Post Job Free

Resume

Sign in

Working as a Am in power plant operation and technical services

Location:
Sambalpur, Odisha, India
Salary:
80k
Posted:
August 11, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

ARVINDKUMAR MODI Address: -

Hindalco industries ltd,

E-mail: -adyu5v@r.postjobfree.com

Hirakud, sambhalpur

Contact no- (089********,957-***-****) Orissa.

·

OBJECTIVE: -

OBJECTIVE:-

“To seek a position where my skills and experience can be fully utilized.

While gaining new experience and knowledge.”

DETAILS OF PROFESSIONAL EXPERIENCE:

(15years’ experience in thermal power plant OPERATION, COMMISSIONING, AND TECHNICAL SERVICES AND PERFORMANCE MONITORING OF PLANT

DETAILS OF PROFESSIOENAL EXPERIENCE:

HINDALCO INDUSTRIES LIMIED (HIRAKUD ORISSA) (467.5MW)100x4) 67.5x1 (16 June 2020 to continue) (3 years)

·Having CFBC boiler of ThyssenKrupp cold cyclone, water tube, natural circulation and steam generation capacity is 395 tph (Common header of all 13.nos.boiler), with88kg/cm2, 510 deg temp.

·Having turbine of Siemen’s make (ST5 V63-C550 model) 100 mw, condensing with four uncontrolled extractions

·Working as an Assistant manager in Operation and Technical cell planning and performance monitoring department.

Job Responsibilities: --

1) Boiler light-up and Turbine rolling like cold & hot start-up.

2) Familiar for the operation of high-pressure condensing turbine.

Latest Woodward 505e electronic governor, turbine rolling,

Synchronizing With grid and turbine loading

3) Familiar in the operation of boiler steam battery line up.&commissioning activities of

Boiler like hydro test, refractory dry out,airlekage and tightness test,alkaliflushing,steam blowing as per circuit .

4) Daily preparing MIS report (performance report,KPI,Deviation report and Monthy performance Report of plant and send to all departments and head office.

5) Analysis the performance of equipment’s and PLF improvement in plant (reduce PHR,APC by finding out the root cause, attending leakage, coal consumption analysis of power consumption through EMS reports,SEC reports.

6) prepation of maintenance round in CBM and technical cell activities.

vCBM of rotary equipment like pump, fan, compressor (CAC, SCREW & RECIPROCATING) & Steam Turbine. (spm and vibration instrument A-30, Leonova infinity, and Leonovo diamond model)

vBreak-down analysis of rotary equipment with the help of spm and vibration reading history.

vPerformance improvement in auxiliary power consumption of equipment’s (ID, PA, SA) by Flue-gas analysis of boiler like-O2, CO, CO2 etc.& calculation air ingress quantity from atmosphere to our close system. (optima 7,flue gas analyzer instrument)

vEnsured Inspection of Boilers Pressure Parts during Planned & Forced Shutdown of Boilers with

Proper Safety.

v. Ensured 100% Availability of all Tube Thickness Measuring Instruments during StatutoryOverhauling s of Boilers. (Ultrasound thickness meter of mega sonic andOlympus make)

v Maintained history of Tube Thickness Inspection Reports, Rectifications done against tube thickness inspections & boilers outage reports on account of tube leakages to define wear & tear pattern.

v Ensured NIL Breakdown / failures in measured tubes during statutory overhauling of boilers.

vIndependently operate the Ultrasonic flow measurement, thermography of boiler insulation and sound intensity of the peripheral area of noise producing machines.

(Ue ultrasound meter, testo thermography meter)

vExecuted the Monthly PG Tests of Boilers, TGs, Condensers, Cooling Towers Air Flow Measurements, Flow Measurements of Pumps, Thermography of Boilers, TG, MS Lines, Leakages in Compressed Air Networks, Steam, Water Networks, CHP Energy Audits etc. Mapping Boiler Wise, Fan Wise, Equipment Wise Specific Energy Cons details, Voltage Profile, and SP Energy Cons thereby identifying the areas for improvement.as per ACME PTC codes and procedures.

vCondition monitoring of rotating equipment’s and smooth and trouble free -free operation of production line by identification of hidden defect and estimate the fault severity and maintenance planning.

1.HINDALCO INDUSTRIES LTD(900MW, 150X6) SUB-CRITICAL POWER

PROJECT (MAHAN, SINGRAULI, and M.P) from 24/08/2011 to 16th june2020) (8 yrs.)

·Having Boiler of BHEL, PF fired,510 TPH, 140 kg/cm2,540 deg cent

Sub-critical with reheater, Tangential firing, water wall Tube, natural circulation.

·Having Turbine of – BHEL make,150MW Condensing with extraction.

·Working as an Assistant. Manager (COMMISSIONING AND OPERATION)

·JOB RESPONSIBILITIES

1)Preparation and ensure the safety measures during operation activities.

2)Preparation and Co-ordination for Hydro test, Light-up, Steam blowing activities.

