Post Job Free

Resume

Sign in

Qa Qc Site Engineer

Location:
Al Dafna, Qatar
Salary:
negotiable
Posted:
August 03, 2023

Contact this candidate

Resume:

CURRICULUM VITAE

May **,****-July **,**** Site Engineer/Inspector Al Khaleej Engineering & Industrial Consultancy

Project: PQ Department for KAHRAMAA Projects.

Work as a QC Engineer for the ongoing KM projects, Water operations, Water maintenance, ASGHAL projects with potable water, RPS, Electrical distributions and and pipeline infra reinstatements.

March 20, 2021 –September 29, 2022 Road Engineer Gulf Engineering &Industrial Consultancy

Project :RIW FOR JUNCTIONS & ROUNDABOUTS INVARIOUS AREAS OF GREATER DOHA PHASE-8

RIW IN RAYYAN AREAS PHASE 5

February 1-15 March 2021 Road Engineer Gulf Engineering &Industrial Consultancy Project :RIW VARIOUS AREAS OF GREATER DOHA PHASE-6 RESPONSIBILITIES AND DUTIES

Directly reporting to Resident Engineer

BELTRAN ODCHOC MANENGYAO

PERSONAL INFORMATION

Age: 51

Date of Birth: April 18, 1972

Nationality: Filipino

Years of Experience:20 years

Email Add: adyosc@r.postjobfree.com

Mobile: 66720986

Position Applied : Civil Engineer / Site Engineer QUALIFICATIONS

Bachelor of Science in Civil Engineering from Baguio Colleges Foundation 1995 (Now changed to University of Cordilleras) at Baguio City, Philippines.

SAP# 70005868(Saudi Aramco Certification)

PRC Registration No. 0092657

MMUP Engineering Registration No. 29163

Qatar Driver License Light Vehicle

Approved KAHRAMAA Civil Site Engineer/Inspector

SEMINARS:

ISOO 900, 14001 & 45001 Awareness Training . Agency: Al Raeda Consultancy & Quality CAREER HISTORY

Review of shop drawings,As-built drawings, method of statement, inspection test plan and final as-built drawings submitted by main contractor for recommendation for Resident Engineer final review and approval.

To monitor and push the contractor to complete the required work activities as per work schedule and QCS14 standard.

Attend and inspect road and utilities work related prior to commencement and approve if it is within the approve work standard.

Monitor daily work progress as per approved shop drawings and submit work status to Resident Engineer.

Daily monitoring and supervision of on-going roads work related activities.

To recommend and suggest technical solutions of road works related activities as per contractor technical queries based on the QCS 2014.

Issue Corrective Action Report (CAR)and Non Conformance Report(NCR) for all activities which is not confirming with QCS 2014 specifications.

Review, comment and endorse for the closure of issued Corrective Action Report

(CAR)and Non Conformance Report(NCR) after inspection and verification at site.

Review and approve daily Inspection Notification Request(INR) submitted by the contractor.

Attend and witness quality testing of on going and completed works at site with the presence of the approve Third Party.

Attend scheduled management meetings with the client and contractors representatives regarding construction issues.

Coordinate to other stakeholders other than PWA regarding the construction, inspection and shop drawings related to the project.

July 30, 2019 – Up to January 28, 2021 Road Engineer Hyundai Engineering and Construction WLL Qatar

Project: Construction and Upgrade of Al Bustan Street South(P007- C5-P1)

(Design and build)

RESPONSIBILITIES AND DUTIES

Assign for the construction of road formation and related road structures

Coordinate with the HDEC QA/QC and consultant (Parsons)and to take their approval prior to commence of the next activity

To monitor and push the subcontractor to complete the required work activities as per work schedule.

Maintain daily work progress and activities being done at the project site.

Report daily to the construction manager regarding the work status and any problem arises at the project site.

Preparation for the soft and hardscape area prior to hand over for the sub contractor for sub base laying

Coordinate with batching plant regarding the concrete requirements for particular concrete structure to be done

Monitor and assist material requirements prior to laying out asphalt base coarse and wearing coarse

March 18, 2018 – 17 March 2019 Civil Site Engineer Daewoo Engineering and Construction WLL Qatar

Project: Construction and Upgrade of E- Ring Road North/South Link(P008 C2)

(Design and build), 11KV Substation

RESPONSIBILITIES AND DUTIES

.Assign for the construction of wet utilities structures

Coordinate with the DEC QA/QC and consultant (Parsons)and to take their approval prior to commence of the next activity

Supervision of construction of 11KV Sub station contractor Galfar Al Misnad

To monitor and push the subcontractor to complete the required work activities as per work schedule.

