Post Job Free

Resume

Sign in

Project Client

Location:
Cairo, Cairo Governorate, Egypt
Salary:
50k / month
Posted:
July 23, 2023

Contact this candidate

Resume:

CURRICULUMVITAE

NAME: AMIRSAMIRIBRAHIMHAMAD

TELEPHONE: Mobile(Egypt):+20-111*******

+20-100*******

EMAIL: amirsamirhamad@gmailcom Work

adyg7e@r.postjobfree.com Personale

DATEOFBIRTH 25/4/1979

Position:PlantInspectorEngineer

Summary

WorkingasaQualityAssuranceandQualityControlEngineersince2004,mainlyin thefieldofconstructionofoilandgasplants,powerplantandrefineries;involvedasa Welding/MechanicalQCEngineerduringassemblyandweldingofSteelStructural,piping fabricationanderection,undergroundpipelines;Testpackages(Hydrostatic/Pneumatic) compilationPackagepreparationanddocumentationreview;CompletePunchlistingofthe testsystemstoverifyitscompliancetodrawingsandspecifications

WorkasMechanical/PipelineQA/QCEngineerAPI1104onshore/offshoreDNVF101

HeatExchangerandseparatorExaminationandmaintenance

AlPressurevesselsfabricationexaminationsandQA/QCactivity

Folow-upforpunchlistitemsclearanceforreleasetotesting.Re-instatementof thetestedloop-verificationofremovalofaltestingspades,re-instalationofdroppeddown valves,strainers...etc,andfinalhandoverofthesystempriorpre-commissioning.

Qualitycontrolduringpipingprefabricationworkshops,coordinationforpiping spoolsreleaseforfurtheractivities;preparationandreviewingofWeldingProcedure specifications,reviewingofPQRsdocumentsunderdifferentConstructionandWeldingCodes requirements(ASMEB31.3,ASMEVIII,ASMEIX,AWSD1.1,API1104,API650/653)andproject specifications(ENPPI)involvingdifferentmaterialweldingandservices.

VerificationoflocalPostWeldingHeatTreatmentinpiping,radiographicfilms interpretation,togetherwithotherNDTmethods.

AsQualityAssuranceengineer,involvedinpreparationofQualityAssurance/ ControlProceduresasperproject’sspecificationsandinternationalstandards,preparationof InspectionandTestPlansaccordingtoprojectrequirements.

Performinginternalauditsonalprojectdepartments.

After2010,workedasQCHeadonseveralprojectinEgyptandabroad"Iraq- Basra".

InELNG,workedasQCHeadon“WasteHeatRecovery“projectforpowerplant

"Gasturbine".

WorkedthroughEMC-egascontractorforShelinseveralgasplantsinBasrato restarttheplantbyinspectingandmaintainingpipelineandequipment"Gasfireseparator, watercoolerandpressurevessel”.

Education/Qualifications/Affiliations

B.SC,inMECHANICALENGINEERINGfromAlexandriaUniversity, A.R.E.2003

InternationalCertifications

API510CertificationNo.71268

SeniorWeldingInspectorCSWIP3.2.2No.52253/2

BGAS/CSWIPNo.339031

CertifiedLevel-IIASNTNDTMethods(RT,UT,MT,PTandVT)

MFLCourse

CertifiedQSMISO9001:2015

Familiarwith:ASMEB31.1,B31.3,5,8and9,DNV&API510,570,1104

&653alongwithISO18001

SafetyFoundation(Petrofac)

FirstAidTrainingCoursefromIraqISOHS

CertificateofAppreciationofEgyptianLNGHSEDepartment ProfessionalExperience

WorkasRepresentativeof(EMC,TUV,SGS&RINA)

Date September2022TilNow

Client PetrogulfMisr(PGM)

Project NEWGNNFIELDDEVELOPMENT

PROJECTPHASE1EARLYPRODUCTIONFACILITIES

Role Piping&MechanicalQA/QCEngineer(RINARep.)

