Post Job Free

Resume

Sign in

Site Sup./Team Lead/Quality Assurance/Driver

Location:
San Vicente, Laguna, 4024, Philippines
Salary:
PHP40,000.00
Posted:
July 14, 2023

Contact this candidate

Resume:

Curriculum Vitae:

Romulo D. Germino

B* L** Golden City Subd.

Canlalay, Binan Laguna 4024

Email Address: adyayk@r.postjobfree.com

Contact Number : +639********* - Smart

CAREER OBJECTIVES:

To work in a progressive firm where my skills, knowledge, and abilities will harness and develop to their full potential.

To perform and contribute to the accomplishment of plans, programs, and projects of the company.

To be a part of the growth of the company in terms of financial status or profits, accomplishments of its social responsibility objectives the overall long-term goals of the company.

To contribute and enhance the knowledge that I have learned and put into action the values with discipline inculcated in me and at the same time, to acquire new skills in my field of endeavor.

QUALIFICATIONS AND STRENGTHS:

Aptitude for creativity, clarity, and conciseness in oral and written communication, concept synthesis

and simplification, and the development of strong interpersonal relations.

Effective demonstration of Work and Heights Occupational Health Safety and Risk Assessment.

Proven skills in leadership, teamwork, and problem-solving.

Work well under pressure, Able to handle multiple projects concurrently.

WORK HISTORY:

Position: Site Engineer Supervisor

Company: SMART- ERICSSON South Luzon Project

Ericsson Telecommunications

22/F Two NEO Bldg. 3rd Ave., cor. 28th St.

Crescent Park West, Bonifacio Global City 1634

Taguig, Metro Manila

Tel: +63 87891800

Philippines

Duration: October 01, 2019– July 15, 2020

Duties and Responsibilities;

To supervise the Sub-Contractor gathering site information based on actual and the-TSSR documents.

Toolbox meeting before starting the implementation and precautions on site.

Take note of the actual inventory of delivered materials to the site based on delivery notes from the Ericsson logistics office.

Immediately report the missing or lacking materials needed on site.

Check the priority and also how many proposed technologies are on site to be done.

Submit the report on Viber with pictures of the site and equipment locations.

Pick up materials at Ericsson Warehouse and deliver to sites.

Position: Team Lead Site Implementation Engineer

Company: FDF Telco Philippines Inc.

SMART- ERICSSON NCR Project

Km. 21 East Service Road, South Superhighway,

Sucat, Muntinlupa City

Duration: April 23, 2019 -July 31, 2019

Duties and Responsibilities:

Gathering site information based on actual and TSSR documents.

Toolbox meeting before starting the installation and precautions.

Take note of the actual inventory of delivered materials to the site based on delivery notes from the Ericsson logistics office.

Immediately report the missing or lacking materials needed on site.

Check the priority and also how many proposed technologies are on site to be done.

Install new power supplies such as DCDP for L1800 and U2100 technology.

Pre-cut for 7/8 Feeder Cables and Connectorizing together with the Power cables for RRUS.

Assembled of H-Frame and AMB's Antennas jumper connectors and associated components.

Double check new proposed equipment according to the TSSR-approved drawings and locations inside and outside shelter equipment.

Checking options of accessibility for the implementations on site and recommendations/suggestions of Ericsson Supervisor

Updated report to the project coordinator from time to time on the progress of site implementations.

Position: Team Lead Site Survey Engr./Refarming

Company: NEONWORX Philippines Inc.

SMART- NOKIA REFARM Project

RM 402 4th Floor GC Corporate Bldg.

Legaspi St. San Lorenzo Village Makati City

Duration: March 02, 2018– Aug. 15, 2018

Duties and Responsibilities:

Gathering actual site information based on the TSSR survey.

Take note of an actual inventory of delivered materials to the site based on the delivery note from the logistics.

Actual layout for the proposal of Antennas, RET, CPRI for Feeder less and Filtering/RIU and RRUs.

Pre-cut of 7/8 Feeder Cables and Connectorizing and Power cables for RRUS.

Assembled of H-Frame and AMB's Antennas jumper connectors and associated components.

Double check of new proposed equipment according to the TSSR-approved drawings and locations in and out of the shelter.

Checking options of accessibility for the implementations on site and recommendations or suggestions of NOKIA's Supervisor.

Position: Team Lead Logistic Engr./Delivery of Refarm Materials

Company: NEONWORX Philippines Inc. Project

SMART-NOKIA REFARM Project Engr.

RM 402 4th Floor GC Corporate Bldg.

Legaspi St. San Lorenzo Village Makati City

Duration: Aug. 16, 2017– Oct. 30, 2017

Duties & Responsibilities:

Picked up refarm materials from the warehouse Nokia for direct delivery to intended sites for refarming.

Update team leaders on site of their lacking of additional materials on site.

Assisted bulk and huge deliveries of refarm materials.

Assisted in the hauling of refarm materials to the said site.

