CURRICULUMVITAE
NAME: AMIRSAMIRIBRAHIMHAMAD
TELEPHONE: Mobile(Egypt):+20-111*******
EMAIL: amirsamirhamad@gmailcom Work
adyg7e@r.postjobfree.com Personale
DATEOFBIRTH 25/4/1979
Position:PlantInspectorEngineer
Summary
WorkingasaQualityAssuranceandQualityControlEngineersince2004,mainlyin thefieldofconstructionofoilandgasplants,powerplantandrefineries;involvedasa Welding/MechanicalQCEngineerduringassemblyandweldingofSteelStructural,piping fabricationanderection,undergroundpipelines;Testpackages(Hydrostatic/Pneumatic) compilationPackagepreparationanddocumentationreview;CompletePunchlistingofthe testsystemstoverifyitscompliancetodrawingsandspecifications
WorkasMechanical/PipelineQA/QCEngineerAPI1104onshore/offshoreDNVF101
HeatExchangerandseparatorExaminationandmaintenance
AlPressurevesselsfabricationexaminationsandQA/QCactivity
Folow-upforpunchlistitemsclearanceforreleasetotesting.Re-instatementof thetestedloop-verificationofremovalofaltestingspades,re-instalationofdroppeddown valves,strainers...etc,andfinalhandoverofthesystempriorpre-commissioning.
Qualitycontrolduringpipingprefabricationworkshops,coordinationforpiping spoolsreleaseforfurtheractivities;preparationandreviewingofWeldingProcedure specifications,reviewingofPQRsdocumentsunderdifferentConstructionandWeldingCodes requirements(ASMEB31.3,ASMEVIII,ASMEIX,AWSD1.1,API1104,API650/653)andproject specifications(ENPPI)involvingdifferentmaterialweldingandservices.
VerificationoflocalPostWeldingHeatTreatmentinpiping,radiographicfilms interpretation,togetherwithotherNDTmethods.
AsQualityAssuranceengineer,involvedinpreparationofQualityAssurance/ ControlProceduresasperproject’sspecificationsandinternationalstandards,preparationof InspectionandTestPlansaccordingtoprojectrequirements.
Performinginternalauditsonalprojectdepartments.
After2010,workedasQCHeadonseveralprojectinEgyptandabroad"Iraq- Basra".
InELNG,workedasQCHeadon“WasteHeatRecovery“projectforpowerplant
"Gasturbine".
WorkedthroughEMC-egascontractorforShelinseveralgasplantsinBasrato restarttheplantbyinspectingandmaintainingpipelineandequipment"Gasfireseparator, watercoolerandpressurevessel”.
Education/Qualifications/Affiliations
B.SC,inMECHANICALENGINEERINGfromAlexandriaUniversity, A.R.E.2003
InternationalCertifications
API510CertificationNo.71268
SeniorWeldingInspectorCSWIP3.2.2No.52253/2
BGAS/CSWIPNo.339031
CertifiedLevel-IIASNTNDTMethods(RT,UT,MT,PTandVT)
MFLCourse
CertifiedQSMISO9001:2015
Familiarwith:ASMEB31.1,B31.3,5,8and9,DNV&API510,570,1104
&653alongwithISO18001
SafetyFoundation(Petrofac)
FirstAidTrainingCoursefromIraqISOHS
CertificateofAppreciationofEgyptianLNGHSEDepartment ProfessionalExperience
WorkasRepresentativeof(EMC,TUV,SGS&RINA)
Date September2022TilNow
Client PetrogulfMisr(PGM)
Project NEWGNNFIELDDEVELOPMENT
PROJECTPHASE1EARLYPRODUCTIONFACILITIES
Role Piping&MechanicalQA/QCEngineer(RINARep.)
Description MaterialsSS&CS
WorkasCertifiedAuthorityQA/QCEngineer
Verifiedweldprocedureandmaterialasperspectobeused,witnessandReviewalWelding, Cutting,RolingforPlateandPips,JacketTemplateInstalationandpilesLevelingReading,Issue NCRifnecessary,Reviewpackagebeforetest,monitortheHydrostatictestaccordingDNVF101 forPipelineandASME31.3FORPiping
Date March2022TilSeptember2022
Client Shel
Project SurveyIntegrityInspection
Role PlantInspectorEngineerTUVRep
Description MaterialsSS&CS
LeadingateamtoHandling,MonitoringactivityandEvaluatereading MeasuringthicknessofalpipesandVisualInspectionaccordingtoclientrequirements. ApplyalNDTrequired.
