CURRICULUM VITAE - PETRE DOANCA
Date of birth: 27.07.1956
Place of birth: Braila, Romania
Contact: email < *******@*****.*** & *******@*****.*** >
Cell phone: 004.0740185956 and WhatsApp 004.0724145494
EDUCATION
2000 – 2005: MASTER’S DEGREE/ DIPLOMAT ENGINEER @ SUCEAVA UNIVERSITY
Faculty of Electrical Engineering, Speciality- Power Generation - Boilers & Turbines, Electrical systems and Utilities
-The subject of diploma thesis-Hydro turbine Francis
1991/1994: Technical College Brasov, Power Generation -operation and maintenance of steam boilers & steam turbines
1979/1980 - one year technical degree in power plant. as boiler operator at Braila power plant
Note-18/03/2020 registered at BQA : Master’s Degree in Industrial Energetics and ERB : Professional Engineer in the discipline of Industrial Energetics
SPECIALIZED COURSES
Certified PMP professional
2010- Management of company (budget and organization) – Ploiesti city, by OMV Company
2018-PMP training course certificate
LANGUAGES
- English and French-advanced level
- Beginning level: Italian and Spanish, speaking
And Russian, read and write
- Technical Chinese language-beginner
SUMMARY of experience
- Commissioning, start up and construction, stabilized and ramping up until to maxim load.
-Worked in Thermal Power Plant, CCPP & Petrochemical, Steam Turbines, Steam Boiler (with steam drum & Supercritical), GT, HRSG, BOP and Utilities,
-Chemical Water treatment- Experience and knowledge of water treatment systems and equipment. Ultra-Filtration (UF), Reverse Osmosis (RO), pumps, motors, FDA, filtration,
-Title of jobs: - Management as : Project Manager, Commissioning Manager, Deputy Manager, Superintendent, Technical Consultant,
Combustion engineer
No colour: -Thermal Power Plant
- Coal, firing pulverizing and CFBB and PCF - 19 years
- Heavy fuel & natural gas firing -12 years
Yellow colour -Combined Cycle & Solar plant - 6 years 6 months (yellow colour )
Green colour – Petrochemical industry - 2 years and 6 months
-LNG, refinery - Utilities / Facilities & Process for, gas plant,
Date & company
Position in company
Location &
Type of project
Suppliers and equipment,
Job responsibilities
05/2023-
07/2023
Mitsubishi
GmbH/
EDF
France/ Cordemais-PFC
TFA for new design of coal mills, changed the coal mills to the mill for biomass/pellets
Check the drawings, quality documents, jobs description and check the installation of new equipment
11/2021-
11/2022
Senior Site Manager/
Project
Site Operation and Support
China/XiaminCFB Boiler
CFB Boiler, FGC, ESP, RDF, Sludge system,
Supplier- Andritz Austria
CFB Boiler/Incinerator, 110 t/h steam production, 45 bars,450 C, fuel: biogas, oil, and RDF & sludge
Responsible for construction and commissioning of CFB, FGC, ( boiler, piping and auxiliary equipment)
01/2021-
10/2021
Site manager
Photovoltaic
Plant
Romania/
Ucea de Sus
ENEL
55MW, on 122 ha,
Construction and start up
06/2019- 11/2020
FICHTNER GmbH
Boiler engineer
Technical Advisor
Botswana-
Morupule-B
Thermal Power Plant-coal firing-
CFB Boilers
4 units x 150 MW/unit
Boiler-CFBB,-Wuxi supplier, with
steam drum, steam @520t/h,138 bar,540C and RH with 425 t/h, 24.7bars,540C
ST-Dong fang supplier, ST with
Condenser, and 6 steam extractions
Remedial works,check the drawings, review design of piping, boiler construction, commissioning documents,
procedures of construction and commissioning
05/2018-
072018
Ansaldo Italy
