ALEX R. SALINDATO JR.
North myrtle beach
South carolina
29582
C.P# +1-843-***-****
E-mail adyqhr@r.postjobfree.com
OBJECTIVES:
Seeking for a position in the field of electrical where I could perform to develop in all but not limited to my experiences and qualifications while contributing to the success of the c ompany.
PERSONAL INFORMATION:
Permanent Address : Alex R. Salindato Jr.
3701 south ocean boulevard 207 north myrtle be
ach south carolina
Cel. No. +1-843-***-****
Date of Birth : July 27, 1971
Place of Birth : Libis, Talisay
Caloocan City, Philippines
Civil Status : Married
Nationality : Filipino
Religion : Christian
EDUCATIONAL BACKGROUND
College : BATAAN NATIONAL SCHOOL OF ARTS&
TRADE
Bachelor of Science in Industrial Technology
Balanga, Bataan
High School : BATAAN NATIONAL SCHOOL FOR FILIPINO
CRAFTSMEN
Oraani,Bataan
Elementary : ORANI NORTH ELEMENTARY SCHOOL
Orani, Bataan
Vocational :NATIONAL MANPOWER AND YOUTH COUNCIL
Methodist Orani, Bataan
SEMINAR / TRAININGS:
ARAMCO K.S.A : Work Permit Receiver/ Safety Procedures BECHT EL : P.P.E Safety Training & Electrical safety Rescue EMPLOYMENT EXPERIENCE :
POSITION DESIRE: Charge hand electrician technician WORK EXPERIENCE March 7 2018
March 18,2019 ELECTRICAL FOREMAN
JUNTEE PHILIPPINES INC.
G/F UNIT 108 ESJCENTRE BURGOS ST.BRGY.
VILLAMONTE BACOLOD CITY
6100 NEGROS OCC.PHILIPPINES
Estimate material to be used and taking off materials list, Report daily progress.
installations of conduit pipe, cable tray.
including cable pulling and termination of control cable and Medium voltage cables.
Mounting switchgear panel and primary transformer
involving allignment and erection of busduct bar from switchgear panel to transformer.
Aug.10,2018 ELECTRICIAN
TRUE NORTH MANUFACTURING SERVICES
CORPIRATION
Work as a leadman electrical maintenance and estimating materials and taking off materials list plus lay outing and installation of conduit and cable tray for ligthing and motors including cable and wire terminations.. August 05,2016 at October 04,2017
ELECTRICIAN
TRPLE J SAIPAN,INC.
P.O BOX 500487
SAIPAN MP 96950
Working as a maintenance in sandy beach homes building as well as in the const ruction site.Lay outing and installing electrical conduit,light ing fixtures,circuit breaker,convenience outlet and terminat ion of cables.Including carpentry and assisting in mazon wo rk.
February 8, 2014- at Aug.2014
L/M ELECTRICAL TECHNICIAN
RMP-2 PETRON
SUNGJUN INTL. PHIL.
LAMAO, BATAAN
Installation of lighting fixture, cable glanding and termination, mounting instrument tra nsmitter and cable pulling. Perform pre-commissioning including motor solo run test. Report j ob accomplished and taking off material list.mounting air con window and split type,refill pre on and termination of control cable for H.V.A.C
December 2012- August 2013 ELECTRICAL TECHNICIAN
RMP2-PETRON
BUMJIN INTL. PHILIPPINES
B.O DUALE LIMAY
BATAAN
Repairing welding machines as well as Tig torch welding. Monitoring generator set as well as maintaining of good condition of it and repair. Install surveilance cameras, and repairing grinder machine, drill machine and others. Installing lighting fixture and power sup plyfrom generators to power distribution board.
and repairing of vevel and cutting machine for pipe.lay out individual supply for air conditio n and install split type air condition.
September 02,2012- November 02,2012 ELECTRICAL TECHNICIAN Kentz Company Papua, New Guinea (PNG)
• Cable glanding and cable termination, installation of cable trays, pulling cable and panel installations.
• Layouting cable grounding
Layouting Main Grid Cable and Welding and Fabricating support. Cable Glanding and Cable termination pulling cable, Loop checking and Insulation resistance test Working as a Leadman.