Description MaterialsSS&CS

WorkasCertifiedAuthorityQA/QCEngineer

Verifiedweldprocedureandmaterialasperspectobeused,witnessandReviewalWelding, Cutting,RolingforPlateandPips,JacketTemplateInstalationandpilesLevelingReading,Issue NCRifnecessary,Reviewpackagebeforetest,monitortheHydrostatictestaccordingDNVF101 forPipelineandASME31.3FORPiping

Date March2022TilSeptember2022

Client Shel

Project SurveyIntegrityInspection

Role PlantInspectorEngineerTUVRep

Description MaterialsSS&CS

LeadingateamtoHandling,MonitoringactivityandEvaluatereading MeasuringthicknessofalpipesandVisualInspectionaccordingtoclientrequirements. ApplyalNDTrequired.

Date June2021 tilMarch2022

Client (AlexandriaPetroleumCompany)APC

Project ConstructionofOilStorageTankM3

Role QA/QCandMechanicalInspectorEngineer

Description Materialsused:A37C.S.

ReceivingmaterialaccordingtoMTOandspecificationcodes Insurethatalactivityrunningaccordingtoandproceduresandprojecttimeschedules ApplyalNDTrequiredintime

Verifycodeforanymodificationneedsduringproject

Date November2019 tilJune2021

Client ETHYDCO(TheEgyptianEthyleneandDerivativesCompany) Project ConstructionofraffinateTank

Role QA/QCandMechanicalInspectorEngineer

Description Materialused:ASTMA283GR.C

ReceivingmaterialaccordingtoMTOandspecificationcodes Insurethatalactivityrunningaccordingtoandproceduresandprojecttimeschedules ApplyalNDTrequiredintime

Date June2019til November2019

Client DESUCO

Project Commissioningandstartupfornewgasplantfor

Role Pipeline/MechanicalQA/QCandCommissioningEngineer Description VerifythatalNDTexamination,Reinstatement.Pressuretest.Flushing,CleaningandFlange managementhasbeendoneforalloopsandpackagescompleted. WalkthroughonaltheplanttoinsurethatanyNCRneedtobedoneandclearitemsclosedbefore commission

Date June2018tilJune2019

Client Gasco

Project In-servicesInspectioninGasPlantforsphericalandPressureVessel Role QA/QCManager

Description CalculateCorrosionRateandcorrectionactionforPipingandPressureVesseltested. Chosesuitablerepairerprocedurefordamageareas

Chosesuitablepaintingsystemfordifferentmaterialsworkcondition Date Feb2018tilJune2018

Client ENIatBasra,Iraq

Project ZubairOilFiled-WaterInjectionNetworkInstalation Role SeniorQA/QCEngineer

Description FolowtheproceduresandITPonWeldingworkshopandinstalationpipingonsiteafter radiographtestandotherNDTrequires

Date December2017tilFeb2018

Client JordanBromineCompany(JBC)(AlbemarleCorporation&JordanGovernment) Project FulShut-DownforUpsizingCompanyproduction

Role SeniorQA/QC&Pre-commissioningEngineer

Description Workas3rdpartyforJordanBromineCompany(JBC) Insurethatalpackagearecomplete,Equipments&Vesselsfulinspectedandal reportswasdoneandNCRcleared

Date Jan2017tilDecember2017

Client AbuQirPetroleumCompany

Project 1- ReplacementofDe-propanizerTower

2- InstalationoflowRe-boilerHeaterH-201&NewFlashDrum 3- InstalationofLowPressureManifoldatWel5&

6(offshore)

Role SeniorQA/QCEngineer

Description MaterialUsedduringproject:A106GrB,API5LGRB,A53GRB,A333Gr6andUNSC70600 WorkingasWorkshopManagerandsitemechanicalinspector Radiographinterpretation,pressuretestappliedandFerritetestforDuplex Date Jan2016tilDecember2016

Client ETHYDCO(TheEgyptianEthyleneandDerivativesCompany) Project PermanentPowerPlant(70MW)

Role QA/QCHead

Description Materialused:A790,A333GR6,106GRB,API5LAndA312TP316L AlPipingWelding,SteelStructuresErection,Insulation,rapping,PaintingandQCtestingandQAauditwas accomplishundermysupervision

Date September2015tilJan2016

Client SAIPEM/EXXON-MOBILE(Basra,Iraq)

Project MainOutfalDrain(MOD)IntakeandFacilitiesWESTQURNAI(IRAQ) Role SeniorPipelineQA/QCEngineer

