Post Job Free

Resume

Sign in

Project Engineer Power Systems

Location:
Houston, TX
Salary:
75000
Posted:
August 08, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

*. NAME: GINI, PATRICK, OBIEKWE, UBA

2. DATE OF BIRTH: 20th MAY 1956

3. PLACE OF BIRTH: SOKOTO

4. STATE OF ORIGIN: ANAMBRA

5. RESIDENTIAL ADDRESS: 3730 E. Ashford Villa Lane, Houston TX, USA. 6. CONTACTS NO: Mobile: +1-832-***-****

7. MARITAL STATUS: MARRIED WITH THREE (3) CHILDREN 8. PRESENT EMPLOYMENT: Momentum Solar, Houston TX-USA. - An Appointment Setter.

{Disengaged simce 05/02/2022.}

9. SCHOOLS ATTENDED:

S/N SCHOOLS ATTENDED DATES QUALIFICATIONS

1. MALLAM BANKANU PRIMARY SCHOOL SOKOTO 1961 – 1966 2. NATIONAL SECONDARY SCHOOL NNEWI 1970 – 1976 WASC 3. UNIVERSITY OF NIGERIA NSUKKA 1976 – 1982 B. ENG. Electrical & Electronic Engineering.

10. MAJOR COURSES ATTENDED

S/N DATES DESCRIPTION AND ORGANIZERS

A. 19/03/84 - 19/04/84 REFINERY ORIENTATION-IN WARRI REFINERY B. 08/04/87 - 1504/87 CABLE JOINTING AND TERMINATION -IN WRPC BY RAYCHEM. CONSULTANTS

C. 1988 POWER SYSTEMS EXCITAION REGULATION AND CONTROL FOR FRAME 5 GE TURBINES, BY GENERAL ELERIC CO -USA, AT- WRPC

D. 08/09/95 - 13/09/95 POWER SYSTEMS PROTECTION AND CONTROL - BY POWER SYSTEMS LTD IN CONJUNCTION WITH NEPA IN BENIN

E. 08/06/90 - 15/06/90 MICRO PROCESSORS IN INDUSTRIAL APPLICATION BY O'SECULL NIG LTD WARRI IN BENIN

F. 04/09/96 - 10/09/96 PROGAMABLE LOGIC CONTROLLERS (PLC) OPERATIOS AND MAITENANCE AT UNIVERSITY OF IBADAN (Ul)

G. 7/08/92-12/08/92

INDUSTRIAL RELATIONS SKILL BY AGROVOG LTD KADUNA DURBA HOTELS

H. 17/05/88 -24/05/88 LABOUR RELATION INDUSTRIAL HARMONY NIG. INSTTUTE (NILS) ILORIN AS WRPC BRANCH CHAIRMAN OF PEGASSAN

I. 28/06/94- 04/07/94 DISTRIBUTED CONTROLS SYSTEM (DCS) – FUNDAMENTALS – YOKOGAWA ARMASSFOT HOLLAND

J 21/11/94 -21/12/94 DISTRIBUTED CONTROLS SYSTEM - MAINTENANCE AT RUCORN, CHESHIRE, ENGLAND - YOKOGAWA

Page 1 of 7

K 7/09/02 - 21/09/02 DCS/PLC OPERATIONS AND SELECTION IN PROJECT APPLICATION BY HAVILAH ENGINEERING LTD- AT IBADAN

L 7/03/03—14/03/03 ELECTRICAL HAZARDS AND SAFETY BY NIGERIAN SOCIETY OF ENGINEERS (NSE) AT SANGO OTTA

M 18/8/03-25/8/03 INCIDENT & INJURY FREE (IIF) WORKSHOP AT CHEVRON TEXACO HQ IN HOUSTON BY JMJ OF AUSTIN TEXAS

N. 07/08/10 -14/08/10 INCIDENT & INJIRY FREE (IIF) WORKSHOP AT CHEVRON TEXACO HQ IN BRACKNELL UK BY JMJ FOR CAMERON LTD /TOTAL

OFFSHOE USAN DEEP OFFSHORE SUBSEA PRODUCTION

SYSTEM (SPS)

O. 11/10/10-25/10/10 CORROSION MANEGEMENT AND CONTROL BY TOTAL OFFSHORE A PARIS FRANCE.

P. 20/O6/11- 01/07/11 ESSENTIAL SKILL FOR OIL & GAS PROFESSIONALS BY TOTAL WITH IHRDC IN BOSTON USA.

Q. 08/10/12 - 19/10/12 TECHNOLOGY OF OIL & GAS EQUIPMENT BY CHEVRON AT IFP IN FRANCE PARIS

R. 28/04 – 04/05/13 & 14 OFFSHORE TECHNICAL CONFERENCE (OTC), HOUSTON, USA. S. 08/07/13 – 20/07/13 ECONOMIES OF WORLD PETROLEUM PRODUCTION AND EXPANDED BASIC PETROLEUM ECONOMIC, PETROSKILLS

CENTRE, HOUSTON, USA.

