Post Job Free

Resume

Sign in

Maintenance Manager Set Up

Location:
Fort Worth, TX
Posted:
July 23, 2023

Contact this candidate

Resume:

Alan Wittneben

**** *********** ** **** 682-***-****

Fort Worth, Tx. 76177

E-mail adyha1@r.postjobfree.com

Alan K. Wittneben

Objective

To obtain a Manager position that will enable me to utilize my knowledge and experience to benefit my employer, and to achieve my goals.

Experience

Retired May 2016 - Current

Building a porch including electrical and plumbing

Driving for lyft

Consulting with bottling manufacturers ( Coke- Cott )

Cott Beverage Fort Worth Tx. August 2014 – May 2016

Maintenance Manager – Production – Operations Manager

Cut the Maintenance parts inventory by over $170,000.00

Created 12hrs shifts in the maintenance department to better manage the business

Started up PNC maintenance program to manage the operation

Increase line efficiency from 15%-19% to over 50%

Country Pure Foods Deland, FL August 2008 – July 2014

Maintenance Manager

Have completed over 85 capital Projects

Managed many plant budgets

Have implement maintenance program MP2

Have increased production from 5 million to over 11 million cases a year

Increased line efficiency from 30-40% to 0ver 65%

National Gypsum Corp Tampa, FL August 2006 –August 2008

Maintenance Manager

Reduced unplanned down time

Manage various plant budgets

Have completed over 20 capital projects

Established and continue to manage the ABB Maintenance System

Instrumental in getting the plant running efficiently which resulted in receiving profit sharing during three quarters of 2007 – the first time in over seven years

Florida Coca-Cola Bottling Company Tampa FL 1999 – November 2005

Maintenance Manager, (Production Manager)

President’s Cup 2002, 2003

Increased plant efficiency from 70% to 94% over a three year plan

Rebuild a Trine 6500 Labeler, installed a PLC for controls

Installed a second labeler on 2LT line increasing efficiency over 10%

Rebuilt two PAI palletizers to control operations increasing line efficiency by over 15%

Installed a deairator in the child water line cutting down our oxygen mixture

Redesigned line plan to make it more operator friendly-reduced operators by two per line

Redesigned the parts room as well as parts used.

Install and design a Nitrogen system on multiple lines. This lay out was adopted and is now used by most CCE plants.

Installed sky lights in the production area to cut power used.

Installed lights sensors through out the plant cutting power used by 21%. Pay back on sky lights and sensors were two years.

Set up different start up time for the shifts and lines in order to cut the power company peak rate charge for usage. Saved about 7%

Installed a Data Highway system for all PLC and control systems.

Responsible for seven departmental plant budgets

Safety coordinator

International Home Foods Inc. Milton, PA 1998-1999

(Chef–Boy-ar-dee Guilden Mustard Bumble Bee Seafood Campfire Marshmallows Luck’s Foods )

Supervisor Engineering Operations

Supervisor a staff of over 70 engineering personal

Responsible for all capital projects and their budgets

Setup and implemented preventive maintenance program (T.P.M.).

Installation of a sub station

Responsible for waste water treatment

Liaison with state Hazardous Department

Work with the U.S.D.A. inspector to correct any problems

First Quality Hygienic, Inc. McElhatten, PA 1996 - 1998

Maintenance Manager/ Project Manager

Responsible for all Machine Maintenance, Capital Project Management, Engineering and Building Maintenance

Responsible for maintenance, parts, and capital project budgets

Setup and implemented preventive maintenance program. (T.P.M.)

Setup parts room and accounting parts system

Made over 70 Engineering changes in six months

Improved machine efficiencies from 40% to 85%

Installed, debugged and qualified 14 new machines in six months

Started from a six person department to over twenty-four, on a three shift operation

Worked with outside Engineering for the development on a new type of winding and core cutting machine

Assist in the set up and implementation the I.S.O. 9000 program

Set up and maintain our pneumatic system

Redesigned the piping of our pneumatic system

Tambrands Inc. Rutland, VT 1990 - 1996

Maintenance Supervisor, Production Supervisor

Set up, troubleshoot and programmed Robotic controlled packing areas

Developed a 12 hour maintenance team to cut down on unscheduled machine down time

Was contact person for the Workman’s Compensation employees. I worked closely with CRA, human resources and employees returning to work after an accident or Carpal Tunnel Syndrome surgery.

Worked with and through FDA regulations and audits.

Involved in developing online inspection program.

Set up the preventive maintenance program.

Direct overall assignment of work in manufacturing area.-- annual budget of over 1.1.M.

Have achieved 100% of production schedules while increasing production efficiency through analysis and action plans.

Reduced scrap to below minimum requirements.

Worked on and with several safety programs, and presented them to the hourly workers

Supervisor a 35 person maintenance team

Other Experience

Inn of the Six Mountain – Building Maintenance Supervisor 1990 - 1991

Wittneben Inc.- Automatic Laundry/ Dry Cleaning, Diamond Uniform Rental 1980 - 1990 Business Manager

Champion Dairy-Pak 1973 - 1980

Foreman-Leadsman

Education

New Hampshire Tech. College - Electric Circuits - Geometry - Trigonometry - P.L.C.

1971 – 1974 Newark College of Engineering, New Jersey

Electrical Engineering

Management Seminars

The One Minute Manager and How to put it to Work

How to Manage People Coping with Anger and Emotions

Management Skills for Supervisors

Many Computer Workshops

Zinger Miller

Dale Carnegie Management Seminar

Six Sigma

Computer Skills

Microsoft Word and Excel

Microsoft Projects

C.A.D.

A.S. 400

Kronos Time Keeper System



Contact this candidate