Maintain daily work progress and activities being done at the project site.

Report daily to the construction manager regarding the work status and any problem arises at the project site.

Prepare construction schedule for our subcontractor to be carried out at the work site.

Coordinate with batching plant regarding the concrete requirements for particular concrete structure to be done

August 24, 2017 to October 30, 2017 QA/QC Civil Inspector Joannou & Paraskevaides (Qatar) Limited

Project: Qatar Foundation Stadium Main

Works(Design and Build)

RESPONSIBILITIES AND DUTIES

Check and verify the structural details of the structure scheduled for inspection if it is as per approved shop drawing details.

Coordinate with the ASTAD consultants and to take their approval prior to commence of the next activity.

Routinely inspection of the civil related works and to see to it that it complies with the Qatar Construction Standards 2014.

Complete the necessary checklist and attached all related documents and to take the required signatories to compete the RFIT (Request for inspection and testing)documents prior and after the execution of the work.

To report all quality deficiency issues to QA/QC Manager so that necessary actions will be done.

To ensure that all quality standards will be implemented in all civil related works with in my area of responsibility.

To prepare and submit daily quality observation reports to the QA/QC Manager.

To prepare and attached required completed work pictures in order to close the ASTAD site observation reports

April 4, 2011 to June 29, 2017

Project: GTC 244/2008 Headworks Construction for Duhail &Umm Qarn RPS, GTC 323 Upgrading of Reservoir Capacity at NewShahaniya RPS & Shahaniya Dukhan RPS, GTC 426 New Al Kaaban RPS & Associated Pipelines(Qatar). GTC 600/2013 Mega Pipeline for Mega Reservoirs (Package A&B)

Planning

Engineer

Habtoor

Leighton

Group(Qatar)

RESPONSIBILITIES AND DUTIES

Preparation of resource and cost loaded planning schedules. Produce resource histograms / KPIs

Review and evaluate the subcontractor’s schedules, reports and monitoring progress in order to align the subcontracted items as indicated in the contract schedule

Provide feedback to the Project Planning Manager on subcontractor’s schedule status

Track regular progress required to produce periodic reports, Progress updates and to ensure the compliance to the completion schedule

Coordination with other departments for compilation of periodic reports (internal / external).

Collate and track documentation relevant to the preparation of extension of time schedule in order to substantiate in the preparation of claims in coordination with Commercial Department and the Project team

Provide short time programs/look ahead programs for the Construction team

Conduct site visits to monitor ongoing activities of execution

Highlight actual progress deviations from scheduled progress and the Baseline / Approved Contract Schedule to the team in order to analyze the impact to the over-all completion and advise on mitigating the delays / fast tracking the schedule

To prepare monthly status report and submit to supervisor data are input to the monthly updating of execution programme

January 24,2011 – March 21,

2011

QC Civil Inspector Technip Saudi Arabia LTD

Project: Jubail Export Refinary Project-Interconnecting, Flares, PCS & Electrical System-SATORP

( Jubail,KSA)

RESPONSIBILITIES AND DUTIES

Conduct routinely surveillance and site inspection of civil site works.

Coordinate with the Construction Manager, Site Engineer to work out the priority works to be done in order to complete the work as per schedule.

Coordinate and follow the materials and equipments needed in order to complete the particular scope of work.

Monitor the civil all work activity and push the construction manager and site engineer to fast tract the completion of the priority works.

Coordinate with the other discipline regarding the interconnecting activities at the work site in order that the intervening activities will not be affected.

Prepare daily activities report and daily accomplishments to be submitted to the concern individual

July 1,2010 – Dec 15,2010 QA/QC Civil inspector Mohammad Al Mojil Group Project: King Abdullah University Science and Technology Project( Rabigh,KSA) RESPONSIBILITIES AND DUTIES

Conduct routinary quality surveillance and site inspection prior commence of civil site works.

