Post Job Free

Resume

Sign in

Power Plant Project Manager

Location:
Brasov, 500100, Romania
Posted:
October 01, 2023

Contact this candidate

Resume:

CURRICULUM VITAE - PETRE DOANCA

Date of birth: 27.07.1956

Place of birth: Braila, Romania

Contact: email < adz21b@r.postjobfree.com & adz21b@r.postjobfree.com >

Cell phone: 004.0740185956 and WhatsApp 004.0724145494

EDUCATION

2000 – 2005: MASTER’S DEGREE/ DIPLOMAT ENGINEER @ SUCEAVA UNIVERSITY

Faculty of Electrical Engineering, Speciality- Power Generation - Boilers & Turbines, Electrical systems and Utilities

-The subject of diploma thesis-Hydro turbine Francis

1991/1994: Technical College Brasov, Power Generation -operation and maintenance of steam boilers & steam turbines

1979/1980 - one year technical degree in power plant. as boiler operator at Braila power plant

Note-18/03/2020 registered at BQA : Master’s Degree in Industrial Energetics and ERB : Professional Engineer in the discipline of Industrial Energetics

SPECIALIZED COURSES

Certified PMP professional

2010- Management of company (budget and organization) – Ploiesti city, by OMV Company

2018-PMP training course certificate

LANGUAGES

- English and French-advanced level

- Beginning level: Italian and Spanish, speaking

And Russian, read and write

- Technical Chinese language-beginner

SUMMARY of experience

- Commissioning, start up and construction, stabilized and ramping up until to maxim load.

-Worked in Thermal Power Plant, CCPP & Petrochemical, Steam Turbines, Steam Boiler (with steam drum & Supercritical), GT, HRSG, BOP and Utilities,

-Chemical Water treatment- Experience and knowledge of water treatment systems and equipment. Ultra-Filtration (UF), Reverse Osmosis (RO), pumps, motors, FDA, filtration,

-Title of jobs: - Management as : Project Manager, Commissioning Manager, Deputy Manager, Superintendent, Technical Consultant,

Combustion engineer

No colour: -Thermal Power Plant

- Coal, firing pulverizing and CFBB and PCF - 19 years

- Heavy fuel & natural gas firing -12 years

Yellow colour -Combined Cycle & Solar plant - 6 years 6 months (yellow colour )

Green colour – Petrochemical industry - 2 years and 6 months

-LNG, refinery - Utilities / Facilities & Process for, gas plant,

Date & company

Position in company

Location &

Type of project

Suppliers and equipment,

Job responsibilities

05/2023-

07/2023

Mitsubishi

GmbH/

EDF

France/ Cordemais-PFC

TFA for new design of coal mills, changed the coal mills to the mill for biomass/pellets

Check the drawings, quality documents, jobs description and check the installation of new equipment

11/2021-

11/2022

Senior Site Manager/

Project

Site Operation and Support

China/XiaminCFB Boiler

CFB Boiler, FGC, ESP, RDF, Sludge system,

Supplier- Andritz Austria

CFB Boiler/Incinerator, 110 t/h steam production, 45 bars,450 C, fuel: biogas, oil, and RDF & sludge

Responsible for construction and commissioning of CFB, FGC, ( boiler, piping and auxiliary equipment)

01/2021-

10/2021

Site manager

Photovoltaic

Plant

Romania/

Ucea de Sus

ENEL

55MW, on 122 ha,

Construction and start up

06/2019- 11/2020

FICHTNER GmbH

Boiler engineer

Technical Advisor

Botswana-

Morupule-B

Thermal Power Plant-coal firing-

CFB Boilers

4 units x 150 MW/unit

Boiler-CFBB,-Wuxi supplier, with

steam drum, steam @520t/h,138 bar,540C and RH with 425 t/h, 24.7bars,540C

ST-Dong fang supplier, ST with

Condenser, and 6 steam extractions

Remedial works,check the drawings, review design of piping, boiler construction, commissioning documents,

