Zameer Jafri ** – Plewes Road, Toronto, On M*K *K* Cell: 416-***-****
https://www.linkedin.com/in/zameer-jafri-1822909/ adyu5b@r.postjobfree.com
https://images.credly.com/size/110x110/images/260e36dc-d100-45c3-852f-9d8063fa71e6/pmp-600px.png
Over 20-year experience in the areas of Project Control / Contract Management / Project Management / Planning / Scheduling / Cost Control / Integration of earned value and risk management using contingency reserves
PROFESSIONAL PROFILE
M.Sc.
PMP (Project Management Professional Certification)
PC PRO (Project Control Professional) Certificate
Certificate in Primavera P 3e V5.0 and hands-on experience in Primavera P3, P3e V 5.0, 6.1, P6, 8.3.2, 20.12, 20.12.7, MS Project, Excel and Visio
Certificate in Project Controls Planning and Scheduling Level 1, 11, III & IV Training
Certificate in PMP preparation course
Certificate in Eco-Sys – Cost Management System
Experimental thesis on “Trace Determination of Gold by Ultraviolet Spectroscopy”
Developed methods on “Heavy Metals Determination at Trace Level” by ICP (Inductive Coupled Plasma Spectroscopy)
Experimental paper on “Degradation products of Acetaminophen”
Presented paper to AACE “The situation, complications, and solutions in integrating schedules on mega projects
Post Graduate Certificate in “High Pressure Liquid Chromatography”
Certificate in “Designing and Troubleshooting in Electronic Circuits”
Three days training course for Project Control Professional
Certificate of merit from “OPG Chief Nuclear Officer”
SCR (Nuclear Station Condition Report) Coordinator
Share Point Administrator
ISO 9002 and Safety Award Winner
Qualified in “Radiation Protection” (Orange Badge Expired)
Security cleared from CSIS for OPG and Bruce Power
Member OPG ROE team (Off Site Emergency Response)
Member Project Management Institute, PMI – Member ID # 1684858
Member of Lakeshore PMI Chapter
Expertise in Preparing of project documents such as charters, BCSs (Business Case Summary), PEPs (project Execution Plan), PCRAF’s and PMP (project Management Plan)
Expertise in Gated Process and Eco-Sys Cost Management
Skilled in Project planning, scheduling, controlling, monitoring, designing and workflow
Excellent knowledge and experience to identify, assess, monitor, and limit risks at program level
Political acumen and understanding of stakeholders relations and building partnerships.
Work History
16-Mar-2023 – 30-June-2023 Senior Project Control Engineer/Officer Ontario Power Generation
Darlington Energy Complex – Corporate Projects
Planned, scheduled, and monitored IT projects as per Agile Model, such as success Factors Employee Central (Capital & OM&A), Online Wiring...etc.
Created and processed material request in Asset Suite AS9 for new PO or increasing PO value
Set up Purchase Orders for new vendors such as
Processed Action Request in AS9 to get approval on PO increments from higher line management
Produced project forecast in forecast tracking tool, reviewed with project team and forecasted in Eco-sys
Processed Earned Value in Eco-Sys
Produced Eco-Sys reports such as Current Forecast Yearly Cash Flow, Project Forecast Summary by Bundle…etc.
Compiled Risk and concern list in EBX with project team input and also Supported BCS activities in EBX
Performed change control activities such as CCF implementation
Review Milestone dates in EBX with PM and re-aligned forecast
17 Feb 2022 – 17-Feb-2023 Senior Engineer/officer Ontario Power Generation
Darlington Refurbishment Unit 1,3 and 4, Project Control Department
Manage EPC projects for Unit 1, 3 and 4 for Darlington Refurbishment such as LRV replacement, 82891 - DN Post-Accident Water Cooling System Heat Exchanger Replacement
Update integrated schedule in P6 with the help of vendor’s updates from children schedules for Unit 1,3 and 4, and collaborating with different planning and executing groups.
Oversight an integrated master schedule and network multilayered schedule at program level
Logically tie IMF activities from other projects in master schedule
Administered OPG change control processes; completed forms such as CCF (Change control Form), PCA and CTPS etc. and processed for approval
Experienced in managing Project Budget, Cost Control, Cash Flow, Forecasting, Change Control through EcoSys, Proliance and Oncore applications
Ensured appropriate monthly accruals and weekly reversals are prepared and processed for all significant costs incurred against department activities
Presenting, conducting, and chairing meetings on project health.
Oversight Vendor schedules and raise all discrepancies.
