CV FOR SENIOR PROJECT/ MECHANICAL/PIPING ENGINEER/ DEPUTY PROJECT MANAGER
PUSHPAKARAN PANDYATTU
Sr. Project Engineer (Mechanical/ Piping)
Technical Department
(Engineering Design Div.),
Sirte Oil Company,
Brega, Libya,
North Africa
Mobile (Libya): +218-**-*******
Mobile (India): +91-974*******
WhatsApp & IMO+91-974*******
(Now Available in Libya)
PERSONAL DETAILS
Date of Birth : 18.09.1974
Marital status: Married
Nationality: Indian
Passport No. : Z2687237
Passport validity: 21.05.2024
Driving License: Libya/ Qatar/ Indian
Language: English/ Hindi/ Malayalam
Availability: 1 Month (Negotiable)
Permanent Address
Pandyattu House, P.O. Choolissery, Thrissur,
Kerala,
India
Mobile (India): 00-91-974-***-****
E mail: adyozu@r.postjobfree.com
adyozu@r.postjobfree.com
Skype ID: pushpakaran.pandyattu
WhatsApp &IMO: +91-974*******
OBJECTIVE
Challenging and rewarding upper level position in a growth oriented organization, which offers diverse job responsibility in Mechanical/ Piping engineering and will fully utilize both my technical and managerial abilities.
SYNOPSIS
Pursuing Project Management Professional (PMP)
Post Graduate Diploma in Piping Engineering from Suvidya Institute of Technology (SIT), Mumbai
PDMS (Plant Design Management System) from SIT, Mumbai
Piping Engineering Certification from Indian Institute of Technology (IIT), Mumbai.
B Tech in Mechanical Engineering (Attested by UAE & Kuwait)
Diploma in Mechanical Engineering
More than 22 years’ experience in the field of Project management / Oil and Gas, sector which includes 18 years in Middle East and Africa (UAE, Qatar, Kuwait& Libya). Experienced in Oil & Gas Plants, Sugar Plants, Thermal Plants, Cement Plants, Cryogenic Tanks, Storage Tanks (Crude oil, Naphtha, Cement, Diesel, Water and Product Bins), Piping, Cross Country Pipelines, flow lines, De-dusting plants.
Familiar with international codes & standards
Associated with the following Oil and Gas companies.
Libya: Sirte Oil Company
Kuwait: Kuwait Oil Company (KOC), KIPIC (Al Zour Refinery)
Qatar: Qatar Petroleum (QP), Dolphin Energy
UAE: ADMA, ADGAS (ADNOC Group Companies)
MAIN RESPONSIBILITIES HANDLED
Review, issues comments/ approvals for the contractors & vendor documents
Assist the project Manager for timely execution of the project with in the agreed time schedule and budget.
Technical Bid Evaluation (TBE) of suppliers’/ vendors submittals.
Review and approval of Design documents and proposals
Liaise with Client and arrange SIMOPS/ HAZID/ HAZOP/ Design Basis meetings.
Execution of projects in conjunction with relevant Contract documents, Client specifications, international codes & job related Method statements.
Sub-contracting Management:
Requesting for quotations, evaluation and registration of Subcontractors
Arranging meeting with sub-contractors, Preparation of minutes of meeting.
Negotiations, Preparation of Bid Tabulations, selection of sub-contractors, recommendation of subcontractors to senior management, conducting Pre-Contract Award Meeting, and placing sub contract orders.
Monitoring the work progress in line with the proposed schedule.
Ensuring all the Sub contractors are following the contractual obligations and Safety Policies of the Company and Client
Verifying the work accomplished by the Subcontractors, Review of payment certificates / payment applications of Suppliers/Subcontractors and recommending for payment.
