare non conformance reports to the QA manager and assist in developing corrective actions

- Assist the QC manager and construction manager in resolving any discrepancies and ambiguities

- Coordinate with the customers QC inspectors for the resolution of site problems

- Coordinate with the site subcontractors to ensure that communications exist and are maintained

- Commissioning all of the electrical equipment for power and control

- Responsibility of the electrical safety and the system of equipment

- Signed of and check Electrical QA/QC report from Sub Contractors

SUWITONO CURRICULUM VITAE 1990 - NOW

Nov 2014 - Jan

2015

Electrical Senior Supervisor for OFFSHORE Project Electrical Installation on Platform at PT.Saipem site KarimunBatam Island Responsible for :

- Responsibility for all the job and safety for job

- Responsibility with all Electrical tools and equipment

- Responsibility maintenance for all area

- Estimate materials for every location before start job

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Control the men and check standard drawing

- Electrical Pre Commissioning and test equipment

- Organise for electric maintenance High Voltage an low voltage for all areas

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

- Minimize coast for materials and Men power

- Design electrical control system drawing

- Modification control wiring

- Communication with crew for minimize problem and fix the problem

As electrical junior engineering

Dec 2012 – Sept 2013 PT. GramaBazita Engineering

Oct 2012 – Sept 2013 Site Coordinator for Project MEP at site PT.Newmont Nusa Tenggara ( Sumbawa – NTB )

SUWITONO CURRICULUM VITAE 1990 - NOW

Project include

a. Maintenance AC building and Excavator for Loading b. Maintenance Fire system

c. Maintenance Fiber Optic and Communication

d. Maintenance Electrical HV and LV

e. Project Mess Hall

f. Project Work Shop

g. Project Repair Cable ladder at Processing Plant Responsible for

- Provide staffing and management support to all employees for various assignments at customer premises

- Maintain contacts with customer's leaders and analyze requirements and service quality and sort out any relevant issues

- Prepare all personnel documentation perform orientation of new employees, prepare reports for employee payroll and timecard.

- Assist employees in check-ins, training and management of associate employees and documents all future requirements.

- Maintain knowledge on current staffing pattern and foresee future staff requirement to facilitate timely recruitment

- Provide an interface with potential candidates and clients to provide an update on order status.

- Prepare accurate documentation of client and applicant information.

- Perform interview on potential candidates to analyzebehavioral pattern and carry out relevant background checks to understand suitability for employment.

- Coordinate with employees to answer all queries and provide counselling as routine procedure.

- Monitor and update database information related to employee assignments and existing openings

- Provide safe working environment to employees and customers through efficient training programs.

- Develop creative solutions to satisfy customer requirements.

- Prepare customized and special project reports to meet customer demands.

- Manage various projects and ensure completion within deadline by attending to every detail of assigned projects.

- Maintain record of all company status by exhibiting ethical and strong business dealings.

Feb 2012 – Dec 2012 PT. Agin Court Resources at Martabe SUWITONO CURRICULUM VITAE 1990 - NOW

Feb 2011 – Sept 2012 Electrical Inspector for Low Land Project ( Before Start up ) and Electrical Senior Supervisor MEP ( After Start up Building ) Responsible for

A. As Electrical Inspector before operation

- Examine electrical systems and equipment.

- Inspect new and existing sound and security systems, wiring, lighting, motors, and generating equipment.

- Inspect the installation of the electrical wiring for heating and air- conditioning systems, appliances, and other components.

- Keep records and write reports.

- Report findings to contractors or government agencies.

- Report violations.

- Stop construction of non-compliant installations.

- Examine and inspect wire harnesses, control panels, coaxial cables, and electrical jig boards, for completeness of assembly, quality, and conformance to blueprints.

- Inspect wiring of assemblies for accuracy of stripping, soldering, and crimping, and for defects.

- Look for frayed wires and loose connections.

- Test continuity.

- Compile inspection reports.

- Write up recommendations for improvement.

- Verify wire and cable length.

- Examine parts and assemblies

- Responsible for inspecting the installation of electrical systems and equipment to detect faulty wiring and ensure they comply with electrical codes and standards. Visits construction sites and residences, performs inspection, and makes recommendations for improvement. B. Electrical Senior Supervisor MEP:

- Commissioning LVMDB and test equipment also commissioning for control system

- Piping inspector for water system

- Responsibility with all Electrical cost and equipment

- Responsibility maintenance for all area

- Estimate materials for every location before start job

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Control the men and check standard drawing

- Organise for electric maintenance High Voltage an low voltage for all areas

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

SUWITONO CURRICULUM VITAE 1990 - NOW

- Responsibility Generator Power system for all area

- Fix the trouble shooting of electrical control system also HVAC and Fire Alarm

- Modification Distribution Board and Control panel as per Drawing

- Minimize coast for materials and Men power

- Design electrical control system drawing

- Design electrical installation for building and make Standard

- Modification control wiring

- Communication with crew for minimize problem and fix the problem

- Back to Back with Electrical Engineering

Oct 2011 – Feb 2012 PT. Thiess Contractors Indonesia Oct 2011 – Feb 2012 Electrical Supervisor PT. ArutminSatui Coal Mining project Work shop Upgrade