March 13, 2010 – September 20, 2010 BECHTEL COMPANY LNG, SOYO ANGOLA
AFRICA.
CHARGE HAND ELECTRICIAN
Cable glanding and cable termination, installation of cable trays, pulling cable and pan el installations.
November 20, 2008 – May 14, 2009 IMPREGILO LIDCO
GENERAL CONTRACTING COMPANY
HAY AL ANDALUS, AHMED
TAMIMI ST. P.O. BOX 2243
TRIPOLI, LIBYA
General maintenance, lay-outing lightning and power circuit. Maintaining the camp sa fe and properly including the plumbing works, installing air condition indoors and split unit. Lay outing LAN cable for communication and do some carpentry works. July 2007 – April 2008 SOHAR ALUMINUM SMELTER
PROJECT
BECHTEL COMPANY LLC
SULTANATE OF OMAN
CHANRGE HA ELECTRICIAN
Taking off materials needed and report completed works. Assigned in PRE OPS com missioning in GIS and doing cable termination. Perform and other duties and function as per order from supervisor Alignment of all GIS accessories. Install capacitor Bank, Post insulator
, Surge Arrester for Harmonic Filter.
May 2006 – September 2006 BECHTEL / PFD
TENGIZ, KAZAKHSTAN
OIL REFINERY
Worked as acting Foreman in electrical works including cable glanding and cable term ination as well as cable pulling.
September 17, 2003 – March 03, 2004 BRUNEL INT’L. S.E.S. PTE LTD. BRUNEI / CLOUGH
PNG OIL REFINERY
NAPA-NAPA, PAPUA NEW GUINEA
Mounting of aligning of switch gear panel and erecting of bus duct from switch gear t o panel thru transformer. Working as a Leadman for cable pulling and cable glanding plus ter mination.
Worked in a commissioning for motor test, arranging document for electrical and assis ting QA / QC paper works. Doing as built as per construction on site in electrical had been m odified, some wiring termination.
January 12, 2003 – June 12, 2003 CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY (S.A.L)
CHIYODA CAMP STATE OF QATAR
Worked as charged hand electrician in cable glanding and pulling cable as well as cabl e termination. Taking off materials for electrical fittings and others. Report completed electric al installation.
Sept. 27, 1999 – June 12, 2002 CONSOLIDATED CONSTRACTORS INTERNATIONAL COMPANY (S.A.L)
P.O. BOX 70193
HABSHAN, ABUDHABI, UAE
Mounting switch gear panel and termination of cables. Loop-checking and meggering cables including welding and fabricating support, injecting current in switch gear breaker thro ugh motor controls. Lay-outing conduit, cable tray and support. March 18, 1997 – Jan. 11, 1998 ELECTRICIAN
CONSOLIDATED CONSTRACTORS
COMPANY C.C.C.
P.O BOX 34
DHARAN AIRPORT K.S.A.
July 15, 1999 – July 11, 1999 ELECTRICIAN LEADMAN
CONSOLIDATED CONSTRACTORS CO.
SAUDI FERTILIZERS CO. (SAFCO)
C.C.C. P.O. BOX 10952
JUBALIA31961
K.S.A
Had been an electrical charge hand SAFCO Project, Supervision and installation of co nduit. Cable tray and fire alarm panel represent. C.C.C. in electrical construction and complet ed electrical installation. Taking off materials needed and report electrical installation. A term leader in lay outing and termination cables.
CONSTRUCTION SPECIALIST FOR
SAUDI ARAMCO (R.T.R.U.P)
UPGRADINGPROJECT/PORT CONTROL
COMMUNICATION PROJECT DIVISION
• Installing electrical panel board, lay-outing conduit, cable tray for lighting and motors.
• Assisting in electrical work and report completed work.
• Fabricating and welding support for panel board and others.
• A team leader in cable pulling, meggering and testing motors and termination of cables.
• Cable glanding and termination.
• Cable termination, loop checking, modification testing and commissioning.
• Installation of MOV.
• Repairs malfunctions by such methods as replacing burned out elements, fuses and replacing defective wirings, cleaning and repairing motors.
• Test electrical equipment, such as motors, heaters and controls for safety and efficiency, using standards test equipment and by observing functions.