Went back and forth to cater to the needs of the teams on site.

Position: Team Lead Implementation Engr. Refarming

Company: NEONWORX Philippines Inc. Project

SMART-NOKIA REFARM Project

1276 Batangas St.

Brgy. San Isidro, Makati City

Duration: Oct. 30, 2016– May 17, 2017

Duties and Responsibilities:

Toolbox meeting for the Team before starting the installation jobs on site.

Riggers must be completed on PPE before the Antennas installations.

Materials inventory based on the Delivery Note that needs on-site.

Review IE Binder for the scope of work on particular sites and configurations.

Start assembling the Antennas and other associated materials such as antenna Brackets and jumpers.

See to it that all connections and interphases of cables are connected in proper positions.

Check all necessary groundings are connected to their other down to the grounding buss bar.

Check power supplies are connected to the proper circuit breaker based on the IE plan.

Power up and test all the assembled unit components based on IE configuration.

Updated reports from time to time on the progress of site installations.

WORK HISTORY:

Position: Quality and Acceptance Engineer

Company: GTSI/Alcatel-Lucent Philippines Inc. Project

Blk.4 Lot 2 Diego Silang Avenue AFPOVAI Subdivision,

Western Bicutan Taguig City, Philippines

Duration: March 27, 2015– March 15, 2016

Duties and Responsibilities:

Supervised Subcontractor for site implementation of Alcatel –Lucent LTE-TDD2600 /FDD1800 node B project.

Quality assurance site inspection of BBU 9926/TD-RRH 8x20-25 based on Alcatel-Lucent/Globe Telecom Standard Installation and Testing procedure. Responsible for PRE-PAT for Subcontractor and PAT for Globe Telecom Company.

Prepare and review PAT documents, Hardware Site Quality Report and Hardware checklist, BFT report, Commissioning, and TSSR documents.

Supervised sub-contractor for Rectification and make sure the site is 100% complete and ready for PAT.

Daily update and request site materials and delivery on site.

Conduct a power survey for rectifier additional load and Preliminary Acceptance Test for Power (Rectifier and Battery system).

Prepare PAC Provisional Acceptance Certificate and As-built drawing for PAT sites.

Project Handled:

Globe-Alcatel-Lucent-LTE-TDD/FDD Province of Bohol, Visayas’ Area.

WORK HISTORY:

Company: ERICSSON-MOBILY PROJECT – Riyadh (Saudi Arabia)

Position: Quality Inspector for HO3

Project: L+6 and L+7 New Sites and Shared Sites STC

Duration: 04 October 2011 to September 30, 2013

Duties and Responsibilities:

Directly responsible for quality inspection of a new GSM site for RBS6000 Configuration Testing and Commissioning on 2G 6201 (RUS) Cabinet type together TN-Transmission Sweep Testing of VSWR & DTF using Anritsu site master.

Responsible for attending and performing (HO3) Pre-PAT Partial Acceptance Test (PAT) on the New Cell Site for 2G and TN-Transmission.

Performing troubleshooting and Software upgrades on TN-TRM and Oil Clearing on Site.

Supervising implementation team of Indoor installation in the shelter yard and also Outdoor jobs for the new and shared cellular site.

Submitting daily reports to Project Manager/Coordinator on all activities done.

WORK HISTORY:

Company: WELTEX Saudi Arabia Ltd - Riyadh (Saudi Arabia)

Position: Telecom Tester Commissioning (GSM)

Project: STC- Ericsson Project GSME7 PO3 & 2G, Node B TMR

New Site, Co-location, and HW & SW upgrade

Duration: October 23, 2010, up to May 19, 2011

Duties and Responsibilities:

Directly responsible for Testing and Commissioning new (GSM) Cellular Sites 2G, 3G,

TN-Transmission. And Expansion Site with Sweep Testing of VSWR & DTF.

Responsible for attending and performing Pre PAT and PAT Partial Acceptance Test (PAT) on the New Cell Site for 2G, 3G, and TN-Transmission for the SW and HW Expansion.

Troubleshooting and Upgrading Software and Hardware and also Oil Clearing on Site.

Supervising implementation team of Indoor/Outdoor jobs for the new and co-located (GSM) cellular site.

Verify site configuration and TN parameters and frequencies based on the Transmission Network budget link.

Perform 24 hrs. BER testing performance for the E1 on TRM, TN & Mini Link E Classic.

Fixed external alarms on the DDF from the RBS and TRM going to the Building box alarm.

Checks all Alarms Status on RBS 2G, 3G, and Traffic Node Transmission.

Perform drive testing on-site with Ericsson TEMS 2G and 3G during PAT.

WORK HISTORY:

Company: NOVIAcom. - Riyadh (Saudi Arabia)

Position: Telecom Tester Commissioning (GSM) Imp. Supervisor

Project: STC- Ericsson Project GSME5 PO3 & 2G, Node B TMR

Duration: April 11, 2002, up to Dec. 20, 2009

Duties & Responsibilities:

Directly responsible for Testing and Commissioning new (GSM) Cellular Sites 2G, 3G,

TN-Transmission. and Expansion Site with Sweep Testing of VSWR & DTF.