Responsible for :

- Responsibility for all the job and safety for job

- Responsibility with all Electrical tools and equipment

- Responsibility maintenance for all area

- Estimate materials for every location before start job

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Control the men and check standard drawing

- Electrical QA / QC, Commissioning and test equipment

- Organise for electric maintenance High Voltage an low voltage for all areas

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

- Responsibility Generator Power system for all area

- Fix the trouble shooting of electrical control system and HVAC system

- Modification Distribution Board and Control panel as per Drawing

- Minimize coast for materials and Men power

- Design electrical control system drawing

- Modification control wiring

- Communication with crew for minimize problem and fix the problem As electrical junior engineering

Nov 2010 – Sept 2011 PT. Bajra Mandala Sakti Engineering Nov 2010 – Sept 2011 Electrical Supervisor for Project Coal Mining Conveyor 13 KM at KPC

SUWITONO CURRICULUM VITAE 1990 - NOW

Responsible for :

- Responsibility for all the job and safety for job

- Responsibility with all Electrical tools

- Estimate materials for every location before start job

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Control the men and check standard drawing

- Commissioning and test equipment for Electrical and HVAC system

- Organise for electric maintenance High Voltage an low voltage for all areas

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

- Fix the trouble shooting of electrical control system

- Modification Distribution Board and Control panel as per Drawing

- Minimize coast for materials and Men power

- Design electrical control system drawing

- Modification control wiring

- Communication with crew for minimize problem and fix the problem

Dec 2004 – Oct 2010 PT. Thiess Contractors Indonesia June 2010 – Oct 2010 Electrical Supervisor for Project Camp at Agin Court Resources Martabe

Responsible for :

- Responsibility for all the job and safety for job

- Responsibility with all Electrical tools

- Responsibility maintenance for all area

- Estimate materials for every location before start job

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Control the men and check standard drawing

- Commissioning and test equipment for Electrical and HVAC system

- Organise for electric maintenance High Voltage an low voltage for all areas

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

SUWITONO CURRICULUM VITAE 1990 - NOW

- Responsibility Generator Power system for all area

- Fix the trouble shooting of electrical control system

- Modification Distribution Board and Control panel as per Drawing

- Minimize coast for materials and Men power

- Design electrical control system drawing

- Modification control wiring

- Communication with crew for minimize problem and fix the problem

- Responsibility for report of electrical QA/QC and equipment test 2008 – 2010 Electrical Supervisor for Tabang Coal Project and Power Plant and Electrical Maintenance

Responsible for :

- Responsibility for all the job and safety for job

- Responsibility with all Electrical tools

- Responsibility maintenance for all area

- Estimate materials for every location before start job

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Control the men and check standard drawing

- Give instruction pulling cable control, instrument and power

- Commissioning and test equipment for Electrical and HVAC system

- Organise for electric maintenance High Voltage an low voltage for all areas

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

- Responsibility Generator Power system for all area

- Fix the trouble shooting of electrical control system

- Modification Distribution Board and Control panel as per Drawing

- Minimize coast for materials and Man power

- Design electrical control system drawing

- Modification control wiring

- Communication with crew for minimize problem and fix the problem 2006 – 2008 Electrical Supervisor at Senakin Coal Mining for Electric Maintenance Process Plant and Camp ( MEP ) Client PT.Arutmin Responsible for :

SUWITONO CURRICULUM VITAE 1990 - NOW

- Responsibility for all the job and safety for job

- Estimate materials for every location before start job

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Control the men and check standard drawing

- Commissioning and test electrical equipment and HVAC system

- Organize for electric maintenance High Voltage and Low voltage for all areas

- Responsibility and support Fix Plant activity

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

- Fix the trouble shooting of electrical control system at Fix Plant and Building

- Modification Distribution Board and Control panel as per Drawing

- Can make Electrical control drawing

- Minimize cost for electrical materials

- Make report for all electrical activity

- Responsibility for Generator Power all Plant

Dec 2004 – 2006 Electrical Supervisor Construction and Maintenance Camp Responsible for :

- Responsibility for all the job and safety for job

- Estimate materials for every location before start job

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Control the men and check standard drawing

- Commissioning and test electrical equipment and HVAC system

- Organise for electric maintenance High Voltage and Low voltage for all areas

- Install HV cable at Turbine

- Pulling cable Power, control and Instrument for Turbine

- Setting and commissioning MCC

- Responsibility and support Fix Plant activity

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

- Fix the trouble shooting of electrical control system at Fix Plant and Building

- Modification Distribution Board and Control panel as per Drawing

- Minimize cost for electrical materials

- Make report for all electrical activity

- Responsibility for Generator Power all Plant

SUWITONO CURRICULUM VITAE 1990 - NOW

Jul 1997 – Dec 2004 PT. Bajra Mandala Sakti Engineering 2003 – 2004 Electrical Supervisor Construction and Site Coordinator for Project :