procedures of construction and commissioning

05/2018-

072018

Ansaldo Italy

Technical Advisor-

Lebanon- Deir Amar-CCPP

2units x 150MW/unit

2 x GT-Siemens suppliers

2 x HRSG-Ansaldo suppliers-

1 x ST-Ansaldo suppliers

Responsible for rehabilitation of HRSG, commissioning, start up, and hand over

06/2017-02/2018

GNPK Kauswagan

Commission-

ning manager

Philippines –Kauswagan,

Thermal Power Plant coal firing-

PC Boilers

4 units x 150 MW/unit

Boiler-PCB-Shanghai Boiler supplier

with steam drum, steam@ 450t/h, 138

bar,538C, and RH with 24 bars,540C

6 coal rotary mills/boiler

ST-Siemens supplier –ST with Condenser, and steam extractions

Responsibilities :Involved direct to : check and review design to all systems, drawing of construction, P&ID, PFD, check and monitor the progress and quality of construction works, check all O&M manuals, commissioning works, verify all the procedures to all equipment, steam boilers and turbines, chemical water treatment, waste water treatment,HVAC

02/2015 - 04/2017

FICHTNER GmbH

Technical Advisor

Vietnam,

Duyen Hay-1 &3

And extention

Thermal Power Plant coal firing-

PC Boilers x 2 boilers with steam drum

4 units x 622 MW/unit

Boiler-PCB-Dongfang supplier

with steam drum, steam@ 2028t/h,191 bars,546C and RH-40bar,546C

6 bowl mills/boiler,-RH-34bar,538C

ST-Dongfang supplier-ST with condenser, and steam 8 extraction VWO-649,2MW

Mechanical construction, pre-commissioning & commissioning, check and approve all the procedures and the test for hand over, chemical water treatment, mechanical completion certificates

-1 boiler S.C.

FGD-system

Boiler B&W –SC boiler, pulverising coal,P-255bar, T-566C, 2000t/h

ST-Toshiba-650 MW

07/2014 - 02/2015

ALSTOM

Shift manager-

Steam turbine

Estonia- Narva,

Thermal Power Plant-CFBB

1 unit x 330 MW

Boiler-CFBB Alstom France-with steam drum, fuel-shale & oil shale - ST-ABB Germany –ST with condenser

Commissioning & Operation of steam turbines and facilities, oil, water treatment, waste water,

05/2013 - 07/2014

KNS-Silcar

Shift Supervisor and

Commissio-

inning engineer

- New Caledonia- Koniambo Nichel mining mine

Thermal Power Plant

CFBB-coal and heavy fuel oil

2 x CFBB-supplier: Bharat Heavy Electrical,

steam@130 bars,540C,400t/h by drum,coal & heavy fuel, has bag filters, air preheater, by tubes

2 x ST x 135 MW/unit - Siemens/Sweden,ST in condensation and steam extraction

2 x Diesel generator- 5MW/unit

2 x GT x 50 MW/unit –supplier, Rolls Royce

Boiler construction, maintenance, commissioning & operation steam boilers, steam turbines, Diesel generators, GT and all electrical station- 66kv,33kv,6kv,0.4kv, all MOV, HVAC

10/2012 - 01/2013

Danieli Italy

Supervisor

Commissio-

ning

UAE, Abu Dhabi

Metal Steel Plant

-Gas heat exchangers, gas treatment systems, boilers, ST, compressorsCO2 towers,etc

-Danielli -Italy

Commissioning and operation of facilities, gas plant and iron ore

04/2012 - 07/2012

METKA

Commissio-

ning Deputy Manager

Syria, - Deir

Ali #2

Combined Cycle

Power Plant

2 x GT x 250MW/unit-Nuovo Pignione suppliers

2 x HRSG- NEM supplier

1 x ST x 250 MW - Siemens suppliers

Project stopped due to security problems

Mechanical construction, review all design, construction progress, pre-commissioning, commissioning, BOP, chemical water treatment,