Supervising implementation team of Indoor/Outdoor jobs for the new and co-located (GSM) cellular site.

MDT for Software and Hardware upgrades 2G and 3G 2nd carrier and Traffic Node Transmission.

MDT Rehoming of the site to ADM DXX, Link Upgrade of the site from Mini link classic to High Capacity/Mini link TN to DXX.

Software Upgrade and configuration of DXX ERICSSON and also troubleshooting and checking alarms daily basis.

Perform sweep testing of VSWR/DTF for the Feeder Cables and Antennas of a new cell site upgrade and expansion.

Implementing all Radio parameter changes requested by the Optimization and O&M.

On-site troubleshooting of 2G/3G/Mini link-E, Traffic Node, and High Capacity.

Integration or re-deployment of the VIP COW site (cell on wheels)

Perform all kinds of operation and maintenance on BSC and RBS.

Responsible for (PAT) partial acceptance test of the new cell site.

On-site troubleshooting of 2G/3G/Mini link-E, Traffic Node, and High Capacity.

Integration or re-deployment of the VIP COW site (cell on wheels)

Responsible for (PAT) partial acceptance test of the new cell site.

Undertake manual setup on Mini link E using MMU LED display for TX frequency output power.

WORK HISTORY:

Company: Ericsson/Teledesign Project - Riyadh (Saudi Arabia)

Position: Implementation Supervisor (GSM)

Project: STC- Ericsson Project GSME4 Change Out / New Site BTS & TRM.

Duration: July 2000 to November 2001

Duties & Responsibilities:

Carry out commissioning and testing of TRM 9202 module units such as SAU, MMU, SMU, DDU, and Fan unit to the desired 1+1 or 1+0 mode.

Outdoor implementation for Tower works such as installation, laying, and termination of cell antennas, outdoor jumper cables, feeder clamps, feeders, and grounding.

Keeping up records or defects of the equipment feeder cables and reporting to the warehouse for replacement.

Training of local employees (Saudi National) on how to perform installation Testing and commissioning.

Performing the works by following the Ericsson methods, quality, and safety standards.

Responsible for supervising the sub-contractor indoor installation of RBS and TRM Cabinet, Power supplies, Rectifiers, Batteries wirings, and groundings.

Responsible for preparing indoor installation materials and equipment delivered to the yard based on the materials requests from the logistics.

Perform Stand Alone Testing and Commissioning of newly installed equipment such as RBS/TRM/ Power supplies, Batteries, and Alarms before handling or delivering to the site.

Ensuring that all the necessary Installation Documentation Plan (Blue Binder) and the outdoor installation materials are readily available before the delivery of the shelter.

Coordinates civil works and the site acquisition regarding the priorities of scheduling and deliveries of the shelter to the location.

Performing the works by following the Ericsson methods, quality, and safety standards.

Training of local employees (Saudi Nationals) on how to perform installation and testing.

Coordination from the site supervisor with the installation materials they are needed from time to time.

Perform 24 hrs. BER testing performance for the E1 on TRM, TN & Mini Link E Classic.

WORK HISTORY:

Company: ERICSSON PHILIPPINES-(ENP)

Position: Engineer 1 BTS/TRM Team Leader Implementation

Project: Globe Telecom / Ericsson project (VIZMIN AREA)

Duration: January 1996 TO April 2000

Duties & Responsibilities:

Assembling and Installation of 0.6, 1.2 & 1.8 meters of Microwave Mini-Link Antennas.

Installation of RBS Cabinet 2202 and accessories.

Installation of Power Rectifier and Back up Batteries.

Installation of Panel/Sectorize and OMNI-Directional antennas for GSM.

Laying out Feeder cables, termination, and connectorizing.

Lay out of Power cables and 2Mbits or E1's signal cables and grounding.

Perform change out of GSM equipment, Antennas, and Feeder cables (e.g.NOKIA to Ericsson equipment)

Supervising the sub-contractor regarding the installation plan of RBS 2202 termination of Power, Alarms cables, and groundings.

Perform (IBS) in-building installation solution of Globe GSM Project.

Perform VSWR/DTF Testing using Anritsu Site Master for the feeder cables and Antennas.

Perform 24 hours of BER testing for the E1 on TRM.

Personal Profile:

BSECE Graduate: 1981 (underboard)

Nationality: Filipino

Passport Number: P2565300C

Date of Issue: 03 DEC. 2022

Valid until: 02 DEC. 2032

Driver License #: D04-94-072888

Valid until: 17 Dec. 2032

Restrictions: (1,2,3) A,A1,B,B1,B2 C,D.

Serial Number … 324795681

Availability: ASAP



Contact this candidate