Post Job Free

Resume

Sign in

Industrial Electrician Electrical System

Location:
Al Dafna, Qatar
Salary:
200000 Indian ripees
Posted:
August 07, 2023

Contact this candidate

Resume:

MUSAMMIL KUNHIPURAYIL

Industrial Electrician

PERSONAL INFORMATION

ADRESS:

DARUL FALAH

KOTTOOR, KADACHIRA

KANNUR

KERALA – 670621

PHONE : 807-***-****

E MAIL : adyrgu@r.postjobfree.com

SKILLS :

Analyzing blue print

Programmable logic controllers

Knowledge of safety regulation

Construction experience

Working odd hours

Team work

Accuracy

Repairing electrical system

KEY ACHIEVEMENT:

Attended level 1 course in health and safety at work place

LANGUAGES:

English

Hindi

Arabic

Malayalam

Dependeable, detail-oriented Industrial Electrician with 10+ years experience with construction and Industrial electrical installations. Substantial knowledge of industrial control, circuit management, and power distribution.

EXPERIENCE

2016 October – Present - Structural Qatar LL

Work involved reading blue prints and review of electrical lay

Out for new and existing plant construction.

Assisted in planning repairs and installations.

Evaluated through inspection electrical equipment to ensure efficient operation to national electric code.

2014 May – 2016August - UCC Urbacone Construction Company

Maintained prepared facility lighting and electrical system

Implimented electrical control and programming improvement to existing high speed production lines.

2011June – 2014 April - CDC – TAKENAKA JV, Qatar

Built electrical panels and was involved in layout, installation programming and debug of process improvements.

Responsible for the termination of power panels both AC and DC voltage sources as well as the termination of the junction boxes, PLC Cabinets, distribution panels, motors, MCC Gears and field instruments.

Managed a small crew in the completion of well sites.

2010February-2011May - QATALUM, Qatar

Cable tray : experience installing cable tray in varying sizes standards for bonding, grounding and expansion were strictly followed.

Wire pulling : utilized an interconnect list to successfully pull thousands of feet of wire in varying sizes.

Blue print utilization : followed blue prints to successfully run conduit, install fixtures and build panel support.

2009January- 2010January - PANCELTICA, Qatar

Worked on belt conveyor system and packaging machine, AC/DC drives and motors

Tested and maintain fire fighting system and emergency lighting.

EDUCATION

1999 – 2001 –KERALA STATE HIGHER SECONDARY EXAMINATION BOARD

PDC PASSED

DECLARATION

I hereby declare that all the information mentioned above is true to the best of my knowledge.

Place : Kannur Yours Sincerely

Date : MUSAMMIL KUNHIPURAYIL



Contact this candidate