Curriculum Vitae
Mail: adyta5@r.postjobfree.com Ph:974-********
Name:
Nanda Gowdar Lokeshwarappa
Age:
Nationality:
Indian
Personal Profile/Overall experience:
With over 29 years of experience and a highly talented, results-driven
Engineering Professional as a Process & Mechanical engineering with exposure to EPC contracts. Experienced in preparing Basic & Detailed Engineering Design in the field of Storm/TSE/Potable water & Wastewater Pump station, Reverse Osmosis, Sewage Treatment, Industrial waste water treatment Plant, Utility &Desalination. Knowledge of HVAC & firefighting Building services
Start up and commissioning and Management Skills in managing all aspects of engineering & project coordination.
Recognized for excellent communication, management, and leadership skills.
Over 28 year experience within the field of Engineering & Projects, including:
Process & mechanical Design
Presentations
Follow up Structure of works
Start up and commissioning.
Training
Technical Consultancies
SKILLS & ABILITIES
Experience in working with Project management Including Budget Development, Project planning & Finance.
Demonstration of excellent communication skills verbal & writing.
In depth Knowledge of Project execution /Goals /strategies/risks & opportunities.
Presentation skills for interaction with client & Internal team
Ability to interact with people.
Excellent Computer Skills strong Knowledge of MS word/Excel/Auto Cad/Navis work/Cad works.
Excellent Technical Skills with problem solving & creativity
Strong Organizational skills to balance & prioritize skills & ability to work Under pressure
Role in Metito: 2008-2023
Project Engineer & Engineering Coordination – 4years
Project Manager – 6 Years
Engineering & Design Team Leader – 5 years
Location:
Qatar, Doha
Key Responsibilities:
Project Management + Engineering Coordination under Project Department.
Design Team Leader under design Department
Length of Service in Metito:
15 years
Education:
Bachelor in Mechanical Engineering
Functional Experience:
2008-2021
K-PACK SYSTEM PVT.LTD 1993- 2008
Apply sound engineering principles in the development and documentation of the product.
Experience in Process Design Calculation & System design of API/CPI/TPI/DAF (CIRCULAR & RECTANGULAR) Separators. Preparation of Assembly GA & fabrication Drawing.
Experience in Process design Calculation & System design of Lamella Separators. Preparation of Assembly GA & fabrication Drawing.
Experience in Process design Calculation & System design of IGF Separators. Preparation of Assembly GA & fabrication Drawing.
Preparation of Process &controls description for API/CPI//TPI/DAF/Lamella/IGF.
Experience in Testing & commissioning for API/CPI/TPI/DAF/Lamella/IGF oil in water separator.
Experience is process & mechanical design of Air saturation Pressure vessels for DAF System.
Experience is Process Design Calculation & System design & Mechanical design Flash Mixers/Tank Flocculators /Pipe Flocculator for primary treatment plants.
Experience on rotating Equipment’s like pumps (submersible Pump (Wet well & dry well Installation)/Horizontal centrifugal pumps & Positive displacement pumps) Compressors, Blowers, Agitator or Mixers, Gear Boxes & Motors.
Experience on static such as Pressure vessels /heat exchangers, storage tanks, heaters, Piping systems, Valves & other package equipment.
Responsible for preparation of specification /Drawings & technical data sheet, requisition for quotation, review of vendors offers, Technical queries, technical bid Analysis, approval of vendor & contractor drawing/Documents.
Well acquainted with National and International Codes and Standards like ASME, ASTM, API, AISC etc.
Roark’s Formula for Stress & Strain Calculations for rectangular tanks
Review of 3D model & Piping stress Analysis Reports & calculations
Provide direct instruction and guidelines for team of designers to ensure effective delivery of projects and tasks to meet the deadlines and to design in compliance with international standards, project specifications, QHSE requirements and local regulation.
Study project specifications and drawings and prepare summary of key points for quick reference during detailed design.
Review of Design &Deliverables prepared by engineers & ensure its compliance with Project specification& QCS 2014 requirements.
Provide technical support to external and internal customers.
Support sales team in pre-sales technical concept and budgeting activities.
Interpret client requirements, identify and address design parameters and engineering problems and ensure solutions are implemented accurately and in budget.
Analyse project requirements and perform technical calculations supporting design.
Create accurate Bill of Materials.
