Post Job Free

Resume

Sign in

Front End Engineering Design

Location:
Al Dafna, Qatar
Posted:
July 16, 2023

Contact this candidate

Resume:

CLASSIFICATION: C* - NON-CONFIDENTIAL

RESUME

LEAD INSTRUMENTATION AND CONTROL /TELECOMS ENGR

NAME : EMEKA NILLARD ERUGO

DATE OF BIRTH : 25TH OCT 1974

MARITAL STATUS : MARRIED

NO OF CHILDREN : 4

AGES OF CHILDREN : YEARS (16, 15, 11 & 7)

NATIONALITY : NIGERIAN

ADDRESS : NO 12 WILLIAMS ONOH, CHEVRON ESTATE, LEKKI, LAGOS EMAIL 1 : adycbx@r.postjobfree.com

EMAIL 2 : adycbx@r.postjobfree.com

MOBILE : +234**********

QAULIFICATION : B.ENG (Hons) Elect/Electronic Engineering UNIVERSITY : ENUGU STATE UNIVERSITY OF SCIENCE & TECHNOLOGY

Nigeria 1997

CERTIFICATION : TUV SIS (REINLAND)

MEMBERSHIP : INSTRUMENT SOCIETY OF AMERICA (ISA MEMBER NO.33069742) SUMMARY OF EXPERIENCE

S/N Company Start

Date

Finish

Date

Designation

1 ANOH Gas Processing Company

(AGPC)-Seplat petroleum

July 2019 Till Date Lead Inst. Control/Telecoms Engr. 2 Petroleum Development Company Oman July 2014 June 2019 Instrumentation, Control

&Automation Engr.

3 Petrofac -Lagos Nigeria/UK April

2013

June 2014 Principal Instrumentation Engr

4 Total Upstream-Offshore Nigeria July 2011 March 2013 Lead Instrumentation Engr 5 Shell Petroleum Dev. Company-Nigeria May 2006 June 2011 Senior Instr. Control/Telecomms Engr

6 Point Engineering-Port Harcourt -Nigeria July 2004 April 2006 Senior Instrumentation Engr 7 Sudelletra-Portharcourt Nigeria March

2002

May 2004 Instrument & Control Engr

8 Craymond –Portharcourt Nigeria March

2001

April 2004 Head Instrument & Electrical Engr

EXPERIENCE

ROLES/RESPONSIBILITIES

Instrumentation, control and Telecomms Engineer responsible for all instrumentation, control, Metering systems and Telecoms from Front End Design stage through Tendering, Detailed Design, Construction and Precom/Commissioning,startup and field operations. To manage commissioning, project handover and interface with package and system vendors. Implement new technologies and train young engineers as part of continuous improvement. To Manage ANOH Project Instrument and Telecomms Contractors/Vendors eg GPS dubai, Emerson ICSS-dubai Fiscal Metering packages-ODS Dubai and Baker hugdes packages -Italy and Telecomms Engineering contractors -Philips projects/Aestherix Dubai etc and construction contractors including subcontractors to realise project objectives and on time, quality delivery to project specifications and company standards. Provide support to EMEKA NILLARD ERUGO PAGE - 2

CLASSIFICATION: C0 - NON-CONFIDENTIAL

ICSS operations team. To plan, control and monitor project resources, interfaces and budgets. Participate in key technical assurance and technical reviews such as HAZID, HAZOP, PSSR,3D models, Mapping studies, Prestart-up Audits, ORPR /CPR, IPF/SIL/ALARM rationalisation etc. EXPERIENCE PROFILE

Instrumentation and Control Systems, Metering systems, Telecoms & Field operations

(ENGINEERING DESIGN, INSTALLATION & PRECOMM/COMMISSIONING-OIL AND GAS PLANTS)

20 years of professional experience in Instrumentation, Control and Automation and safety systems, (ICSS) & Telecoms Systems for Oil & Gas projects. Worked on several project and ensured compliance with industry codes and standards as well as company policies and procedures. Ability to manage Technical reviews such as HAZID/HAZOP, SAFOP, SIL /Alarm management and reporting for company. A strong all-round Control and Automation Engineer with experience in selection of field instruments (Field bus or HART/Wireless), DCS/PAS /ICSS systems architecture, analyser’s, oil & Gas metering system, fire and gas /package equipment’s, sizing calculations for flow meters and control valves. CCTV, Access control, PAGA, FOC, Structured cabling, LAN/WAN, PIDS/PFIDS (OPTASENSE),GSM /Tetra Mobile, UPS, Digital microwave radios Base station.SMOPS,LLI,BOMS,Datasheets,specification,layouts,Document reviews,FAT,IFAT,SAT etc. FOPP, Switches, cables, workstations, servers etc. Focal point for all Instrumentation and Telecomms Pre-commissioning/ Commissioning subsystems and start up