10/2011 - 04/2012

Thyssen Krupp

Shift supervisor on

Utilities

Algeria, Arzew

Ammonia & Urea Fertiliser

3 x Steam Boilers-Machhi, Italy supplier-steam@ 100 bars, 450C, 200t/h

2 x ST x 50MW/unit-Nuovo Pignione suppliers,ST in condensation,

Commissioning and start-up, of steam boilers, ST, desalination plant, fuel system, all the auxiliary steam pipes in all the plant, included process area,HVAC

05/2011 – 08/2011

ANSALDO

Supervisor - Boilers

Marocco- Mohammedia city

Themal power Plant-PCB-

2 x Steam Boilers-Ansaldo Energia

supplier by steam drum, 135 bars, 540C, 460t/h, 6 rotary coal mills/boiler and heavy fuel

2 x ST x 150MW/unit-Ansaldo Energia suppliers, ST in condensation, with steam extractions

Mechaniccal maintenance & Operation the test and hand over the systems, the coal mills, type of mills-by rotary drum (grinding roll),

02/2011 - 05/2011

NEM

Technical Consultant

Egypt- Cairo- Kureymat

Solar &

Combined Cyle Plant

1 x HRSG-supplier-NEM-HRSG with HP

&LP steam drum, steam@100 bars, 540C

1 x ST x 70 MW with sun

36 MW-no sun

ST-suppliers Siemens/Sweden

1 x GT(6FA)x73MW-suppliers GE

Commissioning,Start up, and testing the boiler, during the day with more heatinng from the sun, and during the night, without the sun,testing maxim capacity, all alarms, protections, and hend over to client

07/2010 –12/2010

OMV

Project Manager

Petroche-mical

Romania

Utilities and facilities

Small boilers, heat exchangers, fuel tanaks,pumps station-Suppliers of Equipment: from Romania, and other european countries..

Involved direct in : contracts, bidders, budget, investment, design of equipment, and more job in office to organized and managed the contracts, and relations with stack holders

11/2008 - 06/2010

NEM & Oxy

Technical Consultant

- Oman- Mukhaizna

Combine Cycle

2 x HRSG- NEM supplier-HRSG with120 bar, for hot water production to inject into the boreholes of drilling

Involved direct in : construction and commissioning of boilers, verify & review all the drawings, P&ID, PFD, all O&M manuals

01/2008 - 10/2008

KBR&

TECHNIP

Commissio-

ning Manager- on Utilities

Yemen-Balhaf

LNG plant

2 x GT x 50 MW/unit, Nuovo Pinione supplier

3 x Steam boilers, Machhi supplier-by steam drum, 100 t/h,

3 x 5MW Diesel Generator

Construction, precommissioning and commissioning on Utilities, on shore, review all the drawings, P&ID, PFD, O&M manuals, fire fighting,water treatment,, HVAC,mechanical completion certificates

04/2007 -12/2007:

NEM

Technical Consultat

Oman-Sohar

Ammonia Plant

1 x Steam boiler-NEM supplier, by steam drum, 115 bar, 450C,165 t/h, boiler for steam for process

2 x HRSG-NEM suppliers-with steam drum

Chemical acid cleaning, steam blowing, start up, adjusted the burners, combustion, trial test, and hand over to client,

USA-Provo

Combined Cycle

Power Plant

2 x HRSG-NEM/Netherland-supplier-HRSG with 3 steam drums, steam @ 130 bars,540C,420 t/h

2 x GT x 250 MW/unit-GE supplier

2 x ST x 150 MW

Construction,Commissioning& start up of HRSG,review all the drawings, PDF & PID, all procedures,involved direct on chemical acid cleaning, steam blowing, adjusted the parameters, running test and hand over to client,

11/2006 - 02/2007

AGIP KCO

Trainer on steam boilers and steam turbines

Kazakhstan& Italy

OJT-Atyrau- Training -for power plant

Training with the engineers on steam boilers, HRSG,GT and steam turbines

06/2006 - 10/2006

ABB-Italy

Supervisor Comm. Electrical

Algeria - TFT

Gas station-

ABB Italy- suppliers for all electrical equipment-Diesel generator-3MW

Commissioning and start-up of electrical stations, 0.4kv and 6 kv,tested the UPS, transformers, Diesel generator and all MOV

04/2005 - 02/2006

SNC Lavalin,

Supervisor Com. Eng.