Define equipment and parts from external suppliers.
Conduct cost estimation.
Preparation of training Manual & presentation to operating team.
Specialized in oil in water treatment process Equipment’s.
Process & Mechanical design of primary treatment plant.
15 years, experience in Process Design Calculation & System design of oil in water separators, Preparation of Mechanical design calculations, GA & Fabrication drawing, Installation, Testing & commission of API/TPI/CPI/Lamella/DAF/IGF separators.
Experience in Process Design Calculation & System design of oil in water separators, GA & Fabrication drawing, Installation, Testing & commission of
Flash Mixers/Tank Flocculators /Pipe Flocculator / Air Saturating Pressure vessel /Screw Conveyors.
Experience in Process Design Calculation & System design of oil in water separators, GA & Fabrication drawing, Installation, Testing & commission of Course & Fine Screens (Rectangular & Basket /Drum screen).
Review of Rotating Equipment such as Gear box, Motors, oil skimmers, Screw Conveyors, Belt Conveyors, Pump’s & Compressors.
Working Experience on preparation of technical data sheet for static equipment /rotating & Valves
Preparation of proposals for sales.
Negotiation & Finalization of sales prices with client.
Presentation of primary treatment plant & Oil Separation equipment to client before sales.
Preparation of Process & Mechanical Design & Drawings.
Negotiation & Finalization of rates with subcontractor & fabricators & Equipment suppliers.
Site visits to facilitate Installations and commissioning of the equipment.
Preparation of Training Manuals & Presentation
Quality control & preparation of MDBR (Manufacturers Data Book Records)
RASLAFFAN PETROCHEMICAL PROJECTS(RLPP)
Client : RLIC
Location : Raslaffan (Qatar)
Process : Extended Aeration (SBR)
Sewage Treatment Plant Capcity : 4350 m3/day
Responsibility : Project Engineering Manager
Leading the Technical /Design Review meetings.
Leading Engineering progress Meetings & Responsibility on the project schedule.
Review & finalizing of all Engineering Documents
Review of Offers & finalizing the offer technically & Suggestion.
On the prizes to project department.
Review of Purchase Orders and sign off from Engineering side.
Leading & taking the responsibility to answer the questions raised by the client during the HAZID/HAZOP/SAPOFF study.
Review & leading the close out meetings of HAZID/HAZOP/SAPOFF documents issued from 3rd party consultants.
Leading the 3D modelling review and suggesting the way out for the clarification raised during the meeting
Technical & Commercial Coordination with Project team/Vendors.
Finalization of technical offer & Review of Purchase Order with the project engineers.
BARWA CITY SEWAGE TRETMENT PLANT
Client : ASHAGAL
Location : Doha, Qatar
Sewage Treatment Plant Capcity : 4392m3/day & 8760m3/day
Process : Extended Aeration (SBR)
Responsibility : Team Leader Engineering
& Design & Project Engineering
Attend Technical /Design Review meetings.
Review of Design & Technical Submittal as per Project specification.
Preparation of equipment Layout & Civil out line drawings.
Preparation & Review of engineering deliverable & Schedule.
Review of piping layout, review of Isometric drawing.
Attend meeting with manufacturer finalize equipment technical issues.
Responsibility to solve issue at site during construction & Commissioning.
Technical & Commercial Coordination with Project team/Vendors.
Finalization Of offer & Review of Purchase Order
QP MESAIEED DRAINAGE PHASE-1 (Surface Water Drainage System)
Client : Qatar Energy
Location : Mesaieed Industrial Area (QATAR)
Pump station Capacity GWPS1 : 9720 m3/day
Pump station Capacity GWPS2 : 11,712 m3/day
Pump capacityof 405m3/hr. for GWPS1 & 488 m3/hr. GWPS2
Responsibility : Team Leader Mechanical Engineering
& Design Coordination with Design Consultant QDC
Review of Detail Design & Drawings
Review
Preparation on & review of Design Speciation for all Equipment/Pipes/Valves/ Pumps Etc..
Pump design, Manufacture Construction & installation as per QCS 2014 Section 9 Part 2
Preparation of data sheet & Technical review of :
-Submersible Pump Capacity 140 l/sec (2Duty & 1Stand By )
-DI Pipes & fittings as per BS EN 545complying to QCS 2014 Section 8 Part 3 Pipe size ranging from 200- 900 Dia.