Technical Advisor-
Lebanon- Deir Amar-CCPP
2units x 150MW/unit
2 x GT-Siemens suppliers
2 x HRSG-Ansaldo suppliers-
1 x ST-Ansaldo suppliers
Responsible for rehabilitation of HRSG, commissioning, start up, and hand over
06/2017-02/2018
GNPK Kauswagan
Commission-
ning manager
Philippines –Kauswagan,
Thermal Power Plant coal firing-
PC Boilers
4 units x 150 MW/unit
Boiler-PCB-Shanghai Boiler supplier
with steam drum, steam@ 450t/h, 138
bar,538C, and RH with 24 bars,540C
6 coal rotary mills/boiler
ST-Siemens supplier –ST with Condenser, and steam extractions
Responsibilities :Involved direct to : check and review design to all systems, drawing of construction, P&ID, PFD, check and monitor the progress and quality of construction works, check all O&M manuals, commissioning works, verify all the procedures to all equipment, steam boilers and turbines, chemical water treatment, waste water treatment,HVAC
02/2015 - 04/2017
FICHTNER GmbH
Technical Advisor
Vietnam,
Duyen Hay-1 &3
And extention
Thermal Power Plant coal firing-
PC Boilers x 2 boilers with steam drum
4 units x 622 MW/unit
Boiler-PCB-Dongfang supplier
with steam drum, steam@ 2028t/h,191 bars,546C and RH-40bar,546C
6 bowl mills/boiler,-RH-34bar,538C
ST-Dongfang supplier-ST with condenser, and steam 8 extraction VWO-649,2MW
Mechanical construction, pre-commissioning & commissioning, check and approve all the procedures and the test for hand over, chemical water treatment, mechanical completion certificates
-1 boiler S.C.
FGD-system
Boiler B&W –SC boiler, pulverising coal,P-255bar, T-566C, 2000t/h
ST-Toshiba-650 MW
07/2014 - 02/2015
ALSTOM
Shift manager-
Steam turbine
Estonia- Narva,
Thermal Power Plant-CFBB
1 unit x 330 MW
Boiler-CFBB Alstom France-with steam drum, fuel-shale & oil shale - ST-ABB Germany –ST with condenser
Commissioning & Operation of steam turbines and facilities, oil, water treatment, waste water,
05/2013 - 07/2014
KNS-Silcar
Shift Supervisor and
Commissio-
inning engineer
- New Caledonia- Koniambo Nichel mining mine
Thermal Power Plant
CFBB-coal and heavy fuel oil
2 x CFBB-supplier: Bharat Heavy Electrical,
steam@130 bars,540C,400t/h by drum,coal & heavy fuel, has bag filters, air preheater, by tubes
2 x ST x 135 MW/unit - Siemens/Sweden,ST in condensation and steam extraction
2 x Diesel generator- 5MW/unit
2 x GT x 50 MW/unit –supplier, Rolls Royce
Boiler construction, maintenance, commissioning & operation steam boilers, steam turbines, Diesel generators, GT and all electrical station- 66kv,33kv,6kv,0.4kv, all MOV, HVAC
10/2012 - 01/2013
Danieli Italy
Supervisor
Commissio-
ning
UAE, Abu Dhabi
Metal Steel Plant
-Gas heat exchangers, gas treatment systems, boilers, ST, compressorsCO2 towers,etc
-Danielli -Italy
Commissioning and operation of facilities, gas plant and iron ore
04/2012 - 07/2012
METKA
Commissio-
ning Deputy Manager
Syria, - Deir
Ali #2
Combined Cycle
Power Plant
2 x GT x 250MW/unit-Nuovo Pignione suppliers
2 x HRSG- NEM supplier
1 x ST x 250 MW - Siemens suppliers
Project stopped due to security problems
Mechanical construction, review all design, construction progress, pre-commissioning, commissioning, BOP, chemical water treatment,
10/2011 - 04/2012
Thyssen Krupp
Shift supervisor on
Utilities
Algeria, Arzew
Ammonia & Urea Fertiliser
3 x Steam Boilers-Machhi, Italy supplier-steam@ 100 bars, 450C, 200t/h
2 x ST x 50MW/unit-Nuovo Pignione suppliers,ST in condensation,
