Post Job Free

Resume

Sign in

Qa Qc Quality Assurance

Location:
Riyadh, Saudi Arabia
Salary:
30000
Posted:
August 28, 2023

Contact this candidate

Resume:

Name : SYED UMAR KHALID

Nationality : INDIAN

JOB TITLE : QA/QC -MANAGER

Mobile: 009**-*********

Email: ady99h@r.postjobfree.com

EDUCATIONAL ATTAINMENT : BACHELOR OF CIVIL ENGINEERING PROFESSIONAL QUALIFICATION:

SWCC / FICHTNER – Approved as QA/QC- Manager

PROJECT: Shuqaiq 4 SWRO Plant

EPC CONTRACTOR: Acciona Agua

Saudi Aramco – Approved as Quality Assurance Manager

(Ref No.: SKPIS-T-2021-0025; SAP No. 80008608)

PROJECT: BI-25-000**-**** SPARK Building Package, Abqaiq EPC CONTRACTOR: China Railway 18th Bureau Group Co Ltd SWCC – Approved as QA/QC- Manager (Ref No.: SF-AH-L-0004) PROJECT: Strategic Reservoirs at Makkah & Taif

EPC CONTRACTOR: Al Ayuni Investment & Contracting Co. Saudi Aramco – Approved as Quality Assurance Manager

(Ref No.: SPU/100 10/T-200/17; SAP No. 70011473)

PROJECT: BI-10-10010 Install SCADA Systems at SAOO Fields, Uthmaniyah/Hufuf

EPC CONTRACTOR: Kentz, Member of SNC-Lavalin Group Saudi Aramco – Approved as Quality Assurance Manager

(Ref No.: DAPIS/L-1159 /2015; SAP No. 70011473)

PROJECT: Home Ownership Residential Lots ( East Dammam) EPC CONTRACTOR: AlShalawi Int’l Holding Co

Royal Commission – Approved as QA/QC- Manager

PROJECT: 380 KV SUBSTATION & OHTL (099-C01)- Ras Al Khair EPC CONTRACTOR: Saudi Services for Electro Mechanic works Co. Ltd (SSEM) Experience : 27 years

Saudi Aramco – Approved as Quality Assurance Manager

(Ref No.: YERP-SP5-SSE-L-12-029; SAP No. 70011473) PROJECT: YASREF SP5 HV ELECTRICAL (YANBU)

SWCC – Approved as QA/QC- Manager

(Ref No.: SRHR-SR-L-2791)

PROJECT: Ras Al Khair – Riyadh Water Transmission System EPC CONTRACTOR: Saudi Services for Electro Mechanic works Co.Ltd (SSEM) SADARA – Approved as QA/QC- Manager

PROJECT: MARAFIQ’s SALINE WATER REVERSE OSMOSIS (SWRO) EPC CONTRACTOR: Saudi Services for Electro Mechanic works Co.Ltd Saudi Aramco – Approved as Quality Control Manager

(Ref No. MPD/COGEN/T-1317/2011 )

PROJECT: MANIFA CO-GENERATION AND MAIN SUBSTATION

EPC CONTRACTOR: AL-MOJILGROUP(MMG)

Saudi Aramco Project Inspection Department – SAPID Approved as an Inspection Group Leader

GIS-CONT: ABS GROUP

PROJECT: KAPSARC (RFP# 39)-Riyadh

Saudi Aramco – Approved as QA/QC Manager

(Ref No.CRPIS/L-147/2010; SAP No. 70011473)

EPC CONTRACTOR: SINOPEC INTRN’L. PETROLEUM LTD.

PROJECT: AL-WASEA BULK PLANT PROJECT-Riyadh

Saudi Aramco: DISTRIBUTION PROJECTS DIVISION-Western Region Approved as QA/QC Manager.

EPC CONTRACTOR: HIDADA LTD

PROJECT: 2 GRADE GASOLINE- Jizan & Abha

PROFESSIONAL KEY SKILLS:

ISO 9001:2015 Auditor/ Lead Auditor Training Course Successfully completed the Course and passed in examination in 2021.

ISO 9001:2008 Auditor/ Lead Auditor Training Course Successfully completed the Course and passed in examination in 2010.

(QMS Auditor / Lead Auditor-Cert # QMSLA-1123)

A Course on Concrete Technology for Engineers.

A Course on Acoustic Emission.

A Course on NDT and Fracture Mechanics.

ASNT NDT Level II (VT) Visual Testing

ASNT NDT Level II (LPT) Liquid Penetrant Testing

ASNT NDT Level II (RTFI) Radiographic Testing Film Interpretation

ASNT NDT Level II (RT) Radiographic Testing

ASNT NDT Level II (MPT) Magnetic Particle Testing Professional Experience: JULY 2021 TO TILL DATE

Working as QA/QC - MANAGER in Acciona Agua.

Ensure implementation of the Quality Management System.

Heads, directs its staff, supervises its functions.

Deals directly with the Consultant Representatives and third-party inspectorate in quality.

Related matters, identifying and advising on the resolution of non-conformities, and ensuring that quality records of Acciona Agua are maintained.

Establish proposed work plans and directs his subordinates to ensure proper execution in terms of quality and reliability.

Ensure that the Project Quality Control Plan is understood, implemented and Maintain at all levels of the Project.

Ensure maintenance of records of Project Quality Control Inspection and tests performed and that said records are always available for the company use and passed directly to them.

Assist the project Director in handing over the project to client.

Establish Project Quality audit program & schedule and perform the Project Quality Audit within the project organization.

Coordinate and communicate with Client on Project Quality issues.

Produce and develop the project Quality Training Plan. Ensure implementation of the plan. Ensure that training records are maintained.

Report the performance status of Project Quality activities and relevant issues to the QHSE Corporate Manager and project Manager.

Ensure that Quality Management is applied in line with the Project Design Criteria to the Engineering, Procurement, Construction and Pre-Commissioning/Commissioning phases of the Project.

Ensure that the Project meets SWCC standards.

Conduct the Offsite Inspections of all the subcontractors’ works and Third-party laboratories.

Conduct the Training programs to project personnel to fulfill the requirements of their duties and project requirements.

Approve Supplier/Subcontractor Fabrication / Certification Dossiers (as appropriate).

Approve Verification and inspection release processes.

To Attend with project manager the Supplier/Subcontractor kick-off meetings

Process of NCR and observation closing 100% on time

Co-ordination with Project Management