Managing back-charges to Subcontractors
Monitoring payment to Subcontractors and maintaining the cash-flow
Assessing subcontractors and involving in Audits
Closing out of Sub contracts
JOB EXPERIENCE
I.Period: From July 2019 to Present
Company: Sirte Oil Company (Under the pay roll of Amazon), Brega, Libya
Division: Engineering & Design Division (Technical Department)
Position: Sr. Project/ Mechanical Engineer
Sirte Oil Company is engaged in Exploration, Production, Manufacturing of Oil and Gas and doing all processes including Refining, Crude Oil, Naphtha& LNG exports. Being a Sr. Project Engineer with their Technical Department’s Engineering Design Division; I have actively involved in the following activities.
Preparation of Scope of Works and tender documents
Responses to vendor queries
Coordination for Bidder Site Visits
Technical Bid Evaluation
Technical services for departmental queries
Vendor/ sub-contractor Documents Review and approval
Project Management
II.Period: July 2018 to July 2019
Company: Al Jazeera Industrial Project, Kuwait
Position: Project Manager
Major Projects Handled:
Project: Kuwait Al-Zour Refinery Project_ Unit 2 & Unit 21 Piping & Insulation Works.
Main EPIC Contractor: Sinopec/ Technicas Reunidas (TR)
Client: Kuwait Integrated Petroleum Industries Company (KIPIC)
Scope of Work:
Fabrication and Installation of Piping/ Structures/ Pipe racks/ Equipment
Fabrication and Installation of Interconnecting Piping to equipment
Hydro testing
Painting of piping spools and supports
Insulation of Piping & Valve Boxes
III.Period: March 2017 to January 2018
Company: Schlumberger/ Mark OIL AND GAS Technologies WLL, Kuwait
Position: Sr. Project Engineer
Major Projects Handled:
EPIC for Jurassic Production Facilities (JPF) @ Sabriya to enhance the early
Production Facilities @ North Kuwait.
Client: Kuwait Oil Corporation (KOC)
Scope of Work:
Fabrication and Erection of 30 Nos. of Flow lines to Inlet Manifold
Fabrication and Installation of Pipe racks, Sub racks, Bridges, Access platforms, Pipe supports etc.
Pipe Rack & Interconnecting Piping
Erection of Flare & Incinerator
Modification of structure/ piping on vendor equipment
On skid & Interconnecting Piping to equipment such as HIPPS, Crude heaters, HP/MP/LP separators, Compressors, Turbines, fresh/ Potable/ Fire water Tanks, crude stabilizer, Re-boilers, De- salters, Hot oil system, Chemical Injection skids, Mechanical Refrigeration Unit, Gas Sweetening Unit, Gas Dehydration Unit, Plant air/ Instrument Air Package, Fuel gas package, Solvent Storage, Vapor Recovery Unit, Crude Tanks, Evaporation pond etc.
Tie-in to KOC facilities (Crude Export, Gas Export, Flow lines, Brackish, Export effluent water etc.
IV.Period: August 2011 to October 2016
Company: DOPET (Doha Petroleum Construction Co. Ltd), Qatar
Position: Sr. Project Engineer (Mechanical & Piping)
Major Projects Handled:
•EPIC for Additional Water Storage Facilities in Jabel Tank farm Dukhan, Doha Qatar.
(Client: Qatar Petroleum, Qatar. Consultant: Penspen)
Scope of work includes Demolition of 2 Nos. of old water storage steel tanks, Relocation of Fire water skid, construction of 2 Nos. of water storage Tanks (40m Dia. x 14m Height & 30m Dia. X 20m Height), Relocation of metering skid & related piping/ valve pit/ structures etc.
•EPIC for Integrated Oily water/ Sludge handling system, new drain system, Fire protection for Crude Oil Manifold & Pipeline Replacement in Halul Island.
(Client: Qatar Petroleum, Qatar. Consultant: Worley Parsons)
Main equipment’s are Surge Tanks, Open and closed drain tanks, produce water package, scale inhibitor injection package, Biocide injection Package, oil water analyzer, oxygen scavenger package, HDPE subsea pipeline etc.