Reviewed standard nuclear cost reports on a weekly and monthly basis
Power Knowledge of financial fundamentals and principles as well as data management and financial systems and processes to understand and provide analysis of performance trends
Identified cost performance variances regarding actual versus planned resu
Provided support to business planning and budgeting and upload control budget changes as required
Provided oversight of construction contractors integrated, logically tied, resource loaded project schedules which incorporated identified scope, risks, estimates/budgets and constraints that support effective project management and field execution.
Produce milestones variance report, monitor MS in EBX (Enterprise Business Management System) and feed back to vendor for any necessary schedule recovery
Participate in execution window adjustment meetings and process vendor PCNs to fit schedule within windows
Monitor Data Date moving metrics and do quality checks
Analyze critical path and keep PM and all the stake holders aware of the schedule and cost risk
Oversight vendors for planning, executing and monitoring LRV project
Produce monthly forecast in Eco-Sys and produce required reports
Process all the change control requests through EBX
Manage execution windows with changing scenarios
Monitor SPI and CPI for vendor and OPG schedules in EPMX (SAP Application)
Forecasted monthly and yearly budget in EcoSys
Monitor project health in BI reports
Ensured to document all productivity obligations that the sub-contractor must meet and reflect this into the schedule
Integration of the estimates, earned value and risk management using contingency reserves
Supervised Monte Carlo risk analysis process and contributed to Risk Mitigation Plan.
Oversaw vendor project change implementation process and approved changes in EBX System.
Prepared Level 1 to Level 3 EPC schedules in an enterprise project management environment with particular emphasis on critical path leading from engineering to procurement to construction
28 June 2017 – 17 Dec 2021 Senior Project Control Specialist - Burns & McDonnell
Hydro One Construction, Power Transmission and Distribution Project
Performed schedule analysis on complex Station Component Replacement and Lines Projects for hydro One such as; Pine Portage SS: Component Replacement, Minden TS (T1, T2, PCT), East West Tie Connection, AR 22973 Stewartville TS - ISCR – Demerger, Hawthorne TS T5 T6 Auto replacement, Hawthorne TS ISCR: Replace 2 Existing Transformers, Riverdale JCT x Overbrook TS: Building New A6R Tap, Alexander SS Component Replacement, Ear Falls EOL T5 Replacement, Q3M6 Frontenac TS-Novalis CTS Tx Line Refurb
Lead project control and scheduling activities for the Hydro One “East - West Tie project” (the biggest project in terms of budget and scope for the year 2017 - 2020).
Collaborated with Indigenous peoples
Experience with environmental consulting
Actively involved with terrestrial ecology and environmental planning
Dealt with renewable energy, transmission lines, Hydro Generation Stations
Performed Project Control Specialist role, developed projects schedule in Oracle Primavera P6 20.12.7
Performed schedule analysis on complex Station Component Replacement Projects such as Pine Portage SS, Minden TS (T1, T2, PCT) etc.
Produced overall schedule, Critical path, Variance, Performance Level and look ahead reports
Implemented the project controls processes with the internal project management team to execute project deliverables within budget.
Analyzed project controls reports, present findings and provided recommendations to the project controls team.
Ensured project set-up in Oracle Financial MIS / PPS Accounting Module or Oracle Primavera Contracts Management Program.
Reviewed the upstream (prime contract) / downstream (PO & subcontract) change orders.
Set up Work Breakdown Structure (WBS) in Oracle Primavera 6 or Microsoft Project scheduling software and developed Level IV schedules
Ensured logic ties assignments within the schedules with OPG milestones in asset demerger projects
Managed integrated data from one program to another.
Liaised with the projects stake holders such as Toronto Hydro, OPG, SNC Lavalin, Tetra-tech and vendor’s engineers, managers, directors, technical leads, trades and project teams within the frameworks of globally recognized Guidelines.
Provided Project Controls Manager with expert judgment on improving Progress Collection processes and quality of data.
Incorporated the approved Change Orders (ECN, VCN, IROV) into the Schedule.
Provided Tailored P6 Reports as requested by the Team.
Skilled to maximize the realization of risks and turning them into the opportunities
Ability to analyze and assure uncertainty does not deflect the endeavor from the business goals.
Planned Risk Management activities and defined how to Monitor and Control Risk
Skilled to maximize the realization of risks and turning them into the opportunities
Ability to analyze and assure uncertainty does not deflect the endeavor from the business goals.