Commissioning and start-up, of steam boilers, ST, desalination plant, fuel system, all the auxiliary steam pipes in all the plant, included process area,HVAC
05/2011 – 08/2011
ANSALDO
Supervisor - Boilers
Marocco- Mohammedia city
Themal power Plant-PCB-
2 x Steam Boilers-Ansaldo Energia
supplier by steam drum, 135 bars, 540C, 460t/h, 6 rotary coal mills/boiler and heavy fuel
2 x ST x 150MW/unit-Ansaldo Energia suppliers, ST in condensation, with steam extractions
Mechaniccal maintenance & Operation the test and hand over the systems, the coal mills, type of mills-by rotary drum (grinding roll),
02/2011 - 05/2011
NEM
Technical Consultant
Egypt- Cairo- Kureymat
Solar &
Combined Cyle Plant
1 x HRSG-supplier-NEM-HRSG with HP
&LP steam drum, steam@100 bars, 540C
1 x ST x 70 MW with sun
36 MW-no sun
ST-suppliers Siemens/Sweden
1 x GT(6FA)x73MW-suppliers GE
Commissioning,Start up, and testing the boiler, during the day with more heatinng from the sun, and during the night, without the sun,testing maxim capacity, all alarms, protections, and hend over to client
07/2010 –12/2010
OMV
Project Manager
Petroche-mical
Romania
Utilities and facilities
Small boilers, heat exchangers, fuel tanaks,pumps station-Suppliers of Equipment: from Romania, and other european countries..
Involved direct in : contracts, bidders, budget, investment, design of equipment, and more job in office to organized and managed the contracts, and relations with stack holders
11/2008 - 06/2010
NEM & Oxy
Technical Consultant
- Oman- Mukhaizna
Combine Cycle
2 x HRSG- NEM supplier-HRSG with120 bar, for hot water production to inject into the boreholes of drilling
Involved direct in : construction and commissioning of boilers, verify & review all the drawings, P&ID, PFD, all O&M manuals
01/2008 - 10/2008
KBR&
TECHNIP
Commissio-
ning Manager- on Utilities
Yemen-Balhaf
LNG plant
2 x GT x 50 MW/unit, Nuovo Pinione supplier
3 x Steam boilers, Machhi supplier-by steam drum, 100 t/h,
3 x 5MW Diesel Generator
Construction, precommissioning and commissioning on Utilities, on shore, review all the drawings, P&ID, PFD, O&M manuals, fire fighting,water treatment,, HVAC,mechanical completion certificates
04/2007 -12/2007:
NEM
Technical Consultat
Oman-Sohar
Ammonia Plant
1 x Steam boiler-NEM supplier, by steam drum, 115 bar, 450C,165 t/h, boiler for steam for process
2 x HRSG-NEM suppliers-with steam drum
Chemical acid cleaning, steam blowing, start up, adjusted the burners, combustion, trial test, and hand over to client,
USA-Provo
Combined Cycle
Power Plant
2 x HRSG-NEM/Netherland-supplier-HRSG with 3 steam drums, steam @ 130 bars,540C,420 t/h
2 x GT x 250 MW/unit-GE supplier
2 x ST x 150 MW
Construction,Commissioning& start up of HRSG,review all the drawings, PDF & PID, all procedures,involved direct on chemical acid cleaning, steam blowing, adjusted the parameters, running test and hand over to client,
11/2006 - 02/2007
AGIP KCO
Trainer on steam boilers and steam turbines
Kazakhstan& Italy
OJT-Atyrau- Training -for power plant
Training with the engineers on steam boilers, HRSG,GT and steam turbines
06/2006 - 10/2006
ABB-Italy
Supervisor Comm. Electrical
Algeria - TFT
Gas station-
ABB Italy- suppliers for all electrical equipment-Diesel generator-3MW
Commissioning and start-up of electrical stations, 0.4kv and 6 kv,tested the UPS, transformers, Diesel generator and all MOV
04/2005 - 02/2006
SNC Lavalin,
Supervisor Com. Eng.