- PT. Adaro Coal for Conveyor Project ( June – October 2004 )

- PT. Bina Mitra for Conveyor Project (April –June 2004 )

- PT. Adaro for Conveyor Project ( Aug 2003 – Oct 2003 ) Responsible for :

- Coordinator Project for new loading conveyor

- Responsibility for all the job and safety for job

- Estimate materials for project

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Install the instrument like :

a. Belt Drift switch

b. Pull wire switch

c. Belt Scale

d. Metal Detector

e. Magnetic motor

f. Level switch

g. Etc

- install Generator and Test

- install 150 kVA Transformer

- Fix the trouble shooting

- Install Panel ( Setting panel )and commissioning HV cable

- Megger and continuity test cable

- control the men and check standard drawing

- Commissioning and test the system

- Organise for electric maintenance all areas

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

2002 – 2003 Electrical Supervisor for Maintenance On shore at PT.Kupfect Petroleum Seram Island

Responsible for :

- Install Genset 1000 KVA and cable termination

SUWITONO CURRICULUM VITAE 1990 - NOW

- Install Instrument and control cable for Reda Pump System

- Maintenance small plant and Burner system

- Maintenance for electrical system and Instrument

- Maintenance Whell head Reda Pump and record data

- Install HV cable for the Reda Pump Power with Schlumberger,PT. and testing.

- Install and setting PLC include with the instrument withPT. Halliburton

- Install and setting panel include with commissioning for temporary process plant with PT. Expro Group.

- Reda pump maintenance and temporary process maintenance

- Joint with Schlumberger for REDA Pump maintenance

- Maintenance small Processing Plant with Expro Group

- Maintenance small burner

- Fix trouble shooting for electrical

- Operator DCS

Jan 2000 – 2002 Electrical Supervisor at site PT.Newmont Nusa Tenggara for Project

- Temporary Pumping Station System Phase – I until commissioning

- Lime slikerup grade project

- Ball mill system hydraulic project

- Pebble Crusher up Grade and Conveyor system project

- Building ( Permanent Camp ) project

- Truck Stop System in mining project

1999 - 2000 Electrical Supervisor at Site PT. Adaro Conveyor Upgrade Responsible for :

- New conveyor for by pass conveyor system

- Install Stamler, Crusher, Stock File conveyor

- Responsibility for all the job and safety for job

- Estimate materials for project

- Give toll box meeting every morning and organise the job

- Give instruction how to do the good job

- Install the instrument like :

a. Belt Drift switch

b. Pull wire switch

c. Belt Scale

d. Metal Detector

e. Magnetic motor

f. Level switch

SUWITONO CURRICULUM VITAE 1990 - NOW

g. Etc

- Fix the trouble shooting

- Install and commissioning HV cable

- Megger and continuity test cable

- Control the men and check standard drawing

- Commissioning and test the system

- Organise for electric maintenance all areas

- Give instruction for how to read the drawing and wiring in the panel

- Inspection materials

- Job under Schedule ( contract 5 months, finished 3 month ) Nov 1997 – Dec 1999 Electrical Supervisor site PT.Newmont Nusa Tenggara Project Infras Camp 2100, Camp 1200, Housing,

Commissary, Hospital, International scholl and Nursery jonit with PT. Thiess Contractors and Ballast Nedam Responsible for

- Electrical Installation building

- Fire Alarm system

- HVAC system and installation

- Grounding system

- Lightning protection system

- Pre commissioning and commissioning

- Electrical QA / QC

1996 – 1997 PT. Canang Indah Medium Density FiberBoard, As Electrical Foreman

Responsible for

Before start Producing :

- Install MCC and setting panel in control room

- Pulling cable LV and HV cable

- Pulling cable Instrument and Install instrument

- Setting Generator and connecting cables

SUWITONO CURRICULUM VITAE 1990 - NOW

- Check continuity and commissioning

- Testing the system of contiroll press machine

- Install power and control cable in Boiler.

- Connecting all motor cables.

After Production :

- Foreman for electrical and Production

- Control the fiber board production

1995 – 1996 PT. Wahana Trans Energy Project 150 KV Transmission As Skill man Responsible for

- Transmission 150 KV tower

- Erection Tower

- Finishing tower

- Pulling cable on tower

1994 – 1995 PT. Thiess Contractors and Thiess Linde for Project LPG Plant at PangkalanBerandanNort Sumatra as Leading Hand Electrical Responsible for :

- Instruction for pull cable Power, Control and Instrument

- Install lighting and pull cable

- Install all grounding system

- Install cable ladder and fabrication cable ladder

- Connecting cable for motor and control

- Termination cable in MCC

- Megger cable and check continuity cable

- Maintenance for 4 months when start production

1993 – 1994 PT. Elnusa for Seismic Project 3 D at

PertaminaPangkalanBerandan( North Sumatra )



Contact this candidate