Planned Risk Management activities and defined how to Monitor and Control Risk
Jul 2013 – 28 April 2017 SENIOR COST AND SCHEDULE ANALYST – CSA
Ontario Power Generation Darlington Nuclear Project and Modifications
Project Control Department
Excellent knowledge and working experience in OPG primary information technologies such as Passport, NFRA, Oncore, Eco-Sys, SCR (Station Condition Report), Gated Process, SAP, Asset Suite and ROM (Risk Oversight Management)
Some of the major projects managed during this assignment are Installation of Chemical Analyzers, Feeder Scanners, Stacking Frames, D2O make up, MOT/UST/SST installation of Multi Gas Analyzers, TRF (Tritium Recovery Facility) Toss/Turbine Replacement, Group II Pressure Transmitter Replacement…etc.
Set up Work Breakdown Structure (WBS) in Oracle Primavera P6 8.3.2
Developed resource loaded and logically tied Level 1, 2 & 3 schedules in Primavera P6 8.3.2
Made quality checks, validated, approved and oversighted vendor schedules
Developed Cash Flow Reports from P6 Schedule to provide input into Business Case Summary (BCS), Project Change Request Authorization FORM (PCRAF) and Baseline Change Control FORM
Prepared, supported, reviewed upstream contracts (purchase orders) for primary contractors and downstream purchase orders (PO) and change orders
Project Change Control Authorization (PCRAF-Project Change request Authorization Form), Business Case Summary (BCS), Base Line Change Control preparation, approval, processing and implementation in Primavera P6 8.3.2
Performed, Reviewed SWOT Analysis to reveal strengths, weaknesses, opportunities, and threats (SWOT) from both the investors and the contractor’s point of view in the planning, contracting, and construction phases of projects.
Created various schedule scenarios and Cash flow reports
Consulted section managers, project managers, Engineers and trades for accurate updates
Produced cost reports from FRA and provided forecast input in EcoSys
Produced, validated and reported earned value, SPI and CPI
Integrated and validated data from one program to others such as P6, PPM, FRA, Proliance, Oncore and EcoSys
Monitored multiple projects from initiation to delivery that entailed regular stakeholder’s communication and coordination between senior management and project team members
Dec 05, 2012-May 30, 2013 LEAD COST AND SCHEDULE ANALYST – CSA
Ontario Power Generation Darlington Refurbishment
Lead the provision of project controls, including for scope, schedule, cost, and progress for owned projects
Coordinate a group of project controls resources assigned to the projects
Oversee the set-up and integration of project baseline in regards to scope, schedule, cost, and progress
Set up control budgets from project cost estimates and forecast on monthly basis
Support the bid evaluation and award cycle of contracts
Oversee and maintain integrated cost and schedule forecasts and impacts, and manage contingency drawdown
Prepare project controls stage gate deliverables and support project execution team on the development of integrated stage gate deliverables
Reviewed Project Charter, Business Case and Project Management Plan Documents for different stage gate processes
Supported complex projects from Initiating stage through planning, executing, controlling and monitoring and closing through Primavera and financial systems
Developed a crisp work breakdown structure (WBS) to help identify the major deliverables
Managed EPC program interfaced with RFR, BOP, SG, SLS and Islanding projects and program Milestones
Developed WBS for Shutdown/Layup and Services projects aligned with financial system & WBS
Successfully implemented MDR (Modification Design Requirements Program) with vendors such as AMEC NSS and Worley Parson in Primavera
Updated and maintained DSR (Design Scope Requirements) data base for SLS Project
Monitored and controlled MDR work with vendors and interfaced projects
Issued SPI, CPI and Earned Value Analysis Reports for multiple projects
Performed ‘Critical Path’ analysis on multiple projects and presented to project team
Liaised with projects stake holders such as OPG and vendor’s engineers, managers, directors, technical leads, trades and project teams
Integrated EPC vendor schedules with overall program integrated Master Schedule
Resolved discrepancies with vendors such as schedule deliverables, SPI, CPI, invoices, coding and quality of Deliverables and progress
Imported vendor schedules, assessed progress and published variance and performance reports based on vendor’s corrected schedule
Attended all Vendor’s Meetings such as AMEC NSS, Kinectrics, Worley Parsons
Chaired internal project review meetings, vendors update meetings, weekly PRAD meetings
Issued OPG and vendor action tracking reports
The critical path of the schedule was not forced but rather derived based on, Sound logic inputs from those performing the work, realistic durations estimations, resource loading and levelling, appropriate use of calendars, proper use of date constraint, cross-project dependencies, Inclusion of process related activities by owners and other stakeholders
Used recovery tactics such as increased resources, working extra days or modifying
Negative float, Gaps addressed using recovery tactics such as increasing resources, working extra days or modify the logic
Dec 01, 2010-Nov 30, 2012 LEAD COST AND SCHEDULE ANALYST – CSA
Probabilistic Risk Assessment, Fukushima Daichi Event Response, SAMG- - $52 million
Ontario Power Generation Probabilistic Risk Assessment, Pickering & Darlington for CNSC License Qualification
Planned, Executed, Monitored and Controlled Probabilistic Risk Assessment Project, Fukushima Daichi Event Response, SAMG - $72 million
Presented a paper on “Reactor Chemistry Control”
Review and performed “Gap Analysis” for OPG governance
Lead Audit Team to find gaps and suggest solutions in RFP, RFI and Project Control Methodologies.