Algeria -Skikda
Combined Cycle
Power Plant
2 x GT x 250 MW/unit, - GE suppliers
2 x HRSG-Alstom supplier-boilers with two steam drums,for LP and HP system
2 x ST x 150 MW/unit-ABB Germany, suppliers
2 x Desalination plant
1 x Auxiliary boiler for heating the oil
Mechanical & Commissioning of HRSG, ST & GT, desalination plant and auxiliary boiler for heating the oil. Involved direct to air blowing all the pipes, flushing oil system of GT, flushing the HRSG, steam blowing to the ST
01/2005 - 04/2005
Snamprogge-tti
Comm. Eng.- Utilities on site
Libya - Mellitah
Gas Plant
Boilers-Machhi-Italy, supplier, steam @ 70 bars,450C, 150t/h,boilers by steam drum,
ST-Nuovo Pignione-suppliers-ST with back pressure, 25 MW,outlet pressure from ST, 25 bars
Commissioning on Utilities :steam boilers & steam turbine, test all equipments,FDF,IDF, BFW pumps, water system, fuel system
09/2004 – 12/2004
Toshiba
Technical Advisor
Romania –Paroseni-Plant
Themal power Plant-PCB- Coal and heavy fuel oil
2 units x 150 MW/unit
Boiler- TGM 84-Russian suppliers-with steam drum,steam @137bar,540C480t/h
ST-Russian supplier-ST in condensation, with steam extraction, H2 for cooling the generator
TFA-for steam turbine, check & review all the design & drawings of steam turbines, procedures and PID,translate from Russian into English
04/2003-
04/2004
Comm.
Supervisor Facilities
Kazakhstan
Aksay-Oil& Gas
4 x Steam Boilers, by oil gas,
Medium pressure-50 bars
Commissioning and operation on water and steam & facilities
02/2002 – 03/2003
Alstom France
Commissio-ning engineer
Malaysia - Sri Manjung
Themal power Plant-PCB
3 units x 700 MW / unit
Boiler-Alstom France-with steam drum,steam@192 bar, 540C,2400 t/h, 6 coal bowl mills/boiler,ESP for fly ash,Fuel: coal & heavy fuel
ST-ABB UK supplier- with condenser and steam extraction
Commissioning & Operation of pulverized coal boiler,steam blowing, adjust the control valves, adjusted HP&LP by pass station, chemical water parameters,
07/2001 - 12/2001
Ansaldo Energia
CCR operator
Lebanon - Zahrani
CCPP
2units x 150MW/unit
2 x GT-Siemens suppliers
2 x HRSG-Ansaldo suppliers-
1 x ST-Ansaldo suppliers
Operation of HRSG & GT & ST, fuel system, water treatment
03/2001 - 06/2001
Babcock &Willcox
Boiler Technical Advisor
Egypt –Alexandria-Sidi Krir
Thermal Power Plant
2 units x 350 MW/unit
Boiler-Babcock&Wilcox supplier- with steam drum, steam@137bars,540C,1100t/h,Fuel:gas and oil
ST-with condenser and steam extractions
Commissioning of boilers, adjusted the oil burners, combustion in furnace chamber, control valves
02/2001 -03/2001
ABB ALSTOM
Commissio-
ning engineer
KSA-Shoaiba
Thermal Power plant-Oil and gas fuel
3 units x 350 MW/unit
Boiler-ABB supplier-boiler with steam drum,steam @ 170b, 540C,1050t/h
ST-ABB-Alstom, ST with conndenser and steam eztraction
Mechanical & Commissioning on B.O.P, flushing the pipe, air compressors plant, fire fighting system, and fuel oil system
01/2001 -02/2001
ABB ALSTOM
Shift Charge Engineer
Marroco - Jorf Lasfar
Themal power Plant-PCB
2 units x 350 MW/unit and
Boilers-Alstom supplier-boiler with steam drum, steam@170 bars, 540C, 1050t/h, 6 bowl coal mills and heavy fuel
ST-Alstom supplier-ST with conndenser and steam extraction