Date June2021 tilMarch2022
Client (AlexandriaPetroleumCompany)APC
Project ConstructionofOilStorageTankM3
Role QA/QCandMechanicalInspectorEngineer
Description Materialsused:A37C.S.
ReceivingmaterialaccordingtoMTOandspecificationcodes Insurethatalactivityrunningaccordingtoandproceduresandprojecttimeschedules ApplyalNDTrequiredintime
Verifycodeforanymodificationneedsduringproject
Date November2019 tilJune2021
Client ETHYDCO(TheEgyptianEthyleneandDerivativesCompany) Project ConstructionofraffinateTank
Role QA/QCandMechanicalInspectorEngineer
Description Materialused:ASTMA283GR.C
ReceivingmaterialaccordingtoMTOandspecificationcodes Insurethatalactivityrunningaccordingtoandproceduresandprojecttimeschedules ApplyalNDTrequiredintime
Date June2019til November2019
Client DESUCO
Project Commissioningandstartupfornewgasplantfor
Role Pipeline/MechanicalQA/QCandCommissioningEngineer Description VerifythatalNDTexamination,Reinstatement.Pressuretest.Flushing,CleaningandFlange managementhasbeendoneforalloopsandpackagescompleted. WalkthroughonaltheplanttoinsurethatanyNCRneedtobedoneandclearitemsclosedbefore commission
Date June2018tilJune2019
Client Gasco
Project In-servicesInspectioninGasPlantforsphericalandPressureVessel Role QA/QCManager
Description CalculateCorrosionRateandcorrectionactionforPipingandPressureVesseltested. Chosesuitablerepairerprocedurefordamageareas
Chosesuitablepaintingsystemfordifferentmaterialsworkcondition Date Feb2018tilJune2018
Client ENIatBasra,Iraq
Project ZubairOilFiled-WaterInjectionNetworkInstalation Role SeniorQA/QCEngineer
Description FolowtheproceduresandITPonWeldingworkshopandinstalationpipingonsiteafter radiographtestandotherNDTrequires
Date December2017tilFeb2018
Client JordanBromineCompany(JBC)(AlbemarleCorporation&JordanGovernment) Project FulShut-DownforUpsizingCompanyproduction
Role SeniorQA/QC&Pre-commissioningEngineer
Description Workas3rdpartyforJordanBromineCompany(JBC) Insurethatalpackagearecomplete,Equipments&Vesselsfulinspectedandal reportswasdoneandNCRcleared
Date Jan2017tilDecember2017
Client AbuQirPetroleumCompany
Project 1- ReplacementofDe-propanizerTower
2- InstalationoflowRe-boilerHeaterH-201&NewFlashDrum 3- InstalationofLowPressureManifoldatWel5&
6(offshore)
Role SeniorQA/QCEngineer
Description MaterialUsedduringproject:A106GrB,API5LGRB,A53GRB,A333Gr6andUNSC70600 WorkingasWorkshopManagerandsitemechanicalinspector Radiographinterpretation,pressuretestappliedandFerritetestforDuplex Date Jan2016tilDecember2016
Client ETHYDCO(TheEgyptianEthyleneandDerivativesCompany) Project PermanentPowerPlant(70MW)
Role QA/QCHead
Description Materialused:A790,A333GR6,106GRB,API5LAndA312TP316L AlPipingWelding,SteelStructuresErection,Insulation,rapping,PaintingandQCtestingandQAauditwas accomplishundermysupervision
Date September2015tilJan2016
Client SAIPEM/EXXON-MOBILE(Basra,Iraq)
Project MainOutfalDrain(MOD)IntakeandFacilitiesWESTQURNAI(IRAQ) Role SeniorPipelineQA/QCEngineer
Description AlWelding,PaintingandWorkshopmanagerialactivityundermydirectly RepresentasQAEngineerduringexternalauditbySaipemonEMCWorkshop TrainingIraqiweldersatEMCworkshopascooperationbetweenEgyptianCompaniesandIraqi GovernmenttoemploymentIraqiweldersinprojectsatBasra Date March2015tilSeptember2015
Client AbuQirPetroleumCompany
Project 1- ReplacementFoamSystemPipes
2- GasMeteringSkidPipesfabrication