Prepare Quality Inspection Report (QCI) in any deviation or violation from the issued IFC drawings

Raise request for inspection (RFI) of all civil works and submit to ARAMCO PMT/PID.

Preparation of punch list of balance of work and update regularly and coordinate with the construction to close such punch list items.

Monitor the finishings works gypsum wall board, installation, ceiling suspension, and tiles/marble installation as per approved IFC the correct materials.

Coordinate with the construction people regarding the completion of punch list items. Dec.6, 2009 – June 30, 2010 QA/QC Civil Inspector Rajeh Al Marri & Sons Co. Project: Oil Upstream Pipeline Projects (Abqaiq, KSA) RESPONSIBILITIES AND DUTIES

Conduct surveillance and site inspection prior commence of civil site works.

Check the pre concrete pouring inspection of precast foundation at the fabrication area prior to concrete placement as per Aramco standards prior to commence of work.

Raise request for inspection (RFI) of all civil works and submit to ARAMCO PMT/PID.

Proper documentation of QA/QC files and other QC office related works.

Monitor and update weekly quantity precast status accomplishment and advice all concerned Feb. 18, 2009 – April 30, 2009 QA/QC Civil Inspector Consolidated Contractors Company(KSA)

Project: Khursaniya Producing Facilities (Khursaniya, KSA) RESPONSIBILITIES AND DUTIES

Conduct surveillance and site inspection of site preparation prior commence of asphalting works.

Monitor and check the asphalt temperature and weather condition as per Aramco standards prior to commence of work.

Coordinate with contractor: Snamprogetti QC Supervisor and Aramco PMT and Inspectors daily and to insure that all works performed are within the Aramco standards.

Update and monitor daily works accomplishment and advice all concerned.

Proper documentation of QA/QC files.

Sept. 7, 2008 – Feb. 5, 2009 Civil Work Inspector Shaw Stone & Webster Arabia Company LTD(KSA).

Project: Yansab Petro Chemical Complex Project EPC-RC-06 YANSAB-007-IK Butene Benzene Tolene Xylopene(BBTX) Plant (Yanbu, KSA)

RESPONSIBILITIES AND DUTIES

Monitoring of the construction of all civil related works to ensure that all works is done as per IFC drawing.

In charge of the pre casting and installation of catch basin and manholes.

To monitor the work progress of the sub contactor and to push them to achieve more work progress

Coordination to the subcontractor construction manager and civil supervisors related to progress and completion of the civil works as per standard specification.

Prepare and submit daily progress status of all civil related works July 23, 2007 – Aug. 24,2008 QA/QC Engineer/QA/QC Investigator Marubeni Saudi Arabia Company LTD(KSA)

Project: Qassim Cement Company Production Line No.3 (JOB NO. 5031-086) (Qassim, Buraida, KSA)

RESPONSIBILITIES AND DUTIES

Preliminary investigation and marking of concrete defects using the Test hammer

Supplemental investigation

Investigation of repaired areas

Investigation of cracks on repaired areas.

Checking the quality of repaired materials

Checking and witness the compression test of the cubes samples.

Quality control documentation

Attending of pouring and check the workability and temperature as per product catalogue March 2007 – July 2007 QA/QC Civil Inspector TEKFEN Saudi Arabia Project: Rabigh Refining and Petrochemical Company (PETRORabigh UO1)

(Contract Package 0050/00)(Rabigh, KSA)

RESPONSIBILITIES AND DUTIES

Prepare RFI for all civil related works and submit to Hitachi main office

Conduct routinely surveillance of all civil related works for cooling towers #2,3 and 6. To ensure that is being carried out as per approved plans and specification.

Coordinate with the Petrorabigh inspectors in checking the contractors works prior to any commence.

Check and validate the supplier and materials being used is being approved by the client.

Update and closed Quality Log Book concerning my areas of responsibilities.

QA/QC documentation works.

Jan 2005 – Feb. 2007 Civil Engineer/QA/QC Civil Inspector Salem Saleh Al Hareth Est. & Contracting

Project : Producing Facilities(Non Process Building) (BI # 31430,JO#314300)( Khursaniya, KSA) AIN DAR& SHEDGUM SEA WATER CONVERSION PROJECT (BI-8274)(Qurraya, KSA)

RESPONSIBILITIES AND DUTIES

Supervisor:

Supervision in the layout and excavation for foundations, underground piping construction of non processed buildings, supervised the workers in the concreting works.

