Post Job Free

Resume

Sign in

Construction stuchuter site supervisor

Location:
Erbank, Odisha, India
Salary:
45000
Posted:
August 03, 2023

Contact this candidate

Resume:

SKYPEID:adypd1@r.postjobfree.com

POSTIO: MECHANICALENGINEER /PIPING,

Dear Sir/ Madam,

I am DE-(Mechanical) my Experience find my attached Resume& support document for the position of Engineer sum Mech &Piping-supervisor,Fabrication-Supervisor & Mech-Maintenance Supervisor & Workshop Fabrication, Turnaround maintenance & position which relates strongly to my experience in Engineering & mechanical maintenance, Shut-Term,Shut-Down, construction, since 1988 to 2023in Abroad (16years,) As Construction Project Site-Supervisor with many organising Reputed Company & m/s contractor Gulf Construction Country, I believe I meet all the essential criteria of the positions. Highlights of experience and demonstrated talent I would bring to your organisation include:

Responsibilities Safe,Safety, & Quality, after the overall Fabrication& erection job at workshop, S/D work activity, Execution work of erection Plant piping, Utility Piping, underground pipeline & duct line.& all other mechanical & piping work,

Handling all types of manpower at site and looking with safety achievements& safety Rule`s Regulation Obey & Fast all of QSHE 100% safe Safety, Ability to install on-site and offsite mechanical equipment.

I am now looking to take up roles in Project Management and Consultancy in Piping, Mechanical of Construction in companies across the Oil& Gas, Oil-Refinery, Steel, Power Plant, Substations, Infrastructure Utility sector. I am capable of problem solving in various fields .Excellent presentation skills make me able to deliver information properly. I am able to speak in English, Hindi, Urdu Arabic. I am keen to join your firm due to its leading position in the industry, great organizational culture, spirit of innovation, professionalism that characterizes your firm and its employ. I attached my resume along this resume to describe my details experience .I hope that I will get an opportunity to meet you for interview session. You can contact to me +943******* or send me Email -:adypd1@r.postjobfree.com /safiullah.shaikh080@gmail

Thank you

For considering my application.

OBJECTIVE.

Over all India & a broad’s 34 year`s ( gulf 16years ) of experience in Oil &Gas, Refinery,Power-Energy, Fertilizer & Aluminium Refinery,chemical, Seeking a challenging and resulted oriented position in, Mach-Piping supervisor, where effectively utilize professional experience and skills. Seeking assignments in FABRICATION, Erection, Long-Term &Shut -Term/Shut-Down & Hydro-Testing, Commissioning, with a reputed organization.

EXECUTIVE SUMMARY:

A competent professional with nearly Latest years of experience in piping, fabrication and erection & Currently working As Piping supervisor Construction, Proficient in executing various assignments by stage wise execution of the job with quality compliances and standards as per the time schedule.

EDUCATION:

DEGREE

BOARD/UNIVERSITY

SPECIALISATION

MARK

YEAROFPASSIG

DIPLOMA(GDE)

EIMR&S

MECHANICAL

67.5 %

2012

HSC

CBSE-ODISHA

COMPALTMENT

3rd

1986

PASSPORT DETAILD,

Passport No- :Z3150918, Date of Issue -:23/03/2015

Date of Expire -; 22/03/2025, Place of Issue -BHUBANESWAR

PROFESSIONAL SKILLS:.

1.- Basic knowledge in MS-Ward Office,

2- MS-Excel, Window Operating,, DTP & Text,Power Point, Photo shop, Pdf, Data Enterring,Etc

PERSONAL INFORMATION:

NAME - : SAFIULLAH SHAIKH

Father name-:.Shaikh Hamidullah

At- Sanakujhala, Po- Kujahala

Dist-jajpur, Pin-755017,

Odisha- (INDIA)

D.O.B : 01/03/1969

CELL US :-+91-943*******/809-***-****,

( Thanking you.)