Followed up with vendors on schedule delays and threats, schedule recovery plans, mitigating actions, impact on Deliverables
Prepared work scope and sequenced work activities for fire, Seismic and flood risk assessment models for CNSC (Canadian Nuclear Safety Commission) to renew operating license for Darlington Power plant.
Raised and CAPPED SCRs on missed Director’s Milestones against every NCR raised by vendor
Performed “Resource Management Activities” such as preparation and processing of RFPs, RFIs packages, and CCRs to get approved by OPG OAR on N-FORM
Arranged and attended Bid Evaluation, Vendor Selection and Proponent meetings and coordinated with finance and Supply Chain to issue a purchase order (PO)
Interfaced with Finance and supply chain for required approvals on N-FORMS and Sole Source Justification Form
Initiated POs (Purchase orders) and worked closely with finance and supply chain to actively track until issued to vendors
Interacted with CNSC Staff on behalf of nuclear power plant licensee applicant (OPG).
Experience in preparation of licensing submittals to the CNSC, and facilitation of CNSC reviews and approvals in support of nuclear power plant and other nuclear facility license applications.
Experienced in preparing responses to Requests for Information (RFIs), and CNSC license application decisions and approvals.
Skilled in Providing day-to-day financial support to assigned department groupings to ensure financial ledger and operational reports are accurate and up to date
After approval of CCA, followed up with Supply Chain/Buyer to implement change, revise PO, etc.
Supervised Cost and Schedule activities of other CSAs and provided feedback to Project Manager
Performed all “SCR Co coordinator”, activities such as, raise, perform SCR disposition and Cap
Provided Vendors’ compliance report and Coordinated ‘Lesson Learned Meetings”
Maintained and updated Terms of Reference Document (T.O.R.)
Prepared Requests for Proposals (RFP) and RFQs (Request for quotation) working closely with Supply Chain Buyers
Developed SSJ (Single Sole Source Justification) to secure unique rarely available resources
Well familiar with Nuclear Protection against internal and external hazards
Reactor fuel design and core management requirements
Conducted meetings with all the proponents for the clarifications of the questions on RFP
Lead meetings for the evaluation of Requests for Proposals and coordinated bid analysis
Lead scoring meeting against each proposal
Compiled bid analysis reports and coordinated to award contract to the winner proponent
Negotiated terms, conditions, and final pricing of Requests for Proposals
Awarded contract to the winner proponent and manage contracts
Prepared and coordinated with supply chain to issue purchase order
Revised and completed Purchase Order revisions as per approved change request
Calculating and reporting “Earned Value Analyses” on multiple projects
Oct 30, 2008-Oct 18, 2010 LEAD SENIOR COST AND SCHEDULE ANALYST – CSA
Ontario Power Generation, Bruce, Pickering & Darlington Sites
Inspection and Maintenance Services and Bruce Restart 1/2
Developed and Managed Primavera Master Schedule
Supported Planned Outages for Bruce Power “A” and “B”, Pickering and Darlington facilities such as B931, B941, B981, B1031, B1061, D1111, D1021, P1072, P1151
Planned, executed and monitored maintenance activities in “Restart ” at Bruce Power
Reflected field progress during the outage by Work Down Curves
Produced and published Outage Performance Report, and Milestones Metrics Reports.