,performance test activities. Such as PM routines,CMMS,spares, Punchlist, equipment SAT, Function checks, loop checks, operations and maintenance manuals, SAP,redline mark-up, As-builts Have the ability to understand project requirements and able to deliver user requirement specifications which translate into clear and workable project descriptions.

Have Skills to oversee integration and delivery gained from green field & brown field project experience. An achiever with great project objective focus and the drive to ensure successful conclusion of projects, yet having an easy going nature with a good sense of humour and the patience, experience and understanding required to work and communicate at all levels and disciplines.

Proven record of accomplishment in large green field and brown field projects. Good leadership complemented by creative and organisational abilities. Excellent communication skills and fluency in English. Committed and motivated towards personal success and to deliver business growth against key measurable targets and objectives. Highly confident with determination to complete tasks successfully. Experience with Shell DEP, IEC, ISA etc standards . ANOH GAS PROCESSING COMPANY NIG LIMITED LAGOS • Nigeria • July 2019 – till Date LEAD INST. CONTROL/TELECOM ENGINEER

Responsible for all instrumentation, controls and Telecomms matters for ANOH Gas plant. Provide first line instrumentation, controls and Telecomms engineering expertise in the development of proposals for ANOH gas plant equipment and systems. Carry out technical reviews of control and instrument specifications, philosophies, datasheets and drawings for all field instruments, Meterings, telecoms equipment’s, sizing calculations, MTOs, location drawings,cable schedules, routing, General instrument specification. Loop diagrams, hooked-up drawings, long lead items.

Provide specialist support in all aspect of control and instrumentation engineering for the company. Work includes ICSS instrumentation and Precommissioning and Commissioning subsystems and start up, performance test activities. Such as spares, Punchlist, equipment SAT, Function checks, loop checks, operations manuals, redline mark- up, As builts, Precom /Commissioning Dosiers, PSSR and Audits and project handover and close out reports. Review and check, 3rd Party Equipment’s, instrument and ICSS engineering documents produced for FEED, detailed engineering, procurement, construction, and commissioning to ensure compliance to international design codes and best engineering practices.

EMEKA NILLARD ERUGO PAGE - 3

CLASSIFICATION: C0 - NON-CONFIDENTIAL

Review and checking of project engineering design for instruments, CCTV/PAGA/ACCESS control, PABX, Telecom Tower, LAN/WAN systems, FOC, structured cablings, radios, base station, PIDS/PFIDS etc. Metering and ICSS standards philosophies and specifications for ANOH Gas plant and ensure consistency and adequacy. Challenge the engineering, procurement, construction and commissioning activities, DCS, ESD, F&G and field instrument system to ensure compliance with project specifications and standards. Supervise the Senior ICSS Engineer and ensure efficient and smooth workflow. Provide engineering support to his directly reporting staff and distribute the workload to within his team to ensure proper coverage. Support process engineers and other disciplines in developing safe and efficient process control systems in accordance with the basis of design and project standards and specifications. Attend engineering reviews and studies at contractors or vendors offices/shops including in DUBAI and ITALY HAZOP, SIL, SAFOP, HAZID, PSSR, SIMOPS etc.

Attend EMERSON ICSS FAT and SAT in Nigeria of systems as required. Provide field engineering support during the construction phase. Support the commissioning team with punching, procedures, plans, check lists etc. Build a relationship with vendors and service providers and work with the operations and maintenance teams to take this forward.

Support the operation and maintenance team in setting up operations and maintenance systems and procedures including provision of data and documentation.