Sincerely,

Safiullahshaikh

Enclosure: Resume

EMPLOYMENTHISTORY(SINC1987TO2023EXPERIENCE ),,

QCON ENGINEER &CONTRACTOR W.L.L(QATAR),

Name of Organise- : NGL/ DOLPHINE ENERGY

Duration -: 21/Jan/2023,To 02-Mar -2022,

Position -: Mech-Supervisor

Responsibility-: I am mechanical Supervisor in DOLPHINE ENERGY Project, Fire Zon-14A/B,S/D work as in under Save,Safety, Quality & DOLPHINE Piping work,& Mechanical work, Steam Drum,118-1D-09320,Air Recevier, Finfan,118-1e-09310,Exchanger,118-1E0310& 118-1E-0410, 2 inch, PSV,-10 No`s, 4 inch-Control Valve-02 No`s 12 inch Control Valve,-02 No`s, work.

QCON ENGINEER &CONTRACTOR W.L.L(QATAR),

Name of Organise- : NGL/ DOLPHINE ENERGY

Duration -: 17/Nov/2021,To 11-Mar -2022,

Position -: Mech, Piping Supervisor

Responsibility-: I am mechanical Piping Supervisor in NGL& DOLPHINE ENERGY work as in under Save,Safety, Quality & PTW/HSE follow of safety rule's & regulation as Per NGL(Unite-4) & DOLPHINE (Unite -5&6)Project, Utilitypiping, Drafting Isometric,Fabrication & Erection, 3/4,Steam Tracing new Header with line work fabrication & installation, 1200mm dia, 5 mtr cutting & re-placement,

G S Construction Arabia Co.Ltd

Name of Organise-: Petro Rabig(Jeddha )

Duration -: 18/Jan /2020 to till 30/04/2020

Position-: Piping Supervisor,

Responsibility -: My Responsibility & Ability have Safe, Safety &Quality, My position was Piping supervisor for company of GSCA and client of ( PRC RABIGH-TA,S/D-2020) as a PIPING SUPERVISOR, We are Arranging, Preparation, Martials, Installation, for Job Location consulting with operator, to processing Isolations, Blinding,Lock-Out,& Tag-out system before start S/D, with-out Permit no work, & following of safety Rule’s & Regulation, Daily TBT, & Golden Rules Activity, Good &Quality work as per our schedule how to completion of S/D, With-Out any Fatality, as per schedule,

QCON ENGINEER &CONTRACTOR W.L.L(QATAR),

Name of Organise - Ras Gas,

Duration -: 22/Mar/2019,

To 21-Aprl -2019,

Position -: Mech-Supervisor

Responsibility-As a mechanical Supervisor in Q-Gas SouthAl- Khor,RasLaffanproject,S/D in Tran 3 & 4,22 day's work of Execution Lead team work as in under of 100%Hse& follow of safety rule's & regulation as Ras Gas safe& quality work .

DESCON ENGINEER,

Name of Organization:ADNOC.GASCO.

Duration, : 15/Jan/2019 to 14/02/2019,

POSITION :PIPING -SUPERVISOR.

Adnoc Gasco . Abu Dhabi, Ruwais gas project, Train-3 as mechanical S/D’ 22 days,my job responsibilities have all of mechanical work. Like Column.Exchanger,Bonddle tube,Lp steam Exchanger,Hp Steam Exchanger, Hydro testing, Sulphur Drum, know-out Column. Mechanical cleaning,Sure Watercleaning Tank. Spading, D-spading.& as night shift lead man supervisor position.

DOPET-QATAR

Name of organisation: Qatar gas

Company : Dopet

Consultant-JVGC

Duration: 22/09/2018 to Nov -12 -2018,

My job responsibilities of Execution team on Tran 04,13 Exchanger replacement. New installation for s/d work. Was leading manpower handling of piping spool.removing.spading.&de spading in achievement of save,safety& Quality,Qatar gas rules & regulations follow Of 100% HSC & LSR .

