FREDIE RICK BURCE PAULITE
Mobile # +974-****-****
E-mail add: *********@*****.***
Position: ARCHITECT
PROFILE SUMMARY
A Licensed Architect in the Philippines and Registered in Engineering and Consulting Offices Accreditation Committee (MMUP/UPDA) Doha Qatar, with 19 years of Diversified Work Experience in Design, Space Planning, Drafting, Project Coordination and Construction Supervision. Proficient in AutoCAD, have knowledge in 3D Max rendering, Sketch up modelling, and basic Revit Architecture and Microsoft Office.
PROFESSIONAL QUALIFICATION:
Degree: Bachelor of Science in Architecture
School: Technological Institute of the Philippines Date Graduated: May 2002
Board Passer: Foreign Licensure Examination for Architects Conducted in: Doha, Qatar
Date: December 9-10, 2011
Affiliation: MMUP / UPDA (Registered)
UAPQaC –(United Architects of the Philippines-Qatar Chapter Member) WORK EXPERIENCE:
COMPANY IMAR TRADING AND CONTRACTING
POSITION ARCHITECT
ADDRESS Doha, Qatar
INCLUSIVE DATE JULY 2017- Present
PROJECT INVOLVED NATIONAL MUSEUM OF QATAR
WALDORF ASTORIA HOTEL (KUWAIT PROJECT)
DOHA OASIS
JOB DESCRIPTION
Responsible for coordination of MEP Drawing in relation to Architectural RCP Shop Drawing.
In charge in preparation of Interior Fit-out details and shop drawings
Production of special/spot details needed in the project site for construction.
Conduct Periodic site inspections to resolved design issues of project on progress construction.
Reviewing of IFC drawings, material submittals in case of discrepancies and conflict for raising RFI purposes.
Responsible in preparation of Architectural Shop drawings
Preparation of As built Plan.
Implementation of CAD standards of every drawing accomplished, for ease of management of all files. COMPANY SALAM INDUSTRIES
POSITION FIT-OUT DESIGNER
ADDRESS Doha, Qatar
INCLUSIVE DATE October 2016- July 2017
PROJECT INVOLVED VERSUS VERSACE (MOQ)
FAUCHON PARIS (DFC)
LEXUS SHOWROOM DOHA (C-Ring Road)
JOB DESCRIPTION
Assist the Architect in receiving sample materials from different suppliers as requested and required by the project.
Assist the architect in drawing proposal for revision of existing design drawing that suit for actual site conditions.
In charge in preparation of Interior Fit-out details and shop drawings
Production of special/spot details needed in the project site for construction.
Responsible in preparation of Architectural Shop drawings
Preparation of As built Plan.
COMPANY URBACON TRADING AND CONTRACTING
POSITION SENIOR ARCHITECTURAL DRAFTSMAN
ADDRESS Doha, Qatar
INCLUSIVE DATE September 2015 – October 2016
PROJECT INVOLVED Mall of Qatar
JOB DESCRIPTION
Assist the Architect in coordination of architectural drawings in relation to the other allied services drawing and raised further information in case of discrepancies or conflicts
Periodic site inspections to resolved design issues of project on progress construction.
Coordination and updating of Amended Architectural drawing by the Architect.
Responsible for coordination of MEP Drawing in relation to Architectural RCP Shop Drawing.
Preparation of Railing and Balustrades shop drawings
Preparation of blockworks and Toilet details
In charge in Updating of Atriums coordination drawings
In charge in the update of drawings of Ramp and Tunnel, package drawing.
COMPANY AL JABER ENGINEERING
POSITION MEP DRAFTSMAN
ADDRESS Doha, Qatar
INCLUSIVE DATE September 2014 – June 30, 2015
PROJECT INVOLVED West Bay District Cooling Plant No. 3 JOB DESCRIPTION
Responsible for coordination of MEP Drawing in relation to structural and Architectural Drawing
In charge of the production of Electrical Shop Drawings.