-Valves as per BS EN 593 complying to QCS 2014 Section 8 Part 5.
-Air release valves double orifice complying to QCS 2014 Section 8 Part 5.
-Penstock technical submittal Review & Installation details complying to QCS 2014 Section 8 Part 5.
Technical & Commercial Coordination with Project team/Vendors.
Finalization Of offer & Review of Purchase Order
SMELTER PLANT
Location : INDONESIA
Desalination Plant capacity : 3891m3/hr.
Responsibility : Team Leader Engineering
& Design& Project Engineering
Review of Design & Deliverables as per Project specification.
Attend technical /Design Review /3D Model review meetings.
Preparation of equipment Layout & Civil out line drawings.
Preparation of engineering deliverable & Schedule.
Review of Technical data sheet for Static equipment’s like gravity multimedia filters /lamella clarifier RO system/Energy Recovery system/Cartridge filters /Pumps/Blowers /mixers & valves
Attend progress meetings take decision on the schedule.
WASTE WATER TREATMENT (RLOC)
Client : RLOC
Location : RASLAFFAN (QATAR)
Grey Water Treatment Plant Capacity : 4350 m3/day
Process : MBBR
Responsibility : Team Leader Engineering & Design& Project Engineering
Process, System & mechanical design of DAF & Pipe Flocculator System.
Review of Design & deliverables as per Project specification.
Attend technical /Design Review /3D Model review meetings.
Preparation of equipment & Civil out line drawings.
Preparation of engineering deliverable & Schedule.
Preparation & review of Technical data sheet for Static equipment’s /Pumps/Blowers /mixers & valves
Preparation of Technical data sheet & review of Horizontal centrifugal Pump in accordance to ANSI B 73.1
Preparation of Technical data sheet & review of Progressive Cavity pump Design, Manufacturing Standard API 676 & API 675
Guiding the engineering team in the preparation of the Gate valve & Butterfly valve data sheet as per API 600 & ASME B16.34/API 609
Review of vendor proposals as per the technical requirement & Specification
3D Model Review
Coordination with contractor for technical approval of engineering Documents.
UM AL HOLUL FREE ZONE
Client : Manatec Real Estate
Location : Um Haloul Free Zone
-Sewage Lift Station
-Firefighting Pump station.
-TSE Water Pump Station
-Potable water Pump station
Responsibility : Project Engineering Manager & Design Coordination with Design Consultant KEO.
Review of Detail Design & Drawings
Pump design, Manufacture, Construction & installation as per QCS 2014 Section 9 Part 2
Preparation of data sheet & Technical review of :
Submersible Pump Capacity 60 l/sec (2Duty & 1Stand By )
Split Casing Horizontal centrifugal pump Capacity 150 l/sec & 215 lts./sec (3 Duty & 1Stand By ) complying to QCS 2014 Section 9 Part 4
DI Pipes & fittings as per BS EN 545complying to QCS 2014 Section 8 Part 3 Pipe size ranging from 200- 900 Dia.
Butterfly valves as per BS EN 593 complying to QCS 2014 Section 8 Part 5
Air release valves double orifice complying to QCS 2014 Section 8 Part 5
Penstock technical submittal review & installation details complying to QCS 2014 Section 8 Part 5
Preparing engineering deliverables schedule.
Review of hydraulic calculation.
Review of Pump technical submittal
Guiding mechanical engineer responsible in preparation of Detailed Mechanical Layout Drawings, Piping drawings Etc...
Managing to resolve technical issues during engineering & during installation.
Preparation of operation & Maintenance training manual & presentation on site to operation team.
Technical & Commercial Coordination with Project team/Vendors.
Finalization Of offer & Review of Purchase Order
WASTE WATER REDUCTION & RECYCLE PROJECT
Industrial Waste Water Treatment Plant
1.Sand filtration System
2.ACF & RO(Reverse Osmosis) System.
3.Nutshell filter
4.MBR system
5.Sludge treatment system (Oily sludge & Bio Sludge)
6.ZLD (Zero discharge Unit for Qatar Gas)
Client : RLIC
Location : RASLAFFAN (QATAR)
WWTP : Different Capacities
Responsibility : Project Engineering Manager
Review of Design &deliverables as per Project specification.
Attend technical /Design Review /3D Model review meetings.
Preparation of equipment & Civil out line drawings.