• Mounting of switchgear panel, termination of control.
• Locates and determines malfunctions using test equipment. Jan. 15, 1996 – Oct. 17, 1996 ELECTRICIAN LEADMAN
PETRON / FAFCO
SAUDI ELECTRO-MECHANICAL
CONSTRUCTION CO., LTD.
P.O. BOX 806
DAMMAN 31421
KINGDOM OF SAUDI ARABIA
ONSHORE / OFFSHORE
ELECTRICIAN LEADMAN
SAUDI ARAMCO N.G.L. REFINERY
UP-GRADING PROJECT
AL-SINAIYAH, YANBU
KINGDOM OF SAUDI ARABIA
• Has been assigned to be a permit receiver in all aspect of work.
• Upgrading and mounting analyzer cabinet and installation of instrument tubing.
• Installing of conduit, fire alarm equipment, panel board and loop-checking and meggering including termination of electrical and instrument cable and glanding cable. June 05, 1994 – Jan. 14, 1996 ELECTRICIAN LEADMAN
PETCON / FAFCO
P.O. BOX 806
DAMMAM 31421
KINGDOM OF SAUDI ARABIA
ONSHORE / OFFSHORE
SAFANIYA GOSP 4
• Has been working in Safaniya Gosp4 Offshore and Onshore.
• Mounting switch gear panel, pulling and termination of cables, commissioning and test motors.
• Installation and termination of smoke detectors including lightning.
• Lay outing rigid steel condiut with PVC coated.
• Installing cable tray.
June 1994 – May 31, 1995 ELECTRICIAN
PETCON / FAFCO
P.O. BOX 806
DAMMAM 31421
KINGDOM OF SAUDI ARABIA
IBN HAYYAN, PETROKEMYA
JUBAIL, K.S.A.
• Maintaining workshop including lightning, outlet and repairing drill and grinder machine.
•
Feb. 14, 1993 – May 1993 ELECTRICIAN
PETRON / FAFCO
P.O. BOX 806
DAMMAM 31421
KINGDOM OF SAUDI ARABIA
• Install, maintain and repair equipment needed for electrical such as generator, welding machine, drill and grinder.
• Assist on commission and programming of all security and fire alarm.
• Lay-outing, pulling dressing and termination of electrical cables. Oct. 11, 1992 – Feb. 1993 ELECTRICIAN
PETCON / FAFCO
P.O. BOX 806
DAMMAM 31421
KINGDOM OF SAUDI ARABIA
HADDED SAUDI IRON
STEEL PLANT
JUBAIL, K.S.A
• Has been assigned to work for Daniele Co. Ltd., the work includes mounting and alignment of the motors. Installation and termination of fire alarm devices such as fire, smoke and heat detector.
• Assist on commissioning and loop=checking including maintenance.
• Lay-outing conduit and cable fabricating support. Sept. 1992 – Oct. 1992 ELECTRICIAN
PETCON / FAFCO
P.O. BOX 806
DAMMAM 31421
KINGDOM OF SAUDI ARABIA
• General Maintenance: lay-outing some additional lightning pole and maintaining the compound safe and properly including plumbing works.
• Lay-outing conduit, such as PVC, rigid steel galvanized, electrical metallic tubing
(E.M.T.) and rigid steel PVC coated.
• Works project documentation in preparation of the installation and maintain accuracy record of all works done.
1990 – 1991 ELECTRICIAN
D.J. ROQUE CONSTRUCTION CO.
LIMAY BATAAN REFINERY
CORP. (B.R.C.)
• Assisting in electrical work, pulling, dressing and termination of cable.
• Installation of lightning fixtures, magnetic switch selector with Jog-R. CHARACTER REFERENCES :
Mr.Mario Valentino
Const.Ops.Mgr./Sr.Supt.
Triple J Saipan Inc.
Email: adyqhr@r.postjobfree.com
Tel.# +1-670-***-****
Cp# +1-670-***-****
Mike Routledge
Elect.Proj.Mgr.
Clough Pty. Ltd.
Papua New Guinea
Email: adyqhr@r.postjobfree.com
Tel.# +61-417-***-***
I hereby certify that the above information is true and correct to the best of my knowledge and belief. Alex R. Salindato Jr.