DESCON ENGINEERING

●NAME OF ORGANISATION : ADNOC, GASCO-RUWAIS,

●COMPANY : DESCON ENGINEERING

●CONSULTANT : JGC-TECHNOMENT,

●DURATION : 20/FEB/2018 TO 02/MAY/2018,

●RESPONSIBILIT:We work Execution team on Tran 1 & 2 in the scheduled of work i am looking as piping supervisor after the overall Fabrication& erection, cutting, dismantling, job at site work, pipe Execute Fabrication installation of new pipe Installation & other all piping & mechanical work during, furnace, piping, looking with safety, Achievements. Ability to install on-site and offsite piping& mechanical equipment, Blinding, De-blinding for preparation for Hydro-Test,

FCC ELECTRO MECHANICA L,L.L.C

●NAME OF ORGANISATION : Riyadh Metro,

●COMPANY : FCCELECTROMECHANICAL

● CONSULTANT : Fast Metro Riyadh

●DURATION : 26/10/2016 TO 11/01/2017

Responsibility: As a Mech-Forman of MEP metro project, of fire fitting line, chilled water line,fabrication &Erection,& civil insftucture,wall slew& Nozzle Fabrication,Installation for the project of work MEP Civil Inftructural Metro Project Riyadh, in Saudi Arabia,

QCON ENGIEERING & CONSTRUCTION W.L.L (QATQR)

●NAME OF ORGANISATION : RAS GAS (RLIC) AL-KHORE,

●COMPANY : QCON ENGINEERING&CONSTRUCTION WLL LTD

●CONSULTANT : JGC-KELL LOG JOINT VEBTURE,

●DURATION : 02/FEB/2016 TO 01/MAY/2016,

● RESPONSIBILIT :As a piping supervisor, include looking after the overall Fabrication& erection, cutting, dismantling, job at site work 18 inch Dia to inch dia pipe Execute Fabrication installation of new pipe & other all piping & mechanical work during,Handling all types of manpower at site and looking with safety achievements. Ability to install on-site and offsite piping& mechanical equipment, Blinding, De-blinding for preparation for Hydro-Test and

Performed all QC/Quality Assurance procedures PWHT.MT.ESSR.DPT,NDT,other activity and inspected and maintained all pipe`s &equipment process in facility.

ETIMAAD ENGINEERING LTD (QATAR)

●NAME OF ORGANISATION : RAS LA-FAN ( AL-KHORE, (QATAR)

●COMPANY : ETIMAAD ENGINEERING LTD (QATAR)

●CONSULTANT : T E C H N I P, C O N S U L T A N CY I N T E R N A T I O N A L W. L .L . C

●DURATION : 01-Jan-2015 To 30-Aprl-2015

●RESPONSIBILIT : Self was looking as a PIPING-SUPERVISOR, (Basically salary-5100 QR, Per-Month ) Pre- fabrication & Erection of 24 dia SS-TP 321,Class-60sch-piping,Exesting unite working since 01-jan-2015 to 30-April-2015 as a shut-term work, & also fully involved in all activities to client for preparation of job procedures of QC,& shop drawing activities,

●L&T INT ECC DIVISION

● NAMEORGANISATION : EMRITES ALUMUNIUM PROJECT

●DURATION : 04-June-2013 TO 15-mar-2014,

●CONSULTANT :SNC LAVALINE INTERNATIONAL,& SLII,

●RESPONSIBILITY : As a Post of( PIPING SUPERVISOR), (Basic Salary 4900AED) pre-fabrication and Erection of work like Recycle-cooling Tower U/G, A/G, Hydraulic pipeline, Rack-piping, Furnace piping, ss,cs, etc, cast House PHAGE-2 at ABU-DHABI(UA E).i am also drafting Isometric Drg fo Hydrolic oil line Aproved By SNC Lava line International,& Utility piping,fabrication and erection,

●TRANSFIELD EMDAD SERVICES

●NAME ORGANISATION : GASCO RUWAIS TRAIN-3,

●DURATION : 12ND FEB 2011 TO 3rdAprl2011

●CLIENT : GASCO PROJECT (RUWAIS TRAN-3)

●RESPONSIBILITY: As shutdown work,Post of (Mechanical-Supervisor, Basic WagesAED-4200,+ OT), work 45 days as Gas co project Ruwais Train-3 in Abu Dhabi, Mech-Cleaning internal cleaning,column-internal-tray,exchanger-bundle-tubes,hydro-jettinin,removal &pipeline Hydro-testing & re-blinding work as on shutdown period.