•Tie in to the Common Sulphur Project:
(Client: Dolphin Energy Limited, Ras Laffan Industrial City, Qatar)
This includes Construction of 1 No. 13.6 Mtr. dia x 14 Mtr Ht. Dome roof insulated Liquid Sulphur storage tank (Constructed with Jack up system & as per API 650) with all accessories such as Emergency vent, Roof and shell man way, steam inlet and out let connections, Application of heat trace cement, spiral walk way, plat form for Temp. Transmitter etc., 4 Nos. Sulphur transfer pumps, 1 Number metering skid, Jacketed &Skin effect electrical heat tracing (SEEHT) Piping, control valves etc.
V.Period: November 2008 to June 2011
Company: Costain Abu Dhabi WLL, (A subsidiary of Costain Group, Manchester, UK)
Position: Project Engineer (Mechanical & Piping)
Major Projects Handled:
•Flare Handling Emission Recovery (FHER) in Das Island (UAE Offshore). (Client: ADGAS Consultant: Fluor)
Executing the entire EPC project which covers all the critical activities such as Civil works, Equipment erection consists of 3 Knock out drums, Elevated plat forms, control valves/ Manual valves, Pumps, Support fabrication, pipe rack strengthening, piping spool fabrication & erection, sand blasting and painting, E&I work, Passive Fire Protection, Hydro testing and commissioning etc.
•Project of Offshore Associated Gases project (OAG-1) Location: Das Island (Offshore), UAE.
(Main Contractor: TECHNIP MEPI, Client: ADGAS, PMC: WORLI PARSONS)
•Major Overhauling of Crude Oil Storage Tanks 12, 10 & 17, ADMA-OPCO, Das Island. (Tank Diameter 80 m. Height 20 m.).
Scope of works includes the following,
Entire Bottom plate removal which includes gas freeing, GRP removal achieved by hydro jetting to enable gas cutting, replacement of bitumen, new floor with Annular ring and bottom plate laying & welding with SAW/ Mig welding.
Application of new GRP lining to floor and 2 meter of shell height.
Demolition of floating roof and re-construction of double deck roof which includes Fabrication and erection of guide pole, Anti rotation pole, Rolling ladder, legs, seals, emergency vents etc.
Partial shell replacement by giving extra supports prior to cutting, welding with automatic and manual (100% radiography).
Replacement of wind girder and damaged portion of walk way and replacement of form pourer (Firefighting system).
Related piping work including tie in.
Hydro testing
Scaffolding, sand blasting, painting & Stenciling.
•Buried pipeline replacement (EPC)
Buried Pipe replacement project which includes replacement of flow lines, trunk lines, suction lines and delivery line to offshore installations.
VI.Period: August 2005 to September 2008
Company: Julphar Engineering Works LLC, Ras Al Khaimah, UAE
Position: Mechanical Engineer (Structural& Piping)
Major Projects Handled
•Ras Al Khaimah Gas Commission – Instrument air piping, 2” potable water GRE piping network, fabrication and installation of pipeline markers. Construction of New Fire water tank along with Fire water line, hydrant, Spray nozzles etc.
•Dubai Electricity and water Authority (For Enel power) : Fabrication and Erection of Structures, Lifting arrangements, Platforms, Ladders for their Gas Turbine Halls (GT- 51, 52 and 53) in Jabel Ali Power Plant.
•Stevin Rock LLC: Fabrication and Erection of Conveyor systems, Crusher Plants, Production silos (Round with conical Bottom and Square types), De dusting plant consists of ID Fan, Chimney, Dust collector tank, piping, Dampers, Transition Pieces Etc.
VII.Period: October 2004 to June 2005
Company: M/s. Gulf Cement Company Ras Al Khaimah, UAE (Working under M/s. Ayoki Fabricon Pvt. Ltd., Pune, India)
Position: Site in charge (Structural & Piping)
Major Projects Handled
•Fabrication and Erection of Cement Storage Silo with conical bottom - 5000 MT- 2 Nos. (12 m ID and 50 m Height. Cone portion Thickness varies from 40mm to 25 mm Thick and Shell portions Thickness varies from 25 mm to 10mm)
•Fabrication and Erection of Cement Storage Silo- 3750 MT- 4 Nos. (12 m ID and 36 m Height).