Maintained, Updated and published Level II schedules for multiple outages in “All Inspection Windows” of Primavera P3e V 6.1
Published OPG outages reports aligned to Passport and Cognos reports of Bruce Power
Lead the discussion on deliverable status in milestone review meetings and updated the milestone matrix during the meeting to capture comments and due dates from Campaign Managers
Provided support through work planning and control for “Manager Field Operations”, “Campaign Managers”, “Section Managers”, “First Line Managers”, “Work Package Owners”, “Trades” and other stake holders
Developed and analyzed schedules for nondestructive inspections and maintenance
Planned and monitored outages for inspection of Fuel Channels, Feeder and BOP by CIGAR, ANDE Replica, SLAR, UDM, inspection system on Bruce A and B,
Developed schedule for analysis of Replicas on FRILLS system
Develop the technical risks logs associated with tooling development and maintenance such as Scrape ANDE/CIGAR Hybrid
Provided documentation support in the areas of Hybrid Operations, Mobilization, Demobilization, Maintenance & Training
Prepared engineering documents and reports to a high standard chaired meeting, delivered presentations on campaigns
Developed, maintained and monitored Work Down Curves to track important milestones
Analyzed critical path on outage schedule and cost against each outage event
Performed walk down to stations on critical outage activities
June 15, 2008-Oct 29, 2008 LEAD PLANNER / SCHEDULER
Bruce Power 1-2 Restart, Siemens Electrical Power Supply and Transmission
Managed EPC contract schedules in a multi project environment
Planned and Developed Schedule for “power transmission and distribution project” for restart of Bruce 1 & 2
Built project for stand by generators refurbishment in Primavera P3e V6.0 software
Collected updates from MOD Managers, Field Engineers and foremen to incorporate in schedule for MOD outline, Procurement, Engineering, Installation, MOD completion, Engineering closeout
Monitored subcontractors schedule (AREVA, TLC, Vaspak) for tracking progress on design Change notices (DCN) and work coordination packages (WCP)
Nov 2007- June 14th, 2008 SENIOR CONSTRUCTION COMMISSIONING SITE LEAD PLANNER
Atomic Energy Canada limited (AECL-CNL), Chalk River
Involved in CNSC regulations and licensing processes, including Preliminary Safety Analysis Report preparation and validation
Participated in Radiation protection programs.
Created, updated and maintained master integrated schedules in P6 consisting of 60K activities
Used TRAK, AMMS and transmittal system to incorporate current status for NPF and Maple projects
Supported preparation, review, and conduct of technical and licensing presentations to OPG and CNSC in assigned areas
Performed onsite and offsite radiological dose analyses and tracked worked overly exposed.
Effectively used workflow system for the accurate planning, execution and control of project
Reviewed schedule logic, resources assigned, out of sequence, open ends activities and coding system to tune up schedule on weekly basis
Cleaned up / maintained / integrated MMIR project tasks by coordinating with all project stakeholders to ensure successful project execution.
Collected updates through all the sources such as POD meetings, Construction meeting, Punch List meeting, visiting Engineers and trades in trailers, Field, work facilities, telephone and emails
Issued 4 week look ahead reports to Field Engineers, Construction Engineers, foreman, supervisors, section heads, managers and higher management staff in P3e and excel format
Kept section head well informed with the current status of the site activities
Coordinated among different departments of DIF Project Control to ensure that Engineering, procurement, fieldwork and operations deadlines met as per milestone.
Prepared and reviewed responses to CNSC Requests for Information (RFIs), as well as other correspondence and licensing submissions through AECL to the CNSC.
Prepare and review responses for correspondence from the CNSC through OPG as directed.
Apr 2007- Oct 2007 PROJECT SITE PLANNER / SCHEDULER / COST CONTROLLER
ES. FOX- SNC LAVALIN, Portland Energy Centre Project
Prepared proposal WBS, task and resource schedule, cost summaries, pricing, cash flow and milestone payment plans
Planned and scheduled project of $ 20 million from scratch
Responsible for monitoring and updating overall subcontractor’s schedule
Worked closely with clients (SNC Lavalin) and subcontractors (Black & McDonald, Alstom, Aecon, Lockerbie and hole company, Guild…etc)
Coordinated with “Director Project Controls” and “project management staff” on all activities related to designing and implementing project management system
Prepared, reviewed, monitored and updated “Combustion Turbine Generator” (CTG), “Balance of Plant” (BOP7), and “Condenser” (CON) projects at “Portland Energy Center”
Updated schedule by getting information from site superintendent, project Manager, Supervisors, Foremen, laborers and other onsite staff
Analyzed risks to project schedules
Assisted in the preparation of schedule data for proposals or contracts
Assumed responsibility for the preparation, quality and accuracy of project and proposal schedules
Performed in-depth what-if scenario analysis and Performed variance analysis
Performed logic analysis of schedules
Coached and mentored for other planners and schedulers on the team
Dec 2005-Mar 2007 PROJECT MANAGER
Pharmaland, Honson Group of Industries, Markham
Developed Project Charter, Project Management Plan and managed execution of production facility
Developed project management best practices, processes, and policies to ensure alignment with corporate governance, strategy and goals
Prepared “Proposal” schedules in coordination with the proposal manager
Planned, supervised and monitored construction of production facility # 2
Prepared project estimates, budgets, and detailed cost engineering.
