Post Job Free

Resume

Sign in

Power Plant Follow Up

Location:
Dhaka, Bangladesh
Salary:
80000 dollar per year
Posted:
August 14, 2023

Contact this candidate

Resume:

Resume of Md. Harisuzzzaman

Contact Number 017******** & 017********

NDT Level-II (VT, MT,PT,UT and RT)

Career Summery &Objective

After passing B. Sc In Mechanical Engineering from kuet, I have worked in several organization and playing several rules since 2007. During my service period, I have worked project relevant work such as LPG carrier vessel, Fabrication and installation of the bullet tank

,Installation of the 15 ton capacity over crane, Fabrication of the 25 ton capacity overhead crane beam at Khulna shipyard ltd, Fabrication and erection of the fuel storage tank, Industrial machineries & equipment installation at various company, installation of the engine generator, pump & piping system, at factory & Shipbuilding section, Fabrication of the Fuel and fire reserve tank at power plant sector,, installation of the propulsion system, navigation system etc .Short blasting/Sand blasting and painting works at ship building & power plant sector, Fabrication of PEB building at the turbine building of Rooppur Nuclear power plant

(RNPP),Cement plant etc . Quality of Fabrication and welding under AWS,D1.1& Gost standard (Russian standard) .For servicing at quality sector, I have obtained ASNT level II ( VT, MT, PT, UT & RT). Estimation & costing, Project planning, project implementation, vedor collection and negotiation is another part of my working experience. Also noted that I have familiar of auto cad 2D,3D and Tekla software for the structural model, Aws D1.1, D1.5, API1107.At presently I am working as a AGM (Production & Plant In-Charge). Now, I am looking better organization where I can apply my previous experience and learn more to make myself for the better position on the new organization by working as a team member with maintaining honestly, integrity & hardworking .

Working Experience

Running Job:

Name of the Organization : Bangladesh Building System Ltd (BBS) Position : AGM ( In charge Production & Plant )

Special responsibility : RNPP Project (Rooppur Nuclear power plant Project, Turbine building, lot 600)Presently the overall production and any type of the factory issue have under my responsibility

Type of works : Fabrication and erection of the turbine building by pre-Fabricated steel Structure, weight-4000 Ton

Duration : 19 December -2020 to continue

Responsibilities

1. Consist the monthly production plan, consumption & productivity 2. Follow up the cost verse budget to control the project cost 3. Production planning & Project scheduling

4. Lead the QC team to ensure quality as per AWS standard and structural D1.1 5. Lead the administrative and financial activities at factory 6. Arranging WPS and WQT

7. Ensure product quality by VT,MT,PT, UT and RT method according to ASNT 8. Deal with ASE, BAEC (Bangladesh Atomic Energy commission) and Max regarding production, Quality and other issue for 1250 MW nuclear power plant, Pabna 9. Follow up the preventive and corrective maintenance on all machineries 10. Development of the production capacity by ensuring the proper utilization of the machine and manpower

11. Fire and safety issue

12. Client handling

13. All types of factory activities submit to MD Sir Previous Organization

Name of the Organization : Sabik Engineering & logistics Position : AGM

Duration : 1st February-18 to 18/12/2020

Responsibilities

1. Rolling as project Manager for the construction of the 5000 qm x 3 nos Fuel tank at dual fuel 250 MW power plant at Khulna power plant – Activities; Forming project schedule, Weld Map, WP (Work plan), Prepare WPS and WQT, IT (Inspection and testing plan), selecting the RT point. Follow up VT, UT, DPT and MPT. Hydro testing. Shot blasting and painting works Ensure SA2.5

2. Monitoring the ducting and insulation work at 350 MW power plant, Sylhet 3. Materials shooting and materials storage plan

4. Shot blasting & painting works at 4m dia pipe at 1200 MW power plant, S Alam power plant, Chittagong

5. Erection of steel structure at solar power plant, Manikgonj, Dhaka 6. Estimation & costing of various project such as tank fabrication, piping works, steel structure, equipment erection and installation, jetty, shipbuilding, LPG project etc 7. Project planning and project scheduling

8. Sourcing the man-power

9. Coordination between vendor & Classification society 10. Prepare WPS, WQT for the 5000 qm fuel tank fabrication works at 200-300 MW dual fuel fired power generation, Khulna under CCDC

11. Prepare weld map

14. Ensure works quality as per requirement classification society 15. Ensure testing works as per required of the classification society 16. Monitoring of the sand filling, Sand blasting & painting works 17. Negotiation with vendor by following project budget 18. Conditional survey of oil reserve tank, recto fitting works, Oil tanker, cargo vessel, Suction dredger, container vessel etc.

19. Follow up of the operational activities of suction dredger, excavator, roller, pay loader, Forklift etc

20. To be ensured logistics support according to project schedule 21. To be prepared fabrication & working drawing by auto cad 2D & 3D 22. Follow up the project administration & financial matter 2. Name of the Organization : Radiant Ship Yard Ltd. Position : Project Manager (LPG, Project Bashundhara, BM Energy Petro max & outside project)

Duration : 9th April 2017 to January-2018

Responsibilities

1. Co-operation between, contractor, designer & Classification society 2. Estimation & costing of various project such as steel structure,piping & ship construction 3. Follow up the project schedule

4. Draw the production drawing by auto cad 2D & 3D 5. Meeting with project owners/ owners’ team

6. Form WPS according to materials grade and rules of classification society 7. Installation of the bullet tank

8. Follow up the project administrative activities 9. Follow up the fabrication works of pre-fabricated steel building project 10. Follow up the slipway construction works

11. Rectification plan according to classification rules 12. Estimation and costing of civil works according to company necessity 3. Organization Name : T.K.Ship Yard Ltd.