Support building the Asset Management System including reporting, inventory, oil movement, spares, etc. Inspect project site to monitor HSE, progress and ensure conformance to design specifications and project standards. Review and approve project scope of work, Material requisitions, MTO, I/O List, sizing calculation, Technical Bids, specifications and philosophies, and making inputs to process PEFS /P&IDS. Attending Project Meetings, Design reviews/HAZID /HAZOP/SIL /PDMS/Constructability reviews, SIMOPS, LLI etc. PETROLEUM DEVELOPMENT COMPANY • Oman • 2014 – June 2019 INSTRUMENTATION, CONTROL AND AUTOMATION ENGINEER

Providing specialist support in all aspect of control and instrumentation engineering for the company. Work includes upgrading or modification of site control systems and instrumentation. Provide first line instrumentation engineering expertise in the development of proposals for modifications and addition to existing equipment and systems. Carry out technical reviews of control and instrument specifications and design of new projects. Develop FEED scope in line with pre-project statements and Basis of Design. Review and checks, instrument and PAS/DCS engineering documents produced during the FEED, detailed engineering, procurement, construction, and commissioning to ensure compliance to international design codes and best engineering practices.

Review and check project, instruments and PAS/DCS standards and specifications to ensure adequacy to meet safe operability and maintainability of the refinery.

Scrutinize engineering, procurement, construction and commissioning activities, DCS, ESD, F&G and field instrument system to ensure compliance with project specifications and standards. Supervise the Engineer and ensure efficient and smooth workflow. Provide engineering support to his directly reporting staff and distribute the workload to within his team to ensure proper coverage. Support process engineers and other disciplines in developing safe and efficient process control systems in accordance with the basis of design and project standards and specifications. Attend engineering reviews and studies at contractors or vendors offices/shops including HAZOP, SIL, SAFOP, HAZID, PSSR, etc.

Attend FAT and SAT of systems as required.

Provide field engineering support during the construction phase. Support the commissioning team with punching, procedures, plans, check lists etc. Build a relationship with vendors and service providers and work with the operations and maintenance teams to take this forward.

Support the operation and maintenance team in setting up operations and maintenance systems and procedures including provision of data and documentation.

EMEKA NILLARD ERUGO PAGE - 2

CLASSIFICATION: C0 - NON-CONFIDENTIAL

Support building the Asset Management System including reporting, inventory, oil movement, spares, etc. Inspect project site to monitor HSE, progress and ensure conformance to design specifications and project standards. Preparing project scope of work, Material requisitions, MTO, I/O List, sizing calculation, Technical Bids, specifications and philosophies, and making inputs to process PEFS /P&IDS. Attending Project Meetings, Design reviews/HAZOP/SIL /PDMS/Constructability reviews etc. Follow-up Engineering activities progress related to instrumentation and instrumented control and safety systems

(ICSS) for major projects, the LLI and package vendors etc. KEY PROJECTS HANDLED:

FRONT END & DETAIL ENGINEERING FOR KHULUD GAS PROJECT • Oman • Feb 2016 – Present

• IPF Narratives/Report.

• Alarm Rationalisation Report

• Review Technical Bids from Vendors.

• Prepare Preliminary MTO list for LL items.

• Prepare FEED & DD phase documents and drawings such as Control & Automation Philosophy, Metering specifications, Material Requisition and specification for PAS incl. scope of work, on-off valves, Final MTO, I/O List, control valves/choke valves, General instruments, Fire and Gas detector’s, Motor Operated Valve & Integrated Hydraulic Control Panel, instrument Datasheets on SPI Data base, SAP coded for all the field instruments. orifice

• Sizing calculation for flow meters and restriction orifice.

• Prepared Instrument location drawing for Yokogawa FCS and Combined IPS/FGS Remote I/O panels for Khulud Well heads.

• Developed loop, Cable schedule and cable route. Hook up, Control room and JB Location layout and PAS Architecture etc.

FRONT END ENGINEERING FOR STANDARDIZED REMOTE MANIFOLD PROJECT • Oman • Apr 2016 – 2017 Prepared below Instrumentation FEED Dossiers.

• Preliminary MTO

• Control Narrative

• Shutdown Hierarchy

• Fire & Gas System Philosophy & Layouts

• Instrument loops & Hook-Up drawings

• Instrument list/IO List

• Instrument location drawing / cable Schedule

• Data sheet

• Sizing / Calculation

• Site visit report.

• Train joiner engineers in the FEED office by supporting their development programs.

• Participated in Design Reviews, inputs to P&IDs, HAZOP, SIL/IPF reviews etc. FRONT END ENGINEERING FOR MABROUK PHASE 3 PROJECT • Oman • July 2014 – Jan 2015

• Prepare FEED documents and drawings such as Control & Automation Philosophy, Fire & Gas Philosophy, Metering specifications, Material Requisition and specification for PAS incl. scope of work, on-off valves, control valves/choke valves, General instruments, Motor Operated Valve & Integrated Hydraulic Control Panel, instrument Datasheets on SPI Data base, SAP coded for all the field instruments.

