Post Job Free

Resume

Sign in

Power Plant Qa Qc

Location:
Dammam, Eastern, Saudi Arabia
Salary:
20000
Posted:
August 01, 2023

Contact this candidate

Resume:

Page */*

Hard working and ethical engineer with very good knowledge in Power Generation industry and Healthcare organisation, recognized for being extremely organized and detail oriented, with exceptional aptitude and troubleshooting skills, dedicated to doing the best possible job every time. Personable and approachable, with a strong team spirit; enjoy coaching and assisting co workers. QUALIFICATIONS SUMMARY

15 years of experience very good knowledge in contracting, start up, commissioning activities related to instrumentation, electrical, control systems (BMS, DCS, SCADA,PLCs), PIDs and mechanical systems.

Master degree in Automation and Production Systems, École Central de Nantes, France 2008.

Bachelor of Electrical Engineering (B.E.E.), Industrial Power, Lebanese university, Lebanon 2008

Fluently multilingual (verbal and written) in English, French and Arabic.

Excellent communication and interpersonal skills; strong logical thinking, synthesis, leadership and analysis skills.

Strong safety focus, exceptional safety record.

Work well in high pressure situations and rush projects, whether alone, supervising or participating on a team.

TECHNICAL SKILLS INCLUDE:

Reading, interpreting, understanding all

types of MEP and E&I drawings:

SLD, HVAC, Schematics, P&IDs, ILDs, Cable

pull cards, cable termination Schedule, KKS

coding system, GA and cable trays/ladders

layouts, piping, chillers, VAVs and AVs.

All types of Electrical erections, cable pulling and termination activities:

Generators, Alternators, MV/LV SWGR, Panels and

MCC erections and its Cable raceways and cable tray works, Cable pulling and connections to DCS/TCP

cabinets

BMS,PLC, DCS and SCADA Commissioning

works:

Signal cold, hot loop and functional checks, GE

MARK 6E, Yokogawa Centum VP R5, Siemens

Sematic S7 300, HART and Modbus interfaces.

Electrical Commissioning Activities:

SWGR and electrical Panels Component and relay

testing, inter trip/interlock testing schemes and logic trip matrix.

All kind of Field instrumentation sensors

and mechanical piping:

PI, LT, PS, Control valves, Calibration and

installation with tubing works and leak test.

Actuators & Valves: AUMA, ROTORK –

motorized, pneumatic, solenoid

CCR and DCS F.O communication Network:

Building F.O DCS network and central control room

for remote control. This includes F.O pulling and

splicing and testing. In addition to Erection of

consoles.

IBRAHIM ZEITOUN

Dahran Street – Al Hasa Al Moosa Hospital

Immediately Joining

Transferable iqama #249-***-****

Cell: +966-**-***-**** (KSA)

Email: adynll@r.postjobfree.com

Lebanese Passport (10/04/1987)

SENIOR LEAD MEP ENGINEER, 15 Years of Accident free EPC Mega Projects Experience Related to Process Control Systems of power Generation and Healthcare Page 2/5

PROFESSIONAL EXPERIENCE

Al-Moosa Specialist Hospital (Hasa- KSA) Aug 2021 Dec-2022 Start up and O&M lead for the Hospital New North Tower until its full operation Floor by Floor. The tower consists of 18 floors (250 Beds), 10 ORs, 75 CCU and ICUs, 5 U/G car parking floors Following with the Contractor to finalize the related electrical, low current, BMS (Siemens) and mechanical works.

Following with the end user for any comments and additional requirements to insure proper handover of the works.

In April 2022 we started the O&M works and activities along with the Maintenance Company. FreeLancer: Self Employment May 2019 Oct 2020

Worked as self employed electrical engineer along with other discipline engineers (civil and Mechanical) performed and executed the building of two villas in Lebanon (Ghazi and Aana). I was responsible about all related electrical works and low current from design until operation. GENERAL ELECTRIC Dec 2018 Mar 2019

1 Waad Al Shamal Integrated Solar & Combined Cycle Power Plant Dec 2018 Mar 2019 Project overview: Client: Saudi Electricity Company (SEC); Consultant: ESBI; Main Contractor: (GE); Capacity 1390 MW (4XGTG “GE 7FA 05” & 1XSTG & 4XHRSG, 50 MW Concentrated Solar Field) Position: I&C Construction Manager:

Leading a team of (5) I&C direct engineers to control the subcontractor (CGA) by monitoring their daily progress and adherence to the schedule regarding all I&C construction works including instrument calibration & installation, pulling and termination of I&C, and F.O. cables GAMA POWER SYSTEMS ENGINEERING & CONTRACTING INC. Aug 2017 Aug 2018 1 Construction of Combined Cycle Power Plant #13 (PP13), Riyadh KSA Aug 2017 Aug 2018 Project overview: Client: Saudi Electricity Company (SEC); Consultant: Warley Parsons; Main Contractor:

(GAMA); Capacity 1800 MW (6XGTG “GE 7FA” & 2XSTG “GE D11A” & 6XHRSG “STF”) Position: I&C Area Construction Manager:

Following with engineering team for design and drawings approval from client.

Leading a team of (8) I&C direct engineers to control the subcontractor (CGA) by monitoring their daily progress and adherence to the schedule regarding all I&C construction works including instrument calibration & installation, pulling and termination of I&C, and F.O. cables, consoles and CCR.

Following with QA/QC for ECCs, and TOPs.