3)Assisting in Various operation andcommissioning activities such as Interlock Test, Motor Solo Test, and Air balance Test, and Initial oil firing.,alkali flushing, acid pickling of drives oil flow ckt, and coal airflow test .

4)Making a Daily operation report and work progress report.

5)Reviewing operation Procedures of Plant Subsystems and Plant Start-Up and

Shut- Down as per SQC, FSSS Logics

6)Familiar to operate boiler through DCS (MAX DNA and Siemens) in grid failure condition, load reduction, andhp/lp bypass operation.

7)Coordinating with process Design team for better process control.

8)Coordinate and routine checkup of DM plant water chemistry

9)Familiar to handle the vendors, AMC contract, preparing of MIS report, material handling with logistic regarding coal stock, coal blending, and chp activities.

10)Good command over operation and maintenance of CHP, and wagon tipplers also.

2. DOOSAN POWER SYSTEM LTD.(4000 MW, 800X5) ULTRA MEGA POWER

PROJECT (CGPL MUNDRA GUJARAT) from 05/02/2009 to 28/04/2011 (2 years)

·Having Boiler of DOOSAN, PF fired,2465 TPH, 256 kg/cm2,569 deg cent

Super critical, Tangential firing, water wallSPIRAL& vertical Tube, Once through circulation.

(WET AND DRY MODE OPERATION)

·Having Turbine of – TOSHIBA make, 800MW Condensing with extraction.

·Worked as an SR. Engineer (COMMISSIONING and OPERATION.)

JOB RESPONSIBILITIES : ---

1. Initial operation of boiler equipment’s (fans, motors pumps)

From fieldand through DCS of FOX PRO.

2. Operation of boiler during steam blowing. And HP/LP bypass.

3. Assisting in various commissioning activities such as hydraulic

Test, chemical cleaning, interlock test, motor solo test, air

Balance test and initial oil firing, steam blowing and coal firing.

4. Commissioning and Operation of fuel oil pump house (LDO&HFO) and its routine

And preventive maintenance.

5. Commissioning and Operation of Boiler recirculation pump. (WET MODE).

6. Commissioning and operation of Regenerative Air preheater and bowl mill (XRP -

1163).

7. Making daily commissioning report and work progress report.

8. Making test reports and analyzing test data.

3. HEG LTD (LNJ BHILWARA GROUP) (from 6 JAN 2007 to 30 JAN 2009) (2 yrs.)

·Having Boiler ofThyssenKrupp CFBC, 2x140 TPH, 66 ATA, 485 +-5 temp, cold cyclone, water wall tube, and natural circulation.

·Having Turbine of – BHEL MAKE 33x1 MW and 31x1MW, condensing. with Extraction

·WORKED AS AN ASST.ENGINEER (DCSOPERATION BOILER AND TURBINE), ABB AND YOKOGAWA.

JOBS RESPONSIBILITY :

1) Worked as aDCSoperation engineer to operate, yokogawa CS.

3000. System.

2) Boiler light-up and Turbine rolling like cold & hot start-up.

3)Familiar for the operation ofhigh-pressure condensing turbine.

LatestWoodward 505e electronic governor, turbine rolling,

SynchronizingWith grid and turbine loading

4)Familiar in the operation of boiler steam battery line up.

5) OPERATE Latest ASH conveying system ESP of fields.

System.

6) Operation of Cooling Water System and Cooling Tower Fans.

7)To calculate boiler and turbine efficiency.

8)Regularly check DM water quality and Consumption.

9)To issue any work permit for attending maintenance activity.

EDUCATION QUALIFICATION: -

ØDone BOE certification form Bokaroboard in 2016.

ØDone NPTI one year pdc from new Delhi badarpur with 68% in 2006-07

Ø4-year Regular Bachelor of Engineering in Mechanical (BITS) sindri, vinoba Bhave University with first div 67.4 % in2001- 2005.

Ø10+2 (pcm) from Govt. Boys Sr. Sec. School, Haryana in 1998-99 with first div 72%.

Ø10 Th (CBSE) from Kendra Vidyalay no.1 Punjab adampur in 1996-97.

COMPUTER SKILLS

·Internet working knowledge, PREPAIRING MIS REPORT, PR, PO, Billing of vendors, handle CAMC contract, vendor selection AND WORK PERMIT REPORT.

·Basic knowledge of oracle ERP and power point presentation for MPR and CAPEX related project work (estimate time, estimate cost, quotation selection, safety measures discuss with head, finance for creating cost code and capex no.)

PERSONAL PROFILE:

1) Father name : Shri Jai Prakash Modi.

2) Date of birth :23 dec 1980.

3) Sex :male (married)

4) Nationality : Indian.

5) Expectation :Negotiable.

6) NOTICE PERIOD:3MONTHS (adjustable as per cond.)

Hello-contact : 898-***-****)

I hear by declare that the information furnished above is true to the best of my knowledge.

Date & place: - (ARVINDKUMAR MODI)

.



Contact this candidate