• Specified Delta V FCS and Combined IPS/FGS Remote I/O panels for Mabrouk Wells Heads.

• Developed loop, Hookup, Location and PAS Architecture etc.

• Ensured DEM 1 compliance. Reviewed documents in ASSAI. EMEKA NILLARD ERUGO PAGE - 3

CLASSIFICATION: C0 - NON-CONFIDENTIAL

• Involved in Design Reviews, inputs to P&IDs, HAZOP, SIL/IPF reviews etc. FOLLOW-ON ENGINEERING FOR MABROUK PHASE 3 PROJECT • Oman • Feb 2015 – Dec 2015

• Assured EPC understanding and adherence to the C&A scope.

• Provide guild lines & clarifications to Detail Design Contractor. FRONT END ENGINEERING FOR BIRBA RATIONALIZATION PROJECT • Oman • Mar 2015 – Dec 2015 Attended Site Visits and Prepared below Instrumentation FEED Dossiers.

• Control Narrative

• Shutdown Hierarchy

• Control Philosophy

• Fire & Gas System Philosophy & Layouts

• Instrument loops & Hook-Ups

• Instrumentation Cause Effects

• Instrument list

• Instrument Schedule

• Data sheet

• Sizing / Calculation

PETROFAC • Nigeria/UK • 2013 - 2014

PRINCIPAL INSTRUMENTATION, CONTROL AND AUTOMATION

Provided specialist support in all aspect of control and instrumentation engineering for the company. Work includes upgrading or modification of site control systems and instrumentation. Provide first line instrumentation engineering expertise in the development of proposals for modifications and addition to existing equipment and systems. Validation of all the engineering design dossier for SOKU NAG DEBOTTLENEKING PROJECT. Carry out technical reviews of control and instrument specifications and design of new projects. Reviewed and approved, in accordance with applicable procedures and requirements, the instrumentation and UCP/ICSS documentations such as datasheets, MTO, Cable list etc Follow-up Engineering activities progress related to instrumentation and instrumented control and safety systems

(ICSS) for major projects, the LLI and package vendors etc. KEY PROJECTS HANDLED:

ENGINEERING /CONSTRUCTION FOR SOKU GAS PLANT DEBOTTLENECKING PROJECT • Shell • June 2013 – June 2014

• Accountable for managing C&A scope according to the Shell DEP standards designs methodologies and project quality plan.

• Ensured DEM 1 compliance in the project. Reviewed AFC deliverables such as philosophies, material Requisitions & General Instruments.

• Focal point in Design Reviews, inputs to P&IDs, HAZOP, SIL/IPF reviews etc.

• Responsible for providing inputs to IC&A scope and General specifications and P&IDs through ensuring that the designs are in accordance with SPDC standards and project Quality Plan.

• Prepared Technical specification & MTO.

TOTAL UPSTREAM LAGOS • Nigeria • 2011 - 2013

LEAD INSTRUMENTATION CONTROL & AUTOMATION ENGINEER Lead the team and supported young IC&A Engineers. Reviewed & approved Engineering Design Packages for AKPO/USAN projects modification and contractor. Reviewed Technical Bid Company . Attended offshore site visit, meetings, HAZOP/SIL Classification and other reviews. Reviewed P&ID, and Electrical SLD, motor schematic & vendor drawing. Liaised with & Reviewed Package Vendor Documents. Ensured proper Interface with compliance of other disciplines and executed projects according to company standard. etc EMEKA NILLARD ERUGO PAGE - 2

CLASSIFICATION: C0 - NON-CONFIDENTIAL

Provided specialist support in all aspect of control and instrumentation engineering for the company. Work includes upgrading or modification of site control systems and instrumentation. Provide first line instrumentation engineering expertise in the development of proposals for modifications and addition to existing equipment and systems. Carry out technical reviews of control and instrument specifications and design of new projects. Prepared project scope of work, Material requisitions, MTO, I/O List, sizing calculation, Technical Bids, specifications and philosophies, and making inputs to process PEFS /P&IDS. Attending Project Meetings, Design reviews/HAZOP/SIL /PDMS/Constructability reviews etc. KEY PROJECTS HANDLED:

DETAIL ENGINEERING FULL FIELD SHORT DOWN PROJECTS • Total Akpo, FPSO Nigeria • Dec 2012 – May 2013

• Reviewed and approved all AFC Instrumentation, Control and Automation deliverables for offshore construction and commissioning for full field shot down maintenance of Akpo FPSO such as instrument index, Location plans/Layouts for Gas detectors. ICSS (DCS, ESD, & FGS) IO List /index,loops and Hook ups. Reviewed the ICSS design scope for Alderly metering package and all FAT documentation.