T. 16/08/14 – 20/08/14 OIL AND GAS CONFERENCE, DENVER, COLORADO, BY ENERCON

U. 28/10/14 – 12/11/14 ADVANCE PETROLEUM PRODUCTION OPERATION AND PROCESSING. BY SMART KONCEPT TECHNOLOGY, HOUSTON,

USA.

V. 11/09/15 - 13/09/15

SOCIETY OF PETROLEUM ENGINEERS CONFERENCE ON FIBER OPTICS FOR WELLS, RESERVIORES & FACILITY MANAGEMENT AT NAPA VALLEY CALIFONIA -USA.

W. 28/09/15 – 02/10/15 SYSTEM APPLICATIO AND PRODUCTS(SAP) TRANING GHANA. X.. 05/10/15 – 09/10/15 LEADERSHIP, COACHING AND MENTORING BY GLOBALTRAININ TRAINING CONCULTING SPONSORED BY CHEVRON- HOUSTON

11. STATEMENT OF EXPERIENCE AND RESPONSIBILITY

S/N DATE POSITION, EMPLOYER AND DESCRIPTION OF PROJECT (WITH COSTS ETC)

I. 1979 &1980 POWER CONSTRUCTION, DISTRIBUTION AND INSTALLATIONS WORKS WITH RICHLINE VENTIRES LTD ENUGU (INCLUDING

FEDERAL GOVT COLLEGE KATSINA).

II 22/11/83-12/02/84 PUPIL ENGINEER NATIONAL ELECTRIC POWER AUTHORITY

(NEPA) IJORA LAGOS & ENUGU

Page 2 of 7

III. 13/02/84 - 09/09/92 SUPERVISOR ELECTRICAL MAINTENANCE WARRI REFINERY

(WRPC)NNPC IN CHARGE ELECTRIC MOTORS SWITCH GEARS, TRANSFORMERS, HOISTS, LIFTS, CRANES, MOTORIZED VALVES, TURBINE, STEAM & D1ESEL GENERATORS, LIGHTING SYSTEMS, RELAYS, PROTECTION EQUIPMENTS ETC

IV 23/01/88-09/06/90 TERRESTIAL ELECTRICAL WORKS AND INSTALLATION OF LIHGTENING PROTECTIONS AND GENERAL EARTING SYSTEMS V APRIL-JUNE 1987 PLANING SUPERVISOR- PREVENTIVE MAINTENANCE PLANING AND PROGRAMMING, MACHANALYSIS, VIBRATION MONITORING AND CONTROL ETC

VI JULY- AUGUST 1987 AS INSTRUCTOR SPECIFIC COURSE UNDER COMMERINT SPA OF ITALY KRPC & WARRI PETROCHEMICALS TRAINEES AT PETROLLEUM TRAINING INSTITUTE (PTI) WARRI

VII 1986-1988 GROUP LEADER ELECTRICAL WORKS AREA 1&2 (TOPING, REFORMING AND VACUM UNIT

VIII 1988-1990 GROUP LEADER AREAS 3&4 ELECTRICAL WORKS HF (HYDROFLOURIC ACID PLANT) AND FCC (FLUID CATALYTIC CRACKING) PLANTS IX 1990 – 1992 ELECTRICAL SUPERITENDENT POWER PLANT AND UTILITIES WRPC X 1992 – 1999 HARDWARE SUPERITENDENT IN CHARGE OF SYSTEMS AND MAINTENANCE OF DISTRIBUTED CONTROL SYSTEMS (DCS)-FOR YOKOGAWA.FOXBORO & HONEYWELL