In charge of the production of MEP Builder’s Work Drawings
Site inspection for progress construction report. COMPANY COLLAGE GROUP INFRASTRUCTURE PVT. LTD
POSITION ASSISTANT ARCHITECT
ADDRESS Plot No. 30 Sector 32 Gurgaon Haryana, India INCLUSIVE DATE September 2012 – June 2014
PROJECT INVOLVED Bhopal Group Housing Project
Amritsar Group Housing Project
JOB DESCRIPTION
Assist the Senior Architect for Conceptualization of design
Assist the Architect in providing viable solutions to resolve design related discrepancies thru RFIs
Responsible for coordination of Architectural Drawing in relation to structural and other allied services drawing and raise further information in case of conflicts or discrepancies
Attendance of monthly and weekly meeting with the Architectural and Construction Team for Coordination and monitoring of work schedules
Conduct Periodic Site Inspection for construction progress report and to resolve design issues of projects on-progress construction.
Attendance of workshop meetings with project engineering team and Subcontractors
Provide drawing for various stage of the project from concept to implementation.
Providing Shop Drawing plans and details for Fabrication request.
Implementation of CAD standards of every drawing accomplished, for ease of management of all files
In charge of the supervision of my subordinates in production of design development plans and in preparation of Construction drawings
.
COMPANY SOJV -SKY ORYX JOINTVENTURE (TAISEI CORP & TAV) POSITION MEP AUTOCAD OPERATOR / COORDINATOR
ADDRESS P.O Box # 55873 Doha, Qatar
INCLUSIVE DATE Feb 2011-December 2011
PROJECT INVOLVED New Doha International Airport
Location: Doha, Qatar
JOB DESCRIPTION
Coordinate with the sub-contractors regarding their devices and latest drawings that will incorporate in updating the shop drawings.
Conduct site inspection for construction progress report to ensure the implementation of all relevant drawings.
Responsible in preparation of MEP coordination drawing of all ceiling mounted devices
Responsible for coordination of MEP Drawing in relation to structural and architectural drawing and raise further information in case of conflicts or discrepancies
Implementation of CAD standards of every drawing accomplished, for ease of management of all files
COMPANY AL HABTOOR LEIGHTON GROUP
POSITION ARCH’L DRAUGHTSMAN / SITE SUPERVISOR
ADDRESS P.O Box # 320 Dubai UAE
INCLUSIVE DATE November 2007 – August 2010
PROJECT INVOLVED St. Regis Hotel
Location: Saadiyat Island and Beach Development Abu Dhabi UAE Racedays Hotel
Location: Yas Island Abu Dhabi UAE
JOB DESCRIPTION
Conduct Site Inspection for updating the site work progress and ensure the implementation of all relevant drawings.
Attendance of workshop meetings with project engineering team and Subcontractor.
Attendance of monthly and weekly meeting with the Architectural and Construction Team for Coordination and monitoring of work schedules
Coordinates architectural and construction drawings to other disciplines to carry out the whole design based on consultants and site condition.
Responsible for coordination of structural and architectural plan in case of discrepancies and conflict for raising RFI purposes
Production of architectural shop drawings that will use for construction.
Prepares As Built Plan Drawings.
COMPANY ADOBE BUILDING SYSTEMS, INC.
POSITION CAD OPERATOR / PROJECT COORDINATOR
ADDRESS 19 Purdue st, Northeast Greenhills, San Juan Metro Manila. Philippines
INCLUSIVE DATE May 2004 – November 2007
PROJECT INVOLVED Shakey’s - Rada Makati Phils
Cowboy Grilles – Ortigas Ext. Pasig Phils.
JOB DESCRIPTION
Conduct pre-bid meeting with clients and attendance of workshop meeting with subcontractor
Conduct site inspections for construction progress report.
Coordinates architectural and construction drawings to other disciplines to carry out the whole design based on consultants and site condition.
Production of architectural shop drawings for construction.
Prepares As Built Plans of Mechanical, Plumbing, Fire Protection and Electrical Layout.
In charge for the preparation of the working drawings for construction.
Production of Archl detail drawings, Structural, Plumbing and Electrical Layout.
Production of drawings for bidding, for permit for construction and As Built.
FREE LANCE ARCHITECT
PROJECT HANDLED
Scope: Design and Build
Title: Two storey Residence with attic
Location: Blk.22-A,lot 2 Greenland New town Executive subd. Brgy. Ampid San Mateo Rizal, Philippines
Owner: Jennete Almonicar
Date: March 2003 – December 2003
hereby certify that all information given above is true and correct. Very truly yours,
Fredie Rick B. Paulite