Description AlWelding,PaintingandWorkshopmanagerialactivityundermydirectly RepresentasQAEngineerduringexternalauditbySaipemonEMCWorkshop TrainingIraqiweldersatEMCworkshopascooperationbetweenEgyptianCompaniesandIraqi GovernmenttoemploymentIraqiweldersinprojectsatBasra Date March2015tilSeptember2015

Client AbuQirPetroleumCompany

Project 1- ReplacementFoamSystemPipes

2- GasMeteringSkidPipesfabrication

3- De-rattingcalculationforVesselV5andInternalInspection Role SeniorQCEngineer

Description WeldingInspectorforweldingandmechanicalactivity PressureVesselInspection(thicknessmm270barMaterialSa516Gr.70) Date 9/2014til3/2015

Client Shel(Basra,Iraq)

Project Maintenanceof5GasplantsforRestarting(2inElzobir,2inHammarandplant inMarkzia)

Role leaderQCEngineer

Description WorkasShelRep.Duringrestartingactivity(Repair,testandstartupplant PressureVesselInspectionExternalandInternalinspection Date Jan2013tilSeptember2014

Client EgyptLNG

Project WasteHeatRecoveryforPowerPlanet

Role QCManager

Description Materialusedduringproject:A106GrB,SA312TP304andER309L,ERNICR.3 Welding,Testing,QCactivityandcompletepackageforpipingfabricationanderection(NSRclear

)andFlangeManagement

RadiographicinterpretationandUltrasonictest

Date July2012tilDecember2012

Client WEPCO

Project InstalationandTie-inPipingforNewOilPump

Role SeniorQCEngineer

Description Materialusedduringproject:

Welding,Testing,QCactivityandcompletepackageforpipingfabricationanderection(NSRclear

)andFlangeManagement

RadiographicinterpretationandUltrasonictest

Date November2011tilJuly2012

Client AmmriaPetroleumcompany

Project Instalationanderectionwaterstoragetankandpipesconnection Role QA/QCEngineer

Description MechanicalandWeldinginspection

Materialinspectionandwelderweldingproceduretesting Radio-graphicinterpretationandUltrasonictest

Date Jan2011tilNovember2011

Client Khaldacom.IncorporationwithApache

Project InstalationofOilandGasFlowlines8"&6"

Role Pipeline&MechanicalQA/QCEngineer

Description MechanicalandWeldinginspection

Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation

HydrostatictestforpipelineaccordingtoAPI1104

Date June2010tilJan2011

Client MisrPetroleum

Project Instalationanderection4gasolinestoragetankandpipeconnectionfor Role QA/QCEngineer

Description MechanicalandWeldinginspection

Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation

Date Jan2008toJune2010

Client ABUQIRPETROLEUM

Project 1)ReplacementofFireFightingNetworkwithnewone(Cu-NiAloy) 2)Replacementof18and12leakedvalves(APIX52)

3)InstalandErectionDirectFireHeater(H1G)

Role QA/QCEngineer

Description MaterialUsed:UNSC70600

MechanicalandWeldinginspection

Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation

Date March2007tilDecember2007

Client SUMED

Project 1)Replacement1km/42"pipeline

2)Repair30km/42"

Role QA/QCEngineer

Description MechanicalandWeldinginspection

Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation

Date September2006tilMarh2007

Client EGYPTIANMAINTENANCECOMPANY

Project EMCWorkshopatSuez

Role WorkshopQCManager

Description MaterialUsed:SSandCS

Teamleaderoftestingoffabricationpressurevessel

MechanicalandWeldingQCManager

Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation

MRR

Freshgraduatingengineertraining

Date September2005tilSeptember2006

Client Petrobel

Project 1-Serviceagreement(Inspection&Construction) 2-InstalandErectionNewDuelTurbine

WeldingandMechanicalEngineer Role

Description MaterialUsed:SSandCS

HeatExchangerandseparatorExamination

MechanicalandWeldingQCEngineer

Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation

Date March2004tilSeptember2005

Client WEPCO(AbuQirPetroleum)

Project InstalandErectionDirectFireHeater(H1F)

Role WeldingandMechanicalEngineer

Description FlowTimescheduleandactivity

MangeWorksassiteEngineerandattendmeetingwithclient



Contact this candidate