Position : Manager (Production)

Duration : 5th April -2013 to 9th April 2017

Responsibilities : Over All In-Charge at production and Maintenance section 4. Organization Name : Seven circle (BD) Ltd.

Position : Engineer (Ship Construction)

Duration : 1st November-2010 to 5th April 2013

Project Name : Shun shing ship yard Ltd

5. Organization Name : Bangladesh Development and Design Engineers Position : Sr. Engineer (Project & Operations)

Duration : 1st July 07 to October -2010

Responsibilities at seven circle (BD) ltd

At new ship construction sector

A. Estimation and costing for construction of the new ship B. Consisting and following the project schedule

C. Production drawing for the casting of the bush materials at propulsion and rudder shafting system

D. Supervision of the new ship construction at own ship yards and other ship yards. E. Supervision and instruction to the contractor according to ship requirement F. Set up one workshop as per ship building standard G. Discussed with Design house for any fabrication drawing or modification works H. Paper works forming and submitted to COO Sir

Maintenance section

A. Ensure preventive & corrective maintenance schedule according to work priority B. Supervising of the slip way construction works

C. Estimation, modification drawing of the docking element such as trolley, reverse forcing system, pulling materials etc

D. Prepared docking plan

E. Execution of the docking works

F. Installation& fabrication of the fly ash unloading piping system at ball mills G. Installation of the fly ash unloader system

Name of the completion project

1. Installation HCL plant of the ASM chemical industries limited 2. Installation including piping works at 1MW Generator 3. Tank fabrication of the “Samuda Chemical complex ltd”Rupsha Oil refinery Ltd 4. Installation of the Floating loader and un-loader system at Holcim (BD) ltd 5. Fabrication and installation of the Aspiration ducting, heavy ducting, product hopper for plush processing plant at “Sobnom vegetable oil Mills Ltd” 6. Installation of the chiller at X ceramics index group, Gazipur 7. Installation of 1MW generator including piping system 8. Repair and extension of the piping system at “Samuda chemical complex ltd”, Meghnaghat, Gozaria, Munshigonj

9. Fabrication of the Curved beam for Meghna 2nd Bridge project and Ghomoti Bridge . 10. Supervision of the internal road at Shun Shing Shipyard Ltd. Kaligonj, gazipur 11. Supervision of the sand blasting and painting works 12. Installation & Fabrication of the steam line, Condensate line, portable water line, over head tank Installation & Compressed air line with loop system and fire fitting system of the General Pharmaceutical ltd

13. Tank fabrication at Asugonj power plant

14. Installation of the overhead crane at GPH,Chittagong 15. Fabrication of the 20 Ton capacity overhead crane at Khulna shipyard ltd 16. Construction of the 1300 M3 x 06 nos LPG bullet under RINA class. Ruppur, daudpur 17. Piping works on the LPG project

18. Build car shed at General pharmaceutical

19. Installation of the pump in house at paramount textile 20. Firefighting line at seven circle (BD) ltd

21. Firefighting line at Rupsha Oil refinery ltd

22. Fly ash unloading system

23. Installation of the grantee crane at Samuda chemical complex ltd, Seven circle (bd) ltd and BIWTA project

24. . Retrofitting works on prefabricated steel building at paramount textile Mills ltd . Major responsibilities during my previous service period 1. To manage, Control and Supervise the Project works 2. Willingness to work independently with self –direction & under pressure 3. Make contact and meeting with clients

4. Cost and time analysis for projects

5. Supervision of running projects

6. Design analysis

7. Preparation the requisition book as per drawing Educational qualification

Name of the

Examination

Major subject Board/Institute Passing

year

Result

S.S.C Science Jessore 2000 *1st division (75%)

H.S.C Science Jessore 2002 2nd division (59.3%)

B.Sc

Engineer

Mechanical Khulna University of

engineering &Technology

2007 CGPA 2.56

Project & thesis

Graduation thesis on “Design and Construction of an Air Foot Pump” Supervisor:

Dr. T.P. Bhowmick

Professor

Department of Mechanical Engineering

Khulna University of Engineering and Technology (KUET) Computer skill

Application Package : MS Word, MS Excel.

Programming Language : C++

Engineering Analytical Tools : Auto CAD, 2D &3D. Tekla for the structural modeling Professional training: ASNT Level-II (VT, UT, MT, PT and RT), Fire, Lifting signal, Fire and safety and under process of AWS CWI

Language performance

Good communication skill over Bengali and English. Personal information

Father’s Name : Late Md. Abdul Hannan Biswas

Mother’s Name : Mrs.Sufia Begum

Date of Birth : 24 September.1985

Nationality : Bangladeshi

Marital Status : Married

Religion : Islam

Permanent Address : Vill &Post: Hatboalia. Thana: Alamdanga, Dist: Chuadanga, Bangladesh

REFERENCE

1. Dr.Mohammad Mashud

Professor

Department of Mechanical Engineering.

Khulna University of Engineering &Technology (KUET) Phone: 88-041-769471Ext405 (office)

Cell: +880**********

2. Engr.A.A.R.Shahriar

Operation Director (Radiant Shipyard Ltd)

Cell No: 017********

Md. Harisuzzaman



Contact this candidate