Post Job Free

Resume

Sign in

Assembly Technician Set Up

Location:
Milpitas, CA
Posted:
August 02, 2023

Contact this candidate

Resume:

Thuy Vy Nguyen

Manufacturing/Assembly Associate

Contact

Phone

408-***-****

E-mail

adyodp@r.postjobfree.com

Languages

Vietnamese

Good

Skilled Line Captain with demonstrated skills in team management and consistently meeting and exceeding daily goals. Highly effective working in fast-paced environments. Known for dynamic leadership and maintaining efficiency.

Work History

2023-02 – Current

Assembler I

Procept Biorobotics, California

Assist engineering team with validation at new facility

Assembled wiring shelves, cages, carts and equipment fixtures for CER

Set up equipment for Aspiration Tubeset line (EFD dispensers, UV Curing System, Automatic Tubeset Cutter) and changed out parts as needed (UV bulb, UV wand, EFD dispensers air lines, adapters)

Created trackers for attendance, training certifications and team task list with accompanying daily dashboard in Smartsheet

Communicate with engineers about potential issues and discrepancies observed in lines certified (Manifold, Aspiration Tubeset)

Train other associates to assist in creating samples for Aspiration Tubeset and testing using Mark-10

Assist in editing Redline for Aspiration Tubeset daily set up form

2021-06 – 2023-01

Manufacturing Associate II / Line Captain

Cepheid, California

Inspected products and machines to maintain quality and efficiency.

Supported machine operators in setup and operation of production equipment resulting in efficient runs.

Performed general equipment maintenance and repair to minimize downtime.

Tested products or subassemblies for functionality or quality and troubleshot problems with equipment, devices or products.

Made sure that products were produced on time and are of good quality.

Inspected finished products for quality and adherence to company specifications.

Examined incoming materials and compared to documentation for accuracy and quality.

Assembled products according to changing daily work orders

Maintained organized work area by cleaning and removing hazards.

*2020-06 – 2021-03, 2021-03 – 2021-06

Assembly Technician

Abbott Vascular (*ATR International)

Operate pneumatic press

Inspect units under a microscope for damages and rejects

Used electronic screwdrivers and tools as required to assemble

Cross trained to other areas as necessary

Track lots and rejects through eLHR system

Ensure MPIs are always followed accordingly

Use loctite and UV curing equipment to bond

Identify possible line improvements and fill out necessary documents

Examined incoming materials and compared to documentation for accuracy and quality.

2019-06 - 2020-02

Assembly Technician

Nordson Medical (Peak Technical)

Assembled catheters within a CER

Worked with small hand tools as well as measurement tools

Visually inspected each unit under a microscope to ensure there were no defects

Operated hot air systems, lamination machines and flaring boxes

Ensured MPIs are always consistently followed

Applied lean manufacturing principles to work daily

Completed an average of 400 units with a 14,000 unit monthly quota (between two shifts)

Inspected all work for quality and compliance with design standards.

Performed assembly of products according to specifications and instructions.

2019-03 - 2019-06

Assembly Technician

Shockwave Medical (Aerotek)

Worked with a controlled environment

Assembled balloon catheters according to MPI

Ensured each device assembled conforms to specs and are tested before continuing down the line

Visually inspected all products are free of defects and adhered to standards

Filled out LHRs accordingly following GDP standards

Used small tools, loctite, UV curing, balloon pleat and fold, flaring boxes

Closed lots as they were completed and verified all information before starting the next lot

*2018-02 – 2018-12, 2018-12 - 2019-02

Assembly Technician

Venta Medical (*Balance Staffing)

Assembled components under microscope within clean room environment

Verified SOPs are being followed

Recorded device history and maintained accurate component inventory

Visually inspected all products are free of defects and adhered to standards

Operated laser cutting and welding machines for small project orders

Cross trained to other workstations as required

2016-12 - 2018-02

Operations Material Management

Bloom Energy (Randstad)

Material Management

Identified stacks needed for kitting and reworks

Assisted with operations in planning work for production team

Verified incoming/outgoing materials and shipments and update Oracle Database

Helped manage inventory by investigating any discrepancies between physical inventory and Oracle Database

Sent out daily and weekly reports regarding current production and goals

Inspected incoming and outgoing shipments to identify discrepancies with records.



Contact this candidate