XI 1992 – 1999 HARDWARE SUPERITENDENT PROGRAMMABLE LOGIC CONTROLLER

(PLC)-FOR SIEMENS, ALLANBRADLEY, FUJI, GE FANUC, MITSUBISHI MODELS; UNINTERRUPTED POWER SUPPLY (UPS) SYSTEMS FOR YUASA-JAPAN, BORRIS-UK ETC LASTLY PERSONAL COMPUTERS (PC) FOR WRPC PERSONNELS AND THE LOCAL AREA NETWORK (LAN) XII 1999 – 2006 MONITORING, SUPERVISION AND CORDINATING MAINTENANCE INTERVENTION & FACILITIES UPGRADES IN FACILITY DEPT OF GAS DIVISION OF NAPIMS FOR THE JOINT VENTURE COMPANIES EG SPDC, CHEVRONTEXACO, ELF, EXXONMOBIL

XIII 23/03/1999 - 2006 CASHCALL ADMINISTRATION & VERIFICATION; INVESTIGATION & VALIDATION OF JOINT VENTURE & RETURNS IN FACILITY DEPT OF GAS DIVISION.

XIV 01/01/2008-31/12/2010 AG. DEPUTY MANAGER PRODUCTION & DEVELOPMENT PSC DEPT. GAS DIVISION

XV. 01/.01/2011 - TO DATE AG. DEPUTY MANAGER POWER PLANTS IN (DEPENDENT POWER

(16/10/14) PRODUCTION(IPP) & SPECIAL PROJECTS(SP) IN GAS DIVISION

-NAPIMS- NNPC.

12. PROJECT WORKS

S/N DATE POSITION, EMPLOYER AND DESCRIPTION OF PROJECT (WITH COSTS ETC)

1 1987-1988 PROJECT ENGINEER ELCTRICAL FOR DESIGNS, CONSTRUCTION AND) INSTALLAION OF SYSTEMS AND MONITORING FOR THE

DEBOTTLENECKING PROJECT OF WRPC WITH SNAPROGETTI SPA OF ITALY- MAIN CONTRACTORS. ($120M)

2. 1992-1994

PHASE II REHABLITATION PROJECT OF WRPC INVOLING

Page 3 of 7

DETAILED ENGINEERING, CONSTRUCTION AND INSTALLATION WORKS WITH CHIYODA CORPORATION TSURUMI-YOKOHAMA

JAPAN AND NIGERIA ($150M)

3. 06/09/86 -28/09/86 INSTALLATION, CABLING AND COMMISSIONING OF A 95KV MOTOR, BY REPLACING THE OLD TURBINEDRIVE.IN WRPC

4. 07/01/87-02/03/87

INSTALLATION AND COMMISIONING OF 11KV UNDERGROUND

AMOURED CABLE FROM SUSTATION 5 TO JETTY IN WRPC A

DISTANCE OF 6KM.

5 MAY'99 - UNE 2000 PROJECT ELECTRICAL &INSTRUMENT ENGINEER- OBIGBO AGG JV PARTNER SPDC WITH PARAGON ENGINEERING SERVICES

UNDER

6 JUN 2000 - MAR 2001 PROJECT ELECTRICAL & INSTRUMENT ENGINEER FOR FORCADOS YOKRI INTEGRATED PLANT (FYIP) PROJECT JV

PARTNER- SPDC HAGUE NETHERLANDS ($220M)

7 APRIL -AUG, 2001 PROJECT ENGINEER ESCRAVOS GAS TO LIQUID (EGTL) PROJECT WITH FORSTER WHEELER UK READING ENGLAND

(S1.85BN)

8 SEPT - DEC, 2001 AGBAMI OFFSHORE PSC PROJECT, PROJECT ENGINEER JV PATNER TEXACO UNLIMITED HOUSTON TEXAS. ($3.7BN)

9 JAN 2002 TO DATE. PROJECT ENGINEER ESCRAVOS GAS PLANT 3 WITH PARSONS ENGINEERING AND CHEMICAL COMPANY HOUSTON, AND

FORSTER WHEELER USA HOUSTON TEXAS AND HYUNDAI HEAVY INDUSTRIES (HHI) SEOUL SOUTH KOREA. (FEED AND DETAILED ENGINEERING). ($454M)

10 AUG TO OCT 2006 CLARIFICATION MEETINGS AND TECHNICAL EVALUTION OF BIDS FOR THE WEST AFRICAN GAS PROJECT (WAGP) FOR UTOROGU AND OBEN

11 OCT TO DEC 2006 EVALUTIONS ON OML58 UPGRADE FOR OBITE GAS PLANT FOR GAS SUPPLY TO LNG

12 1/11/04-15/12/04 INDEPENDENT POWER PRODUCTION (IPP) 900MW AFAM POWER PLANT SHELL NIGERIA-EVALUATION ($600M)