3- De-rattingcalculationforVesselV5andInternalInspection Role SeniorQCEngineer
Description WeldingInspectorforweldingandmechanicalactivity PressureVesselInspection(thicknessmm270barMaterialSa516Gr.70) Date 9/2014til3/2015
Client Shel(Basra,Iraq)
Project Maintenanceof5GasplantsforRestarting(2inElzobir,2inHammarandplant inMarkzia)
Role leaderQCEngineer
Description WorkasShelRep.Duringrestartingactivity(Repair,testandstartupplant PressureVesselInspectionExternalandInternalinspection Date Jan2013tilSeptember2014
Client EgyptLNG
Project WasteHeatRecoveryforPowerPlanet
Role QCManager
Description Materialusedduringproject:A106GrB,SA312TP304andER309L,ERNICR.3 Welding,Testing,QCactivityandcompletepackageforpipingfabricationanderection(NSRclear
)andFlangeManagement
RadiographicinterpretationandUltrasonictest
Date July2012tilDecember2012
Client WEPCO
Project InstalationandTie-inPipingforNewOilPump
Role SeniorQCEngineer
Description Materialusedduringproject:
Welding,Testing,QCactivityandcompletepackageforpipingfabricationanderection(NSRclear
)andFlangeManagement
RadiographicinterpretationandUltrasonictest
Date November2011tilJuly2012
Client AmmriaPetroleumcompany
Project Instalationanderectionwaterstoragetankandpipesconnection Role QA/QCEngineer
Description MechanicalandWeldinginspection
Materialinspectionandwelderweldingproceduretesting Radio-graphicinterpretationandUltrasonictest
Date Jan2011tilNovember2011
Client Khaldacom.IncorporationwithApache
Project InstalationofOilandGasFlowlines8"&6"
Role Pipeline&MechanicalQA/QCEngineer
Description MechanicalandWeldinginspection
Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation
HydrostatictestforpipelineaccordingtoAPI1104
Date June2010tilJan2011
Client MisrPetroleum
Project Instalationanderection4gasolinestoragetankandpipeconnectionfor Role QA/QCEngineer
Description MechanicalandWeldinginspection
Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation
Date Jan2008toJune2010
Client ABUQIRPETROLEUM
Project 1)ReplacementofFireFightingNetworkwithnewone(Cu-NiAloy) 2)Replacementof18and12leakedvalves(APIX52)
3)InstalandErectionDirectFireHeater(H1G)
Role QA/QCEngineer
Description MaterialUsed:UNSC70600
MechanicalandWeldinginspection
Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation
Date March2007tilDecember2007
Client SUMED
Project 1)Replacement1km/42"pipeline
2)Repair30km/42"
Role QA/QCEngineer
Description MechanicalandWeldinginspection
Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation
Date September2006tilMarh2007
Client EGYPTIANMAINTENANCECOMPANY
Project EMCWorkshopatSuez
Role WorkshopQCManager
Description MaterialUsed:SSandCS
Teamleaderoftestingoffabricationpressurevessel
MechanicalandWeldingQCManager
Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation
MRR
Freshgraduatingengineertraining
Date September2005tilSeptember2006
Client Petrobel
Project 1-Serviceagreement(Inspection&Construction) 2-InstalandErectionNewDuelTurbine
WeldingandMechanicalEngineer Role
Description MaterialUsed:SSandCS
HeatExchangerandseparatorExamination
MechanicalandWeldingQCEngineer
Materialinspectionandwelderweldingproceduretesting VisualandRadiographicinterpretation
Date March2004tilSeptember2005
Client WEPCO(AbuQirPetroleum)
Project InstalandErectionDirectFireHeater(H1F)
Role WeldingandMechanicalEngineer
Description FlowTimescheduleandactivity
MangeWorksassiteEngineerandattendmeetingwithclient