Preparation of engineering deliverable & Schedule.
Preparation & review of Technical data sheet for Static equipment’s /Pumps/Blowers /mixers & valves
Preparation of Technical data sheet & review of Horizontal centrifugal Pump capacity 330 m3/hr to 63 m3/hr. Design & manufacture in accordance to ANSI B 73.1
Preparation of Technical data sheet & review of Progressive Cavity pump ranging from 10 m3/hr. to 5 m3/hr. Design, Manufacturing Standard API 676 & API 675
Guiding the engineering team in the preparation of the Gate valve & Butterfly valve data sheet as per API 600 & ASME B16.34/API 609
Review of vendor proposals as per the technical requirement & Specification
3D Model Review
Review of Piping stress calculations.
Coordination with contractor for technical approval of engineering Documents.
Technical & Commercial Coordination with Project team/Vendors.
Finalization Of offer & Review of Purchase Order
EAST INDUSTRIAL AREA (Al Rayan Stadium) Pump Station
Client : Ashghal
Location : Doha, Qatar
Capacity : 110 m3/hr.
Responsibility : Project Engineering Manager
Review of Design & deliverables
Pump design, Manufacture, Construction & installation in accordance QCS 2014
Preparation Data sheet & Technical review
Review of Design &deliverables
Preparing engineering deliverables schedule.
Review of hydraulic calculation.
Review of Pump technical submittal
Guiding mechanical engineer responsible in preparation of Detailed Mechanical Layout Drawings, Piping drawings Etc..
Manging to resolve technical issues during engineering & during installation.
Preparation of operation & Maintenance training manual & presentation on site to operating team.
Attend technical & Project related meetings.
Preparing engineering /project deliverables schedule.
Issue of Contractual letters
Preparation of Budget for the project.
Review of vendor proposals as per the technical requirement
Release of PO to the Vendors /suppliers Manufacturer
Review of Piping GA drawing
Finalize designs to meet project requirements.
Coordination with contractor& Consultant for technical approval of the engineering & equipment deliverable.
Site Installation coordination.
Manging to resolve technical issues during engineering & during installation.
Technical Assistance & Coordination with commissioning team during Testing & Commissioning
Preparation of Invoices.
LUSAIL PUMPING STATION
SW4/RPS1/RPS4/IR3
IR4/SW1
Client : Ashghal
Location : Lusail, Qatar
Capacity : Pumping station 6 Nos
-SW4 – Storm water Pump Station+ raising main out fall to the sea Capacity 600lts/sec.
-SW1- Storm Water Pump Station + raising main out fall to the sea Capacity 1750 lts /sec.
-IR3&4 –Irrigation Pump Station Capacity 150lts/sec
-RPS1 & 4 PW Pump Station Capacity 125 to 250lt/sec
Responsibility : Project Manager & Design Engineering Coordination with Design consultant
Review of Design &deliverables.
Pump Design, Manufacture, Construction & installation as per QCS 2014 & Project Spec.
Preparation of data sheet & Technical review of all Equipment’s.
Attend technical & Project related meetings.
Preparing engineering /project deliverables schedule.
Issue of Contractual letters
Preparation of Budget for the project.
Review of vendor proposals as per the technical requirement
Release of PO to the Vendors /suppliers Manufacturer
Review of Piping GA drawing
Finalize designs to meet project requirements.
Coordination with contractor& Consultant for technical approval of the engineering & equipment deliverable.
Site Installation coordination.
Manging to resolve technical issues during engineering & during installation with design consultant Hal crow.
Technical Assistance & Coordination with commissioning team during Testing & Commissioning
Preparation of Invoices.
MESSAIEED IPP A PROJECT
Sewage (STP)treatment plant
Client : Iberdrola/ Messaieed Power station
Location : Doha, Qatar
Capacity : 70 m3/hr.
Process : MBBR
Responsibility : Project Manager & Engineering Coordination
Attend Project & Engineering Technical Review Meeting
Preparing Engineering & Project Deliverable schedule
Review of Design & deliverables as per QCS 2014
Coordination for equipment deliverable with Suppliers
Finalizing with suppliers and issuing purchase orders.
Assisting site Installation team
Technical Assistance & Coordination with commissioning team during Testing & Commissioning
Preparation of Invoices.