13 6/10/95-16/10/95 FACTORY ACCEPTANCE TEST (FAT) WITH YOKOGAWA-CONTROL BAILEY IN VEINLEZY FRANCE

12 14/02/05-07/03/05 HAZOP PARTICIPATION FOR SPDC GBARAN-UBIE (IOGP) ($1.2BN) 13 JULY 2003 FACTORY ACCEPTANCE TEST (FAT) WITH GTI AND KARVERNER ENERCON UNDER SAIPEM FOR CONDENSATE METERING SKID

VALIDATION AND PERFORMANCE AT TERNUZEN ZEELAND

NETHERLANDS FOR SHELL NIGERIA ($250M)

14 3/10/99-10/10/99

FAT FOR SWITCH GEARS WITH POWELL ENGINEERING SERVICE HOUSTON TEXAS FOR SHELL NIGERIA OBIGBO AGG SUBSTATIONS 15 15/10/99-25/10/99 FAT FOR FISHER ROSEMOUNT (EMERSONS) DCS, PLC AND F&G SYSTEMS WITH PUFFER SWIVEN UNDER KBR FOR OBIGBO AGG FOR SHELL NIGERIA

16 7/9/03-14/09/03 FAT FOR RADIO FREQUENCY ANTHENAS AND DISHES FOR COMMUNICATION NETWORK FOR IRRI FLOW STATION FOR NAOC- AGIP NIGERIA BY EUROTECH MILAN UNDER SAIPEM EN!

Page 4 of 7

17. 13/03/99 TO 18/05/06 MAJOR DUTIES INCLUDE BUT NOT LIMITED TO: NEGOTIATION FOR ALTERNATIVE FUNDING AND GAS PURCHASE AGREEMENT.

MONITOR, CO-ORDINATE, SUPERVISE, PARTICIPATE AND MANAGE ALLOCATED PROJECTS IN ACCORDANCE WITH APPROVED PROJECT MANAGEMENT PROCEDURE WITH JV PARTNERS FROM CONCEPTION THROUGH FEED TO CONSTRUCTION AND CLOSE-OUT STAGE.

ENSURE COMPLIANCE TO APPROVED PROCEDURE, RELEVANT

ENGINEERING DESIGN, BEST PRACTICES, STANDARDIZATION AND SPECIFICATION WHERE NECESSAEY FOR BROWN FIELD UPGRADE. IMPLEMENT GOVT POLICIES ON LOCAL CONTENT

IMPLEMENT SUSTAINED COMMUNITY DEVELOPMENT PROGRAMMES FOR THE IMMEDIATE COMMUNITIES.

REPORTING AND MAKING PRESENTATION USING MS PROJECT AND AUTO CARDS RAISING CONCERNS AND RECORMENDING SOLUTIONS INVOLVED IN RISK ASSESMENT, VALUE ENGINEERING, VALUE ASSURANCE, OPERATION ASSURANCE, COST CONTROL, CHANGE ORDERS, AND VARIATION LIMITS ETC.

PROJECT PLANNING, SCHEDULING AND CONTROLLING OF EXECUTION PLAN, MATERIAL LISTING AND SELECTION, SUBCONTRACTING OF MINI CONTRACT AND LOCAL AND FOREIGN PURCHASING.

ADMINISTER A PROPER AUTHOURISATION FOR THE VARIOUS STAGES OF ALLOCATED RESOURCES WITHIN THE LIMITS OF MY AUTHORITY. EXERCISE CONTROL, VERIFY AND VALIDATE CASHCALLS,

EXPENDITURE AND RETURNS IN CASHCALL ADMINISTRATION TO ENSURE ADHERENCE TO BUDGET.

LIAISE WITH DICIPLINE ENGINEERING GROUPS; REVIEW DETAILED ENGINEERING DESIGNS, HAZOPS, SAFOPS, HAZIP, SIMOP, CONSTRUCTABILITY, MAITAINABILITY AND CONSTRUCTABILITY, AND TECHNICAL SUITABILITY AND FITNESS FOR PURPOSE.

PRODUCE TIMELY PROJECT REPORT COVERING THE SCOPE,

BUDGET, AREAS OF CONCERNS ETC. AT THE END OF EACH PROJECT ATTACHMENT.

ATTEND TECHNICAL AND SUB COMMITTEE METINGS TO SORT OUT TECHNICAL AND COMMERCIAL ISSUES, APPROVAL AND PROCEDURAL BREACHES

PARTICIPATE AS ALLOCATED ON TECHNICAL AUDITS OF PROJECTS AND CORROSSION MATTERS.

