Lorne Ernst

**** ******** ****., ****** *****, Michigan 48326

Cell: 248-***-**** / Email: adyig9@r.postjobfree.com

Senior Automotive Manufacturing (B.I.W. / O.E.M. – Tier One) Advanced Project Manager

Core Career Experience Overview:

Leader / Champion in management of responsibilities with full ‘Turn-Key’ operations for custom Process / Engineering, Automated Tooling and Flexible Robotic assemblies (Including but not limited to Product Transfer / Handling, Spot, MIG Weld, Rivet, Adhesive, Sealant applied applications), Including access abilities from stationary to 7th Axis motion positioning. B.I.W. / Chassis Components with Internal Framing, Including Specialized Component Hardware and Structural Components for all O.E.M. / Tier One services. High Experience and relevant to date with current assembly / management technologies and coordination’s Industrial wide!

Professional Experience and Accomplishments:

Classic Design / Systems, (Contracted by “Integrity Staffing Group, Inc.”). January 2022 – March 2022

Project Manager

After Layoff proceeded back to (Self Contracting Activities as Indicated below listed under ‘Self Contracting’)

‘G.M’. Research, Design & Development (R&D) for E/E Reconfiguration Robotic Cell - System to auto align E/E capturing Arms (10) per unit to reduce Press Operations from over (70+) current E/E Arms down to (2) E/E Arms for Hood and Fender OP’s.

In early March 2022 an INVESTMENT FIRM purchased Classic Design / Systems causing limitation of newer hires with just 7 weeks for myself on-duty and after my 8 weeks notified by my Operations Account Manager, Mark Reynolds that because of company purchase and being ‘part’ of newer hire employees required to be let go. Per my Supervisor Mr. Mark Reynolds who directly hired me and who I worked directly under and for …Stated this NOT his decision. “I provided my P.M. services well and at statistical levels throughout”. Also G.M. Representatives I provided my services for very happy with my performance, actions and keeping them well informed of system(s) statuses!

Self Contracting June 2020 / -2023 – Current

Project Manager (Including current Self Contracting Activities)

In Term only Not Exceeding. As required providing P.M. support services to ‘other’ firms in completing required Customer Actions / Relations, Documented / Management support tasks, Timing, E/C Requests and Profit / Loss updates Including full Reports to Upper Management on an as needed basis (per specialized Company / Supplier) only till …Personal full time hire obligations arise and provide to their required Activities and Standards!

Paslin Company, (Contracted by “Streamline HR”). February 2020 – May 2022

Project Manager

‘Rivian’ Electric Model Vehicle Program that ‘Paslin’ was assigned the entire Body Shop Assembly that Included R1T, Pickup / R1S, Sedan.

My assigned Programs: ‘RUB’ full Underbody Main and ‘RRF’ Rear Floor Main Systems.

Entire Body Shop Assembly assigned to be Installed up and running at Rivian’s completely refurbished Plant facility (prior Mitsubishi Factory Assembly) in Normal, Illinois.

NOTE: Laid off and as new hire due to the new Infectious “COVID-19” concerns which to date I personally never contracted. My assigned Program O.E.M. “Rivian” closed and postponed operations to future date. Note: Current Status: “Rivian” supported complete / in Production.

Gonzalez Production Systems October 2014 - September 2019

Advanced Manufacturing Project Manager

Ford automotive automated assemblies from DPA Reviews (Initial design processes reviews) for specific Project(s) i.e., Hoods, Doors, Roof, Decklids, Fenders, etc.

Engineering development reviews with customer for each complete Automated Assembly Tooling through final sign-off.

Followed into actual build applications, Tryouts, Part Runs and Buy-off of system(s) with customer including install timing and actual assigned Plant Installation of system(s) and Part runs through ‘Protag’ completion processes (Ford Motor).

Reviewed system developments constantly with customer and ‘formally’ with Bi-Weekly meetings reviewing SRS reports for system review and statuses

Internally on monthly bases within company completed ‘CTC’ reports to show current and forecasted costs to complete for percent profit margins.

Page: 1 of 2

Page: 2 of 2

TRW Automotive March 2012 – July 2012

Project Manager

Scheduled Initial pre-production of Ford P473 Caliper Brake Units for TRW’s Oakwood, GA. Assembly facility.

Assigned an already behind schedule retooling (8) major Assembly Systems with Sub Assembly ‘off-line’ fixtures Incorporating (3) Model change overs with production machining operations.

Managed field experts and contractors to revamp and excel processing back on schedule to meet Year One Production.

Integration and deliveries as a collaborative team pulled Ford Program on schedule and successfully launched customer required Year One Production of 520,000 P473 Brake component units.

Titan Global Properties, LLC December 2004 – March 2012 Project Manager

Primary Investment group personally assessing due diligence Investigations of Industrial manufacturing operations Instituting and lead corrective actions of ‘Invested’ company(s).

Provided leadership in operations management, Program management and oversee procurement activities.

Champion in developing business and operational plans, customer contracts with material / labor ratios, cost of business, policies, labor costs assessments / organization, etc.

Combine Tool Company May 1989 - February 2003

General Manager of Operations

Lead / champion all manufacturing operations in developing an array of Turn-Key ‘Tier One’ level automotive automation tooling / assembly systems for production of metal body structural parts, panels, components (B.I.W.) spot weld framing systems, flexible weld and other applied assembly applications.

Implement by Championing controlled guidelines, procedures, actions of all departments and Individuals optimizing each to their full potential as a collaborative ‘Team.’

Accomplish set phases and goals through each operation in building a highly successful, respected, cost competitive quality driven company with ever expanding O.E.M. & Tier One customer base.

Education:

Northwestern Michigan. ‘Technical Design / Engineering’, Bachelor of Science. May, 1983.

Most Recent ‘Main’ Contact References: Note: Other Customer applied References available per request.

*Classic Design / Systems. Mr. Mark Reynolds, G.M. Account Manager. Mobile: 810-***-****, Main Office: 248-***-****.

Email: adyig9@r.postjobfree.com

*Gonzalez Production Systems. Mr. Tony Varilone, V.P. / Chief Program Manager. Mobile: 248-***-****,

Main Office: 248-***-****.

Email: adyig9@r.postjobfree.com

*PASLIN. Mr. John Tomalavage, Director of Controls Design / Program Managing Support. Mobile: 586-***-****.