Algeria -Skikda

Combined Cycle

Power Plant

2 x GT x 250 MW/unit, - GE suppliers

2 x HRSG-Alstom supplier-boilers with two steam drums,for LP and HP system

2 x ST x 150 MW/unit-ABB Germany, suppliers

2 x Desalination plant

1 x Auxiliary boiler for heating the oil

Mechanical & Commissioning of HRSG, ST & GT, desalination plant and auxiliary boiler for heating the oil. Involved direct to air blowing all the pipes, flushing oil system of GT, flushing the HRSG, steam blowing to the ST

01/2005 - 04/2005

Snamprogge-tti

Comm. Eng.- Utilities on site

Libya - Mellitah

Gas Plant

Boilers-Machhi-Italy, supplier, steam @ 70 bars,450C, 150t/h,boilers by steam drum,

ST-Nuovo Pignione-suppliers-ST with back pressure, 25 MW,outlet pressure from ST, 25 bars

Commissioning on Utilities :steam boilers & steam turbine, test all equipments,FDF,IDF, BFW pumps, water system, fuel system

09/2004 – 12/2004

Toshiba

Technical Advisor

Romania –Paroseni-Plant

Themal power Plant-PCB- Coal and heavy fuel oil

2 units x 150 MW/unit

Boiler- TGM 84-Russian suppliers-with steam drum,steam @137bar,540C480t/h

ST-Russian supplier-ST in condensation, with steam extraction, H2 for cooling the generator

TFA-for steam turbine, check & review all the design & drawings of steam turbines, procedures and PID,translate from Russian into English

04/2003-

04/2004

Comm.

Supervisor Facilities

Kazakhstan

Aksay-Oil& Gas

4 x Steam Boilers, by oil gas,

Medium pressure-50 bars

Commissioning and operation on water and steam & facilities

02/2002 – 03/2003

Alstom France

Commissio-ning engineer

Malaysia - Sri Manjung

Themal power Plant-PCB

3 units x 700 MW / unit

Boiler-Alstom France-with steam drum,steam@192 bar, 540C,2400 t/h, 6 coal bowl mills/boiler,ESP for fly ash,Fuel: coal & heavy fuel

ST-ABB UK supplier- with condenser and steam extraction

Commissioning & Operation of pulverized coal boiler,steam blowing, adjust the control valves, adjusted HP&LP by pass station, chemical water parameters,

07/2001 - 12/2001

Ansaldo Energia

CCR operator

Lebanon - Zahrani

CCPP

2units x 150MW/unit

2 x GT-Siemens suppliers

2 x HRSG-Ansaldo suppliers-

1 x ST-Ansaldo suppliers

Operation of HRSG & GT & ST, fuel system, water treatment

03/2001 - 06/2001

Babcock &Willcox

Boiler Technical Advisor

Egypt –Alexandria-Sidi Krir

Thermal Power Plant

2 units x 350 MW/unit

Boiler-Babcock&Wilcox supplier- with steam drum, steam@137bars,540C,1100t/h,Fuel:gas and oil

ST-with condenser and steam extractions

Commissioning of boilers, adjusted the oil burners, combustion in furnace chamber, control valves

02/2001 -03/2001

ABB ALSTOM

Commissio-

ning engineer

KSA-Shoaiba

Thermal Power plant-Oil and gas fuel

3 units x 350 MW/unit

Boiler-ABB supplier-boiler with steam drum,steam @ 170b, 540C,1050t/h

ST-ABB-Alstom, ST with conndenser and steam eztraction

Mechanical & Commissioning on B.O.P, flushing the pipe, air compressors plant, fire fighting system, and fuel oil system