• Carried out Detail Engineering Design scope for field Instruments modification and Integration to AKPO DCS/ESD System.

• Preparation/checking of instrument index, Functional loop drawing, Datasheets for control valves /ESD valves,

& Cause & Effect. ETC

• Focal point for all HAZID/ Reviews, inputs to P&IDs, Fire & Gas details, specifications, drawings and any modification scope in Instrumentation etc.

DETAIL ENGINEERING FOR METERING PACKAGE UPGRADE • Total Akpo, FPSO Nigeria • Jan 2012 – Mar 2012

• Supervised the preparation for commissioning dossier package deliverables and Asbuilts documentation in Total Lagos Nigeria Office, ensuring AFC documentations with Total EP standards and project Quality Plan and project delivered within company deadlines and budget.

• Reviewed AFC Instrumentation, Control and Automation of vendor documents such as FDS, MTO & FAT Reports etc.

DETAIL ENGINEERING FOR FIRE WATER PUMP PACKAGE UPGRADE • Total Akpo, FPSO Nigeria • July 2011 – Dec 2011

• Prepared all the Detail Engineering Design scope for field Instruments modification and Integration to AKPO DCS/ESD System.

• Preparation/checking of instrument index, Functional loop drawing, Datasheets for control valves /ESD valves,

& Cause & Effect. ETC.

• Focal point for all HAZID/ Reviews, inputs to P&IDs, Fire & Gas details, specifications, drawings and any modification scope in Instrumentation etc.

SHELL PETROLEUM DEVELOPMENT • Port Harcourt, Nigeria • 2006 - 2011 SENIOR INSTRUMENTATION CONTROL /TELECOMMS ENGINEER Carried out FEED / studies & Detail design and follow-up installations for the company. provided inputs to PEFS. Attended Onshore Site Visit, design Review Meetings, kick-off & project coordination meetings, HAZID/ HAZOP, SIL classification, Alarm management workshops,3D model workshops etc. Prepared sizing calculations, MTOs, location drawings, cable schedules, routing, General instrument specification. Loop diagrams, hooked-up drawings, long lead items. CCTV, PAGA integration with FGS.V-monitors at well heads. KEY PROJECTS HANDLED:

DETAIL ENGINEERING FOR OBIGBO FLOW STATION REMOTE OPERATIONS UPGRADE PROJECT • Shell Onshore-Nigeria • 2006 – 2007

• Developed instrumentation philosophy and specification, PAS Architecture, Control room layout, Export Metering schematics, MTO (Material Take Off), Data sheet, instrument index, Cable and JB schedule etc.

• Participated in Design Reviews HAZOP/IPF Reviews, inputs to P&IDs, Fire and Gas details and specifications for the FEED phase.

FRONT END DESIGN FOR GBARAN UBIE INTEGRATED PROJECT • Shell Onshore-Nigeria • Jan 2008 – Dec 2008 EMEKA NILLARD ERUGO PAGE - 3

CLASSIFICATION: C0 - NON-CONFIDENTIAL

• Prepared all C&A scope for FEED phase .Liased/discussion with various vendors such as Emerson delta V Systems equipment packages UCP, ensuring that the designs methodologies are in accordance with Shell DEP standards and project Quality Plan.

• Developed instrumentation philosophy and specification, PAS Architecture, Control room layout, Export Metering schematics, MTO (Material Take Off), Data sheet, instrument index, Cable and JB schedule etc.

• Attended Design Reviews HAZOP/IPF/Alarm management. Reviews, inputs to P&IDs, Fire and Gas details and specifications for the Engineering phase.

• Managed other C & A, activities such as attending site visits and clarification meetings. FRONT END DESIGN FOR AGBADA 2 FLOW STATION REMOTE OPERATIONS UPGRADE PROJECT • Shell Onshore-Nigeria • Jan 09 – July 09

• Attended Design Reviews HAZOP/IPF Reviews, provided inputs to P&IDs, Fire and Gas details and specifications for the FEED phase.

• Managed other C & A, activities such as attending site visits and clarification meetings.