MODERN ENGINEERING WORKS

●NAME ORGANISATION : VIZAG STEEL PLANT, (VKSP)

●DURATION : 28TH SEPT. 2010 TO 31ST JAN 2011

●CLIEN : M/S FIVESTEIN PRO. PVT. LTD.

●RESPONSIBILITY:Mechanical-EngineeringIn-charge, of works,pre-fabrication of pipe& structure, duct, utility line, furnace, SS, CS, Installation of equipment& erection installation etc.

TRANSFILED EMDAD SERVISES

●NAME ORGANISATION : GASCO, RUWAIS,ASAB,TAIN=2

●DURATION : 9TH FEB. 2010 TO 1ST MAR 2010

●CLIENT : GASCO PROJECT

● RESPONSIBILITY: As shutdown work of (Mechanical-supervisor) Basic Wages,4000AED + OT )work 30 days as Gasco Project in Abu-Dhabi,Mech-Cleaning internal Try, Baffle plate,cell filter cleaning column internal tray removal pipe line Hydro Testing & re-blinding work,

●DESCON ENGINEERING LLC.

●NAME ORGANISATION : DAS ISLAND LNG PROJECT

●DURATION : 26TH OCT. 2008 TO 24th NOV. 2008

●CLIENT : ADGAS LNG PROJECT

●RESPONSIBILITY: (Piping-Foreman,Basic wage-per day150+OT ) pre-fabrication,and Erection for shutdown work one month at ADGAS, DAS ISLAND in Abu Dhabi

CONSOLIDATED CONTRACTORS COMPANY W.L.L

●NAME ORGANISATION : JUBIL CEVIRON PROJECT

●DURATION : 11TH SEPT. 2007 TO 24TH MAR 2008

●CLIENT : ETHYLENE JUBAIL SAUDI ARABIA

●CONSULTANT : CEVIRON PHILIPS PROJECTS

●RESPONSIBILITY: (Piping Foreman,Beand-7),Basic-3750SR,+OT)(pre-fabrication and Erection of work like vessel, pipe rack, pipe of C.S./L.T.C.S, Tanks work etc. at Ethylene Gas Project at Saudi Arabia in Jubail.

GALFAR ENGINEERING & CONTRACTING L.L.C.

NAME ORGANISATION : PETROLUMDEVELOPMENT ORGANIATION

●DURATION : 10TH JUNE 2006 TO 11TH MAR2007

●CLIENT : KAUTHER GAS PROJECT OMAN MUSCAT

●CONSULTAN : PETROFACE INTERNATIONAL LTD.

RESPONSIBILITY-MECHANICAL-Supervision,(Basic-325 OR+OT), of work involvement of LTCS CS,PIPING 1.5”Dia to24”Dia,EXPORTAera, LNG Line Pipe& Rack structural

Fabrication,& Erection work etc. Kaouther LNG project, OMAN, MUSCAT

L & T ECC DIVISION

●NAME ORGANISATIO : UNITED & SOCIAL ENGINEERING

●DURATION : 1ST SEPT. 2004 TO 26TH FEB 2005

●POSITION HELD : SITE-. INCHARGE/

● CLIENT : IOCL REFINERY LTD. PANIPAT (HARYANA)

●CONSULTANT : ENGINEERING INIDA LTD.

●RESPONSIBILITY: Fabrication & Erection of piping, Structural steel etc. also fully involved in all activities relating to client for preparation of job procedures of QC shop drawing activities etc. at IOCL Refinery Ltd. Panipat (Haryana),

GUJRAT ELECTRIC CO. LTD.

●NAME ORGANISATION : JAI SOMANATH IRON WORK

●DURATION : 26TH FEB 2003 TO 30TH AUG 2003

●POSITION HELD : PIPING/STURS/SUPERVISOR

●CLIENT : GAS AUTHORITY OF (I) LTD. DHWARAN ANAND, GUJRAT.

●CONSULTANT : MECON (I) LTD.

●RESPONSIBILITY : Worked In-Charging Supervisor for 6 month self was looking after fabrication & Erection of piping, structural steel of terminal. Also fully involved in all activities, &consulting with client for preparatio of job, procedures of QCshop drawing activities etc. at Dhuwaran, Gujarat .GAIL sub-station Terminal work,

LARSEN & TUBRO LTD. ECC DIVISION

●NAME ORGANISATION : M/S NOBLE ENGINEERING WORKS

●DURATION : 7TH JAN., 2002 TO 3RD OCT., 2003

●POSITION HELD : MECH. ENGR. INCHARGE

●CLIENT : L.N.G GUJRAT STATE PETRONET LTD.