Engineer for test and hand over of steam turbine & boiler by pulverised coal, trial test and hand over to client
08/1997 -06/2000
ABB ALSTOM
Commissio-ning Supervisor
- Mongolia – Ulaan Baatar
Themal power Plant-PCB-
3 ST x 25MW/unit and
4 boilers on common header to ST
Boiler&ST-Russian suppliers
Steam @ 80 bars, 530C, 120t/h, fly ash evacuation with Wet Scrubber system, Coal mills by balls,and Diesel fuel and intermediary coal fan to the burners
Construction, Mechanical, Commissioning & Operation of boiler by coal,check all construction work progress, review all the drawings, P&ID,PFD,
06/1995 -01/1997
ABB ALSTOM
Commissio-
ning Engineer
U.A.E. - Abu Dhabi-Taweelah Plant
Thermal Power Plant &Desalination
6 units x 125 MW/unit and desalination plant
Boiler- Babcock Germany supplier- with steam drum, steam@125bar,540C,400t/h, fuel;oil&gas
ST-ABB Germany supplier, ST with condenser, steam extraction,Electrical generator-cooling system by air
Commissioning & Operation of boiler and steam turbine-involved on chemical acid cleaning, steam blowing, punch list, test equipment,
09/1989 - 06/1995
RENEL
Shift & Technical Manager
Romania – Brasov city
Thermal Power Plant coal firing-PCB –and natural gas
2 units x 60 MW/unit
Boiler-PCB-UMGB Romania supplier,
With steam drum, steam @420t/h,137 bars, T-540C, 6 coal fan mills,40 t/h coal/mill,natural gas
ST-DSL-50,UMGB Romania, suppliers, ST with condenser, and 6 fixed steam extraction and one variable steam extraction for industrial steam
Commissioning, start up and Operation of Boilers&Turbines. All auxiliaries equipment as: fly ash& slag evacuation-wet system, coal system, air compressors,fire fighting,, H2 system, ESP, air preheater, Liungstrom type,
09/1979 - 06/1989
RENEL
Boiler Desk Operator
Romania-Braila city
Thermal Power Plant,
by heavy fuel and natural gas
3 units x 210 MW/unit and
Boiler-Russian supplier TKZ-boiler without steam drum, one through way,steam @ 137 bar, 540C,630t/h
ST-Russian supplier-ST with condenser and steam extraction
AND
1 unit x 310 MW/unit,
Boiler-Benson design, UMGB Romania supplier, one through way, positive pressure in furnace chamber, steam @ 192 bars,540C,1033t/h
ST-FIC330, Rateau-Schneider, with condenser and 7 steam extraction
Operation of boilers and steam turbines, prepared the oil guns-heavy fuel oil, checked the chemical parameters, verify all parameters, and keep in good conditions the unit to the normal parameters, air preheater, Liungstrom type,
Romania-Turceni city-1 year worked
Thermal Power Plant coal firing-PCB-
6 unit x 310 MW/unit,
Boiler-Benson design, UMGB Romania supplier, one through way, 6 coal hammermills/unit,, steam @ 192 bars,540C,1033t/h
ST-FIC330, Rateau-Schneider, with condenser and 7 steam extraction
Commissioning & start-up of boiler, with coal mills, involved direct to the chemical acid cleaning, steam blowing, and start-up, air preheater, Liungstrom type, and ESP, slag evacuation-wet system
-Others- special achievement-
-As a project manager, I had to participate to the bidding, prices of new equipment, and negotiations with vendors, verified the performance a new equipment and the price, verify the contracts between the client and EPC, and check all contractual conditions, penalties, etc
Driving license, category B-for both side (left and write)