Prepare daily progress report.

Insure the daily progress of the work and request the necessary materials needed in the project. QC Inspector:

Conduct surveillance and civil work inspection in accordance to approved plans(IFC) of Aramco standards and construction procedure.

Prepare a request for inspection (RFI) thru the contractor and checklist in accordance to approved inspection technical procedure prior to commence of work.

Coordinate with contractor: Snamprogetti QC Supervisor and Aramco PMT and Inspectors daily and to insure that all works performed are within the Aramco standards.

Update and monitor daily works accomplishment and advice all concerned.

Proper documentation of QA/QC files.

Inspect all deficiencies of works for corrective measures of every punch list and advice by contractor QC department

Civil Supervisor:

In charge in the fabrication yard wherein Electrical Draw pits, Instrumentation Draw pits, lighting pole and tower and other civil work related to the on going projects.

In charge in the paving works of treatment modules plant.

Preparation in the requisition, updating work progress status, coordinating to other sub contractors to expedite work progress.

Supervision the pre casting procedure as per approved plans and specification.

Quantity surveying works.

Preparation of bill of quantities for proposed or to be bid projects.

Tracking of quantity take off.

Feb. 2001 – Sept. 2004 Rural Infrastructure Civil Engineer Dept of Agriculture-Cordillera Highland Agricultural Resource

Management Proj (DA-

CHARMP)

Project: Department of Agriculture-Cordillera Highland Agricultural Resource Management Project) Asia Development Bank Funded Project

RESPONSIBILITIES AND DUTIES

Prepares and updates detailed quantity and cost estimates of all agri-infrastructure projects submitted by the partner implementing agencies Provincial Engineers Office, National Irrigation Administration of the provinces of Abra, Benguet and Mountain Province.

Review detailed estimates and cost derivation of irrigation, farm to market access, domestic water supply projects submitted by PEO’s and NIA for concurrence and approval.

Prepare and updates program of work and individual CPM, cash flow, s\S-curve of agri- infrastructure project of the agency.

Conducts field investigation of suitability of proposed sites of agri-infrastructure projects and prepare validation report and vicinity map of each project.

Coordinates with the project beneficiaries and other government/private agencies and NGO’s to speed up project implementation.

Monitor evaluates the financial disbursement/status of each infrastructure projects being implemented.

Periodically inspect the quality and workmanship of on going and completed infrastructure and approved the completed project prior to billing.

Assist Regional Bids and Awards Committee in the review of tender/Pre-Qualification/Bid Documents of interested contractors to which includes expertise, financial capabilities in undertaking Farm to market access.

Jan.1998- August 2000 Project In charge Department of Agriculture(DA- CECAP)

Project: Central Cordillera Highland Agricultural Resource Management Project RESPONSIBILITIES AND DUTIES

Assist the zone engineers in the conduct of detailed surveys, calculation, plotting of survey results.

Undertake the preliminary survey results, calculation of preliminary quantities and cost estimates of the project.

Undertake the daily supervision of the project/s assigned to ensure that they are constructed as per approved plans and specification.

Conducts coordination meeting or liaise with other concerned programmed staff, Participants, Local Government units and other agencies involved in the project/s to insure the full participation in the accomplishment of the activities on target date.

Maintain project site files of the approved Program of Works, Plans and specification including site instruction or communications relevant to the project.

Prepare as built plans and quantity computation of actual accomplishments of all physically completed projects.

Guide and train on the job beneficiaries in the proper construction procedure March 1995- Aug 1997 Field engineer Meralco Industrial Engineering Services Corp/E.P Lumdang

Contractors Designers &

Builders

Project: Underground utilities of Philippine Long Distance Telecommunication Company(PILTEL) Private housing Units

RESPONSIBILITIES AND DUTIES

Direct supervision of trench excavation, lay out, installation of underground telecommunication pipelines conduit for the Philippine Long Distance Telecommunication Company (PILTEL),

Prepare daily and weekly accomplishment reports.

Direct supervision in the reinstatement of excavated trench locations.

Direct supervision in the actual construction of residential and commercial buildings.

Prepare detailed engineering drawings and cost estimates



Contact this candidate