●CONSULTANT : CERTIFIED ENGINEERING INTERNATIONAL LTD.

●RESPONSIBILITY : Work involvement was under line LNG pipeline terminals works fabrication, erection QC, installation & international, Equipment instlationLUNCHER,RECIVER, Hydro Testing Commissioning at GPEC, GNFC, BBHT Plant & Videocon (5nos) terminal station of job for LNG pipeline handling of those periods completion of job.

LARSEN & TUBRO LTD. ECC DIVISION

●NAME ORGANISATION : M/S UNITED SOCILA ENGINEERING

●DURATION : 27TH APRIL 1998 TO 16TH MAY 2000

●POSITION HELD : SITE- INCHARGE,

●CLIENT : I.P.C.L DAHEJ (GUJRAT)

●CONSULTANT : TATA ENGINEERING CONSULATANT

RESPONSIBILITY : 90 MW power project, unit 2#45 MW, fabrication Erection, Installation of all round works like WHRSG BOILER, flue can, GTFB IBR, Alloys, CS, LTCS, piping, Storage tank, structural, static Equipment, Child water, Installation hydro testing, commissioning & also QC activities etc. I.P.C.L, Refinery Dhaj Bharuch (Gujarat) compilation of works

LARSEN &TOUBRO ECC CONSTRUCTION GROUP

●NAME ORGANISATION : M/S NOBLE ENGINEERING WORKS

●DURATION : 21ST SEPT. 1991 TO 10TH JAN 1993

●POSITION HELD : SITE SUPERVISOR

●CLIENT : GUJRAT GUADIAN LTD. (ANKLESHWAR, GUJRAT)

●CONSULTANT : ENGINEERING (I) LTD.

●RESPONSIBILITY: Work for construction field of structural, storage tank, Blast furnishes Air-Ducting, fabrication & Erection etc. Ankleshwer, Gujarat G.G.Ltd. Flota Glass Plant.

LARSEN & TOUBRO ECC CONSTRUCTION GROUP

●NAME ORGANISATION : M/S NOBLE ENGINEERING WORKS

●DURATION : 20TH MAY 1990 TO 12TH SEP1991

●POSITION HELD : SITE SUPERVISOR

●CLIENT : O.N.G.C URAN NEW BOMBAY

●CONSULTANCY,:(NIPPON DINNOR JAPAN) ENGINEERING PROJECT (I) LTD.

●RESPONSIBILITY: Supervisor involvement of unit piping, pipe rack structural, fabrication & erection, hydro testing etc. New Bombay Uran completion of Job.

LARSEN & TOUBRO ECC CONSTRUCTION GROUP

●NAME ORGANISATION : M/S NOBLE ENGINEERING WORKS

●DURATION : 13TH MARCH 1988 TO 16TH MAY 1990

●POSITION HELD : SITE SUPERVISOR

●CLIENT : JAWAHARLAL NEHRU PROT TOURST (GNSPT)

●CONSULTANT : ROXON, KORIA, HYUNDAI, ENGINEERING (I) LTD.

●RESPONSIBILITY : Supervisor work involvement of SS conveyor chute structural, fabrication & erection works etc. New Bombay Nava shevaUran.

LARSEN & TOUBRO ECC CONSTRUCTION GROUP

●NAME ORGANISATION : M/S NOBLE ENGINEERING WORKS

●DURATION : 16TH MARCH 1987 TO 10TH JUL 1988

●POSITION HELD : SITE SUPERVISOR

●CLIENET : - RELIANCE PETRO CHEMICAL LTD. (PATAL GANGA)

● CONSULTANT : ENGINEERING (I) LTD.

●RESPONSIBILITY: Supervisor of unit job CONSTRUCTIONWORK fabrication &erection of piping structural, equipment, hydro testing & commissioning (Job ETP Unit II).

SAFIULLAH SHAIKH

ODISHA



Contact this candidate