Progress meetings with the client and planning department. ARABIAN BEMCO CONTRACTING CO.: Apr 2009 Jun 2017

1 Construction of Combined Cycle Power Plant #12 (PP12), Riyadh KSA Aug 2014 Jun 2017 Page 3/5

Project overview: Client: Saudi Electricity Company (SEC); Consultant: Parsons Brinckerhoff; Main Contractor: (BEMCO GS) JV; Capacity: Gross 2050.9 MW, Net 1992.1 MW (8XGTG “GE 7FA” & 2XSTG

“ALSTOM DKYZ3 2N33” & 8XHRSG “GS”)

Position: Electrical, I&C Closeout Manager: Dec 2016 Jun 2017

Following up with to close out all remaining electrical/I&C construction and commissioning works and PL/NCR closure. In addition remaining GT electrical tests like Island mode and dead bus tests. Position: Site Manager for BEMCO Services: Jan 2016 Nov 2016

Testing and commissioning of all Electrical equipment that include but not limited to MV and LV SWGRs, LV MCCs, protection panels, inter trip /interlocks.

Leading a team of 6 testing engineers until synchronisation of all GTs and STGs.

Setting up priorities for energizations as per the commissioning schedule. Position: Production Manager for MV/LV Equipment GEDAC Electric Factory: Apr 2015 Dec 2015

Responsible for the production line in factory in Jeddah for the MV and LV equipment that include SWGRs and Panels.

Make sure the product is in line with the international standards/ specifications and client requirements and co ordination with QA/QC.

Position: Electrical, I&C Construction Lead: Aug 2014 Mar 2015

Following with engineering team for design and drawings approval from client.

Monitoring of Subcontractor’s (PSP) daily progress and adherence to the schedule regarding all I&C and Electrical construction works including instrument calibration & installation, pulling and termination of I&C, LV, MV and F.O. cables, installation of SWGRs, MCCs, Electrical equipment, consoles in LCBs and CCR.

All DCS (Yokogawa Centum VP R5) cold and hot commissioning works for monitoring and controlling GE 7FA.05 GTGs, Alstom STGs, HRSGs, Atlas Copco Gas compressors, WTP, Electrical MV&LV power equipment testing, and other PLCs in BOP.

Following with QA/QC for ECCs, CCCs and TOPs.

Progress meetings with the client and planning department. 2 Qurayyah Combined Cycle Project (QCCPP), Qurrayah KSA Dec 2013 Jul 2014 Project overview: Client: Saudi Electricity Company (SEC); Consultant: Lahmeyer International; Main Contractor: BEMCO; Capacity 1560 MW (6 XSTG) 6 blocks Position: Sr. Electrical, I&C construction & Commissioning Engineer:

Supervision for I&C works in 4 blocks by a team of six (6) engineers and 180 direct manpower forces. Each block consists of 3 HRSGs, one STG and one MV/LV building.

Pulling of more than 2 million linear meters of I&C, LV, MV and fiber optic cables.

Termination of more than 40,000 cable ends and fiber splicing of more than 1500 point.

Cold and hot commissioning works of more than 50,000 DCS (GE MARK 6E) loops.

Prepared a master instrument list in excel with all the location and range information. 3 Reinforcement of Qassim OCPP Project Extension III, Qassim KSA July 2011 Nov 2013 Project overview: Client: Saudi Electricity Company (SEC); Consultant: Saudi Consult; Main Contractor: BEMCO; Capacity: 480 MW, (8XGTG)

Page 4/5

Position: Sr. I&C construction & Commissioning Engineer:

Led a team of five (5) I&C engineers with 100 direct manpower forces on site responsible for instrument calibration, installation, cabling works and loop checks.

All DCS (GE MARK 6E) cold and hot commissioning works for monitoring and controlling GE 7EA GTGs, COTP,WTP and STP PLC commissioning in BOP.

Safety interlock tests with GE TA for GTGs.

SCADA commissioning with Dispatcher.

Followed with QA/QC for ECCs, CCCs and TOPs.

Followed Red mark up drawings, As built and PL closure

Progress meetings with commissioning manager and planning department. 4 Construction of Qurayyah Open Cycle Power Plant, Qurrayah KSA Apr 2009 Jun 2011 Project overview: Client: Saudi Electricity Company (SEC); Consultant: Black & Veatch; Main Contractor: BEMCO; Capacity: 1905 MW, (15XGTG)

Position: Site Electrical and I&C Engineer:

Followed up the Installation of electrical power equipment like MV&LV SWGRs, GSUs, PEECC.

Execute the drawing and follow up with Engineering team if any discrepancies.

Supervised a team of 2 supervisors, 5 Forman’s and 40 technicians for the cable pulling and termination of TCP panel in all 15 GE frame F GTs.

Cold loop check for I&C cables and IR test for power cables.

Inspections with the client/consultant.

Handover the executed work to Commissioning team. PHD RESEARCHER AND PROFESSOR ASSISTANT IN ESTACA Jun 2008 Mar 2009 Project: AUTOSAR, ESTACA Laboratory, Laval- France Project overview: Client: ESTACA (École supérieure des techniques aéronautiques et de construction automobile); University: UTC (Université de Technologie de Compiègne) Responsibilities:

Make researches and development of AUTOSAR (AUTomotive Open System ARchitecture) which is an open and standardized automotive software architecture, jointly developed by automobile manufacturers, suppliers and tool developers in Europe.

Lab and practical works to third year undergraduate students in ESTACA 50 hours EDUCATION

First year PHD student Jun 2008 Mar 2009

Université de Technologie de Compiègne, France

Master’s Degree in Automation and Production Systems 2008 École Central de Nantes, France (got Rank 1)

Bachelor of Electrical Engineering 2008

Page 5/5

Lebanese University Faculty of Engineering Branch III, Lebanon Member, Order of Engineers of Lebanon

Member of Saudi Council of Engineering (SCE) in KSA Languages: fluent in Arabic, English and French

Since 2010

Since 2012

REFERENCES

Available upon request



Contact this candidate