•Fabrication and Erection of Bridge to connect Existing Concrete silo to newly erected Steel silo at an elevation of 50 m
•Fabrication and Erection of Conveyor frames, De dusting system, Bottom level platforms etc. for the Silos.
VIII.Period: August 1999 to October 2004
Company: M/s. Ayoki Fabricon Pvt. Ltd., Pune, India.
Position: Site in charge (Structural & Piping)
Major Projects Handled
•Fabrication and Erection of Sugar plant at Nilanga, Lathur, Maharashtra, India, which includes heavy structures, tanks, piping (IBR), machinery fittings etc. This includes
•Construction of Water Storage Tanks for water treatment plants for Raichur Thermal Power Station.
•Fabrication and Erection of Ash handling system and water treatment plants for Raichur Thermal plant power station, Karnataka, India, which includes heavy structures, Cone roof tanks, piping, erection of pumps & related machineries.
•Erection of 2 x 150 TPH CFBC Boilers (Coal Fired with ESP), including site fabrication of structures and ducting at Birla Copper Dahej, Gujarat.
•Construction of 1 No. Sulfuric Acid Tank 32 Meter dia. x 12 Meter height at Birla Copper, Dahej
IX.Period: July 1993 to July 1995
Company: M/s. Cinzac Technical Services, Cochin, India (Dealer for Thermax Boilers, Kerala)
Position: Service Engineer
Major Works Handled
Servicing and overhauling of Thermax make water tube non IBR boilers and related water system, air system and fuel system in various districts of Kerala, India
QUALIFICATIONS
PROJECT MANAGEMENT
•Pursuing Project Management Professional (PMP) – 35 Hours Contact Class is over and preparing for the examination.
•MS- Project from CADD Centre, Thrissur, Kerala, India, in March 2007.
PIPING ENGINEERING
•Post Graduate Diploma in Piping Engineering from Suvidya Institute of Technology, Mumbai in August 2011
•Piping Engineering certification course from Indian Institute of Technology (IIT), Mumbai
•Mechanical CADD (Auto Cad) from CADD Centre, Thrissur, Kerala, India, in 2007
•Plant Design Management System (PDMS) from Suvidya Institute of Technology Mumbai
ACADEMIC
•B Tech in Mechanical Engineering in 1999 from Institution for Skill Development and Certification (Attested by UAE & Kuwait)
•Diploma in Mechanical Engineering from Department of Technical Education, Government of Kerala, India, in 1993
•Diploma in Production Management from Annamalai University, Chidambaram, India in 2001.
•Advanced Training in Welding Fundamentals for Supervisors and Engineers conducted by Advanced Training Institute, Madras, Ministry of Labour, Government of India in 1996.
SAFETY/ OFFSHORE TRAININGS
•IOSH - Managing Safely conducted by TWI Middle East (Certificate No. 7538)
•Hazard Awareness for Juniors by Emirates Technical & Safety Development Centre (ETSDC)
•HUET/ SEA SURVIVAL Training
•H2S/ BA AWARENESS Training
•Confined Space Entry Training
•Familiar with Permit to Work System(PTW)and one of the Performing Authority for Abu Dhabi Marine Operating Company (ADMA-OPCO) in Das Island (UAE Offshore)
•PTW Level – II (Permit to Work System) for ADGAS.
•Advanced Safety Auditing – Fire Fighting- H2S Awareness- BA-from ADGAS
I hope, that the particulars that given above will meet with your requirements and I shall be called for the Interview. I am confident in my abilities and if selected, I can successfully discharge the duties assigned to me for the satisfaction of superiors and the company.
Place : Brega, Libya (North Africa)
Date : 18th July 2023
PUSHPAKARAN PANDYATTU