• Prepared the instrumentation philosophy and specification, PAS Architecture, Control room layout, Export Metering schematics, MTO (Material Take Off), Data sheet, instrument index, Cable and JB schedule etc. ASBUILT CAMPAIGN • Shell Onshore flow stations/Gas plants- Nigeria • Jan 2010 – May 2011

• Updated pneumatic, electrical, process hook-up drawings, Junction Box and marshalling rack panels termination details instrumentation IO list /index . Instrument Datasheets etc .

• Coordinated the C&A team during the As-built of Various Flow stations and Gas plants. POINT ENGINEERING COMPANY • Port Harcourt, Nigeria • 2006 - 2007 SENIOR IC&A ENGINEER

Prepared project scope of work, instrument materials specification, BOQ, loop diagrams, cable block diagrams, instrument lists, etc. for the upgrade of Control System for Turbine-Compressor Integrated Control System at NGL- 3. Involved in the Replacement of 3units-GE Mark IV series control system panels, MICON for Anti-Surge Control, Bently Nevada BN3200 Vibration monitoring System relay-based system into microprocessor-based GE Mark VIe

& and Bently Nevada’s BN3500 vibration monitoring system. Prepared single line diagram for power requirements of 20” pipeline upgrade from Pig launcher UmmBab to Pig Receiver Messaied Tank Farm. Review pneumatic & process hook-up drawings.

KEY PROJECTS HANDLED:

DETAIL ENGINEERING UBIT GH FIELD DEVELOPMENT PROJECT-EXXON MOBIL DETAIL ENGINEERING ASASA VA/VB FIELD DEVELOPMENT PROJECT-EXXON MOBIL DETAIL ENGINEERING ENANG B GAS LIFT PROJECT –EXXON MOBIL DETAIL ENGINEERING NEMBE 2 REMOTE MANIFOLD STATION PROJECT –SHELL

• Provided Input to P & ID drawing. Prepared instrumentation control philosophy reports, material take-off.

• Attended site visit and Review meeting

• Prepared loop diagram (Functional scheme) and hook-up diagram.

• Prepared data sheet for various instruments such as pressure gauges and transmitters, etc., and instruments index/list of various instruments.

INSTRUMENTATION & CONTROL ENGINEER, SUDELLETRA • Port Harcourt, Nigeria • 2004 – 2006 KEY PROJECTS HANDLED:

DETAIL ENGINEERING EBOCHA REVAMPING PROJECT-AGIP

DETAIL ENGINEERING FIRE WATER PROJECT-EXXON MOBIL

DETAIL ENGINEERING OBITE PROJECT-TOTAL

• Provided Input to P & ID drawing. Prepared instrumentation control philosophy reports, material take-off.

• Attended site visit and Review meeting

• Prepared loop diagram (Functional scheme) and hook-up diagram. EMEKA NILLARD ERUGO PAGE - 2

CLASSIFICATION: C0 - NON-CONFIDENTIAL

• Prepared data sheet for various instruments such as pressure gauges and transmitters, etc., and instruments index/list of various instruments.

• Prepared asbuilt documentations for the project

INSTRUMENT & ELECTRICAL ENGINEER, CRAYMOND • Port Harcourt, Nigeria • 2001 – 2004 PROJECT HANDLED:

ALAKIRI GAS PLANT REVAMPING PROJECT-SHELL

Carried out engineering design and installation for the company. provided inputs to all documents/drawings. Attended Site Visit, Review Meetings, kick-off & project coordination meetings, etc. Reviewed calculations, MTO, location drawings,cable schedules, routing, General instrument specification. Looped diagrams, hooked-up drawings, long lead items, RFQ of materials & equipment technical review from the suppliers/vendors prior to final procurement, and other electrical and instrumentation deliverables. MAINTENANCE ENGINEER, Evol Computers, port Harcourt-Nigeria, 1999 – 2000 ELECTRICAL ENGINEER, NYSC Zamfara State, 1998.

TRAININGS

• Basic Process Control and Instrumentation-PDO,

• Smart Plant instrumentation for Datasheet/index– PDO,

• SIL/IPF-Oman,

• Metering Systems-Oman,

• TUV Training IEC 61511 SIS–(UK),

• H2S Awareness-PDO,

• HUET –Total Nigeria

• SIL/IPF – Shell Nigeria,

• TUV certification -IEC 61511 SIS–UAE

MEMBERSHIPS

Instrument Society of America (ISA Member No.33069742)



Contact this candidate