ENHANCEMENT OF PLANT MONITORING AND MAJOR EQUIPMENT INVENTORY SPREADSHEETS DOCUMENTATION AT THE END OF EACH FIELD VISIT AND FIELD VISIT ROTA ADHERANCE AND MANAGE EQUIPMENT INVENTORY DATA BASE FOR REFERENCES.

18. 12/10/01- 20/05/04 PROJECT ENGINEER/SITE REPRESENTAIVE SUPERVISION OF FORCADOS YOKRI GAS PLANT (FYIP) FROM DEN HAAG TO FORCADOS WARRI NIGERIA FOR SHELL. SHELL DEVELOPMENT COMPANY. Page 5 of 7

19. 07/06/01 03/06/02 PROJECT EGINEER SUPERVISING DETAILED ENGINEERING WORKS FOR ESCRAVOS GASTO LIQUID PLANT FOR CHEVRON WITH

FORSTEWHEELER IN READING ENGLAND, UK.

20. 13/09/02- 12/03/04 PROJECT ENGINEER FOR TEXACO OVERSEAS AGBAMI DEEP OFFSHORE PROJECT IN HOUSTON.

21. 07/03/04-02/06/08 PROJECT ENGINEER FOR ESCRAVOS GAS GATHERING AND PROCESSING AND COMPRESSION PLATFORM (GGCP) PROJECT FOR CHEVRON AND ATTENDING INTERCONNECTING PIPELINES BY HIYUNDAI HEAVY INDUSTRIES (HHI), FORSTER WHEELER, WILBROS ETC. FOR CHEVRONS FROM HOUSTON USA, TO SEOUL KOREA TO ESCRAVOS NIGERIA UPFRADING THE PLANT FROM 285MMSCF/D TO 600MMSCF/D PROCESSING CENTER EGP 3A AND 3B. INCLUDING THE OFFSHORE PLATFOR, 24", 12" ETC PIPELINE INTERLINKS 23. 14/06/80-20/05/2010 SITE REPRESENTATAIVE SEPERVISING USAN SUBSEA PRODUCTION SYSYTEMS DETAILED ENGINEERING, CONSTRUCTION OF FACILITY MANIFOLDS, CHRISMASS TREES, WELHEAD, UMBILICALS JUJMPERS ETC. WITH CAMERON LTD IN EGHAM, SURREY UK AND WARRI AND PORT HARCOURT NIGERIS INCLDING THE ROV, IWOCS IN LEEDS, CONTROLS AT CELLE IN GERMANY, XT IN CIMS -(COST $1.2BN) MALAYSIA, HOUSTON FOR THE CONNECTION SYSTEMS ETC.

24. 01/01/11 - 15/10/14 PROJECT ENGINEER ASSA NORTH (ANOS) GAS DEVELOPMENT 25. 01/08/12 -15/10/2014 PROJECT ENGINEER EXXONMOBIL IPP & SHELL'S SOKU GAS UPGRADE

26. PETROLEUM PRODUCT MARKETING OF: AGO, D6, ATK –JET- MARKETING WITH NORTHBIDGE ERNEGY USA – 02/2020 – 01/09/2021 27. CONSULTANT TO AKEA AUTOMATIONS SOLUTIONS –IN HOUSTON TX. FROM 03/2021 - 11/04/2021

28. APPOINTMENT SETTER- MOMENTUM SOLAR, HOUSTON, TEXAS- USA FROM 03/14/2022 TO DATE (04/01/2022)

13. COMMENDATION LETTER

• BRAVERY AND OUTSTANDING CONTRIBUTION IN FIRE FIGHTING AT WARRI FCC IN AUGUST 1987

• OUTSTANDING PERFORMANCE AND CONTRIBUTION TO ESCRAVOS GAS PLANT FEED AT PARSONS ENG. AND CHEMICAL COMPANY IN HOUSTON TAXES FOR EGP 3A. ONSHORE BY CHEVRONTEXACO IN 2002.

14. HOBBIES

• LISTENING TO OLD MUSIC (OLD SKOOL)

• FOOTBALL (SOCCER) WATCHING

• MOVIES WATCHING

• READING NOVELS AND BIBLE

15. REFEREES

Page 6 of 7

• ENGR. DENNIS AJULU, GED, REFINING & PETROCHEMICALS - NNPC TOWER, ABUJA

• PROF. (DR) JOE EZIGBO, MANAGING DIRECTOR, FALCONGAZ NIG LTD, LEKKI – LAGOS Page 7 of 7



Contact this candidate