EDUCATION
Years B.Sc. of Electronic Engineering
City-Country Mansoura University
Software: Word, Excel, All control languages
LANGUAGES
English: Very Good
Arabic: Native tongue
WORK EXPERIENCE
From 01/07/2015 to now New Damietta - Egypt
NAME OF THE COMPANY, EDEPC (East Delta Electricity Production Company) West Damietta Combined Cycle Power Station (II) 1*250M.W. steam turbine GE (D202) markVIe controlling, fast-track project.
Job occupied Consultant Engineer – I&C Maintenance Team Leader Missions or tasks realized :
Representative the owner (EDEPC) East Delta Electricity Production Company to follow up all construction activities, inspection, issue punch item,clear punch item, cold loop check, hot loop check, function test, all ST’s start-up testing, calibration of all field instruments, review all the documents,drawings & packages, carry out physical walk downs to make sure that the systems ready to be commissioned according to contract requirements, control specifications and approved drawings this is beside all warranty work after installation and I have attended TOAC meeting in between main contractor (Orascom Construction, General Electric) and the owner From 01/01/2015 to 01/07/2015 New Damietta - Egypt NAME OF THE COMPANY, EDEPC (East Delta Electricity Production Company) West Damietta Simple Cycle Power Station (II) 4*125M.W. gas turbine GE (PG9171) markVIe controlling, fast-track project
Job occupied Consultant Engineer – I&C Maintenance Team Leader Missions or tasks realized :
Representative the owner (EDEPC) East Delta Electricity Production Company to follow up all construction activities, inspection, issue punch item,clear punch item, cold loop check, hot loop check, function test, all GT’s start-up testing, calibration of all field instruments, review all the documents,drawings & packages, carry out physical walk downs to make sure that the systems ready to be commissioned according to contract requirements, control specifications and approved drawings this is beside all warranty work after installation and I have attended TOAC meeting in between main contractor (Orascom Construction, General Electric) and the owner. Ayman Maher Abdelshakour
Egypt
New Damietta
Phone:002***********
E-mail adyvia@r.postjobfree.com
From 01/10/2009 to 01/01/2015 New Damietta - Egypt NAME OF THE COMPANY, Egypt- West Damietta Simple Cycle Power Station (I) in 4*125M.W. gas turbine units GE (PG9171E) (MARK VIE). Job occupied Instrument and Control systems Maintenance engineer Missions or tasks realized :
Representative the owner (EDEPC) to follow up all construction activities, inspection, issue punch item,clear punch item, cold loop check, hot loop check, function test, all GT’s start-up testing, calibration of all field instruments, review all the documents,drawings & packages, carry out physical walk downs to make sure that the systems ready to be commissioned according to contract requirements, control specifications and approved drawings this is beside all warranty work after installation and I have attended TOAC meeting in between main contractor (KN) and the owner
Responsible for DLN Retrofit in 4 gas turbines frame 9E including. Responsible for Water Treatment Instruments and Control System
(PLC ),(Calibration – installation) For Various Instruments. From 01/08/2008 to 01/012009 New Damietta - Egypt
NAME OF THE COMPANY, Egypt- West Damietta Simple Cycle Power Station
(I) in 4*125M.W. gas turbine units GE (PG9171E) (MARK VIE). Job occupied Operation Management Engineer
Missions or tasks realized :
Establishing operation engineering team
Organizing and distributing operating shifts
Orientation sessions for new engineers
Preparing Training courses for new engineers
Supervising operating team
From 01/08/2005 to 01/08/2008 New Damietta - Egypt NAME OF THE COMPANY, Egypt-Damietta Combined Cycle Power Station1375 M.W. 8*125M.W. gas turbine units SIEMENS SGT5- 2000E (V94.2). 3*145 MW steam turbine units ALSTOM
Job occupied Shift Operation Engineer
Missions or tasks realized :
- Operation and monitoring performance of SIEMENS SGT5-2000E (V94.2) single shaft single casing – twin vertical combustion chambers- 135MW base load unit gas turbine.
-DCS Operating Boilers HRSG (Heat Recovery Steam Generation) and its auxiliary such as HP &LP pumps, drums, super heater, filling, safety valves, pumps, instrument sets pressure gauges (PG) & transmitters (PT) and working in the emergency trip of HRSG (ET).
-Operating & controlling equipment through D.C.S (Westinghouse)
-Operating & controlling equipment through ovation system control:
(EMERSON process Management Company)
-Operating & monitoring 145 M.W. Steam turbine (ALSTOM) ACTIVITIES AND INTERESTS
Volunteering work, Sports, Environmental steward
Availability
I appreciate very much your time reading my C.V and I hope that you will find it suitable and acceptable for the position. I am ready to start work, Full Time. I wish to be an active member in your company adding my experience for the development and progress of it.
Sincerely,
Eng./Ayman Abdelshakour