WASTEWATER TREATMENT PROJECT
Grey water treatment Plant & RO (Reverse Osmosis) unit
Client : UDC/St. Reghis Hotel
Location : Doha, Qatar
Capacity : 50 m3/day.
Responsibility : Project Manager & Mechanical Engineering lead
Attend Project & Engineering Technical Meeting
Preparing Engineering & Project Deliverable schedule
Review of Design & deliverables as per QCS 2014
Coordination for equipment deliverable with Suppliers
Finalizing with suppliers and issuing purchase orders.
Assisting site Installation team
Technical Assistance & Coordination with Commissioning team during Testing & Commissioning
Preparation of Invoices.
STP TREATMENT PLANT
Client : MANATEQ
Location : Um Halul, Qatar
Capacity : 800 m3/day.
Process : MBBR
Responsibility : Project Manager & Mechanical Engineering lead
Review of Design &deliverables as per Project specification.
Preparation of equipment & Civil out line drawings.
Preparation of engineering deliverable & Schedule.
Review of vendor proposals as per the technical requirement & Specification
Preparation of static & Rotating & Piping & Valves equipment technical data sheet
Coordination with contractor for technical approval of engineering Documents.
INDUSTIRAL WASTE WATER TREATMENT SYSTEM
Primary treatment plant for oil water Seperation
Client : Cairn Energy
Location : Rajahmundry INDIA
Capacity : 200 m3/hr..
Responsibility : Senior Executive Engineer
Prepration of Proposals & attending Negotiation with client
Fianlizing of order with the client
Attend Project & Engineering Technical Meeting
Preparing Engineering & Project Deliverable schedule
Review of Design & deliverables as per project specification
Coordination for equipment deliverable with Suppliers
Finalizing with suppliers and issuing purchase orders.
Assisting site Installation team
Technical Assistance & Coordination with commissioning team during Testing & Commissioning
INDUSTIRAL WASTE WATER TREATMENT SYSTEM
Primary treatment plant for oil water Seperation
Client : Bechtel /OGD-3
Location : UAE- Designed in India under K-Pack
Capacity : 150 m3/hr..
Responsibility : Senior Design Engineer
Prepration of Proposals & attending Negotiation with client
Fianlizing of order with the client
Preparing Process design Calculations
Equipment sizing Calculations.
Review of P&ID & Equipment data sheets
Preparing Engineering & Deliverable
Attend Engineering Technical & Project Meeting
Review of Design as per Project Specification
Preparation of static & Rotating & Piping & Valves equipment technical data sheet
Coordination for equipment deliverable with Suppliers
Finalizing with suppliers and issuing purchase orders.
Assisting site Installation team
Technical Assistance & Coordination with commissioning team during Testing & Commissioning
INDUSTIRAL WASTE WATER TREATMENT SYSTEM
QCLNG Primary treatment plant for oil water Seperation
Client : Bechtel/ Queens lands Curtis LNG
Location : Australia Designed India Under K-PACK
Capacity : 150 m3/hr..
Responsibility : Senior Design Engineer
Prepration of Proposals & attending Negotiation with client
Fianlizing of order with the client
Preparing Process design Calculations
Equipment sizing Calculations.
Review of P&ID & Equipment data sheets
Mechanical design calculations & related equipment Drawings.
Layout drawings Preparation of static & Rotating & Piping & Valves equipment technical data sheet
INDUSTIRAL WASTE WATER TREATMENT SYSTEM
Primary treatment plant for oil water Seperation
Design/ Supply & Testing Commissioning of Equipemts
Client : ONGC / HPCL/ CAIRN ENERGY/GAIL
INDIAN OIL PLATFORM AREA
UEM Delhi
Hindustan Dorr Oliver (Chennai/Mumbai)
Vatch Wabag (Chennai)
Veatech (Poona)
Location : All project sites in India
Capacity : 150 m3/hr.
Responsibility : Senior Design Engineer
Prepration of Proposals & attending Negotiation with client
Fianlizing of order with the client
Preparing Engineering & Deliverable
Attend Engineering Technical & Project Meeting
Review of Design as per Project Specification
Preparation of static & Rotating & Piping & Valves equipment technical data sheet
Coordination for equipment deliverable with Suppliers
Finalizing with suppliers and issuing purchase orders.
Assisting site Installation team
Technical Assistance & Coordination with commissioning team during Testing & Commissioning