01/2001 -02/2001

ABB ALSTOM

Shift Charge Engineer

Marroco - Jorf Lasfar

Themal power Plant-PCB

2 units x 350 MW/unit and

Boilers-Alstom supplier-boiler with steam drum, steam@170 bars, 540C, 1050t/h, 6 bowl coal mills and heavy fuel

ST-Alstom supplier-ST with conndenser and steam extraction

Engineer for test and hand over of steam turbine & boiler by pulverised coal, trial test and hand over to client

08/1997 -06/2000

ABB ALSTOM

Commissio-ning Supervisor

- Mongolia – Ulaan Baatar

Themal power Plant-PCB-

3 ST x 25MW/unit and

4 boilers on common header to ST

Boiler&ST-Russian suppliers

Steam @ 80 bars, 530C, 120t/h, fly ash evacuation with Wet Scrubber system, Coal mills by balls,and Diesel fuel and intermediary coal fan to the burners

Construction, Mechanical, Commissioning & Operation of boiler by coal,check all construction work progress, review all the drawings, P&ID,PFD,

06/1995 -01/1997

ABB ALSTOM

Commissio-

ning Engineer

U.A.E. - Abu Dhabi-Taweelah Plant

Thermal Power Plant &Desalination

6 units x 125 MW/unit and desalination plant

Boiler- Babcock Germany supplier- with steam drum, steam@125bar,540C,400t/h, fuel;oil&gas

ST-ABB Germany supplier, ST with condenser, steam extraction,Electrical generator-cooling system by air

Commissioning & Operation of boiler and steam turbine-involved on chemical acid cleaning, steam blowing, punch list, test equipment,

09/1989 - 06/1995

RENEL

Shift & Technical Manager

Romania – Brasov city

Thermal Power Plant coal firing-PCB –and natural gas

2 units x 60 MW/unit

Boiler-PCB-UMGB Romania supplier,

With steam drum, steam @420t/h,137 bars, T-540C, 6 coal fan mills,40 t/h coal/mill,natural gas

ST-DSL-50,UMGB Romania, suppliers, ST with condenser, and 6 fixed steam extraction and one variable steam extraction for industrial steam

Commissioning, start up and Operation of Boilers&Turbines. All auxiliaries equipment as: fly ash& slag evacuation-wet system, coal system, air compressors,fire fighting,, H2 system, ESP, air preheater, Liungstrom type,

09/1979 - 06/1989

RENEL

Boiler Desk Operator

Romania-Braila city

Thermal Power Plant,

by heavy fuel and natural gas

3 units x 210 MW/unit and

Boiler-Russian supplier TKZ-boiler without steam drum, one through way,steam @ 137 bar, 540C,630t/h

ST-Russian supplier-ST with condenser and steam extraction

AND

1 unit x 310 MW/unit,

Boiler-Benson design, UMGB Romania supplier, one through way, positive pressure in furnace chamber, steam @ 192 bars,540C,1033t/h

ST-FIC330, Rateau-Schneider, with condenser and 7 steam extraction

Operation of boilers and steam turbines, prepared the oil guns-heavy fuel oil, checked the chemical parameters, verify all parameters, and keep in good conditions the unit to the normal parameters, air preheater, Liungstrom type,

Romania-Turceni city-1 year worked

Thermal Power Plant coal firing-PCB-

6 unit x 310 MW/unit,

Boiler-Benson design, UMGB Romania supplier, one through way, 6 coal hammermills/unit,, steam @ 192 bars,540C,1033t/h

ST-FIC330, Rateau-Schneider, with condenser and 7 steam extraction

Commissioning & start-up of boiler, with coal mills, involved direct to the chemical acid cleaning, steam blowing, and start-up, air preheater, Liungstrom type, and ESP, slag evacuation-wet system

-Others- special achievement-

-As a project manager, I had to participate to the bidding, prices of new equipment, and negotiations with vendors, verified the performance a new equipment and the price, verify the contracts between the client and EPC, and check all contractual conditions, penalties, etc

Driving license, category B-for both side (left and write)



Contact this candidate