Monitored schedules and plans for production and maintenance meeting to achieve Batch Time Targets
Identified scheduling risks well in advance by periodic evaluation of productivity rates based on current conditions
Created and maintained a collaborative culture and environment that is open, inclusive and respectful.
Hired, supervised, coached, developed and mentored project controls personnel (i.e. Project Planning and Scheduling Specialist, Lead, Planner / Scheduler.)
Feb 2002-Nov 2005 INSPECTOR CONSTRUCTION / EQUIPMENT INSTALLATION QUALIFICATION/PRODUCTION PLANNER & COST CONTROLLER
Hemosol Pharmaceutical Limited, Mississauga
(Research and a-septic contract manufacturing)
Lead in preparation of licensing submittals to the health Canada, and facilitation of reviews and approvals in support of license for injectable production facility.
Planned, executed and Supervised Pre - Engineering, Engineering, Construction, Installation, Commissioning, and operational activities
Reviewed schedule status and identified any potential issues that may impact the budget and or schedule for the project
Supervised and participated in post construction activities of sterilized filling clean rooms
Planned, executed and oversight sterilized oven installation and executed Installation qualification activities (IQ), Operational qualification (OQ) and production qualification (PQ) activities
Planned and executed construction of aseptic filling facility met all the health Canada regulations
Planned and executed injectable vial capper construction facility
Executed health Canada inspection for a-septic filling sterilized facility
ITS - Information Technology / solutions schedule
IMS - Integrated Manufacturing solutions schedule
Support project managers by advising of schedule deviations from the project plan, analyse risk and contribute to the creation of recovery plans.
Integrate multiple schedules into the master project schedule.
Review schedules provided by external contractors, equipment builders and communicate changes, requirements, and deviations to the master schedule.
Provide weekly reports on project status, project progress and schedule deviations, using information provided by multiple departments and external vendors.
Create high level reports to communicate project status, and support the Project Management Organization
Jan 1999-Jan 2002 PROJECT MANAGER / PRODUCTION AND MAINTENANCE PLANNER
Akzo Nobel Eka Chemicals, Toronto ON
Develops project execution plans, resource allocation plan
Tracked project progress, monitored, and controlled changes and change control process.
Reviewed products Testing reports, prepared documentation, prepared training plans
Reviewed schedules for production, maintenance and order supply and procurement milestones
Reviewed and monitored 2 weeks to 2 months look ahead schedules for production, maintenance and supply chain
Managed the monthly Project Review cycle, compiling actual and estimated costs
Identified and flagged deviations from schedule, creation of the baseline budget
Hired, supervised, coached, developed, and mentored project coordinators (i.e., field and Engineering)
Chemicals safety procedures and external regulations
May 1991- Dec 1998 PROJECT MANAGER
Exxon Mobil Oil Refinery, 450-kbpd productions - $1.2 Billion and Attock Oil Refinery
Planned and scheduled construction of facilities i.e., Harbor Anchors, storage tanks, pipeline, gas stations, workshops, warehouses, pre-engineered buildings, sample points, crude oil decanting, etc
Proactive reporting, forecasting, and trending of all project information in a timely and accurate fashion
Participated in ten years turn around Kickoff meetings and assisted in preparing project plans
Planned and executed regular and emergency shut down and test run projects schedules
Coordinated installation of multimillion value equipment such ICP (Inductive coupled plasma spectroscopy), NMR (Nuclear Magnetic Resonance), RON (research Octane number engine), MON (Motor Octane Number Engine), GC (Gas Chromatographs), HPLC (High Pressure Liquid Chromatograph), MS (Mass Spectrometer)
As a PM initiated, planned, executed, monitored, and closed $ 75 million decanting facility at red sea harbor
Executed and closed $ 25 million IT project for control room operatio
Develop and manage project schedules and associated project documentation.
Provide schedule analysis and schedule metrics on a weekly basis.
Process Validation schedule
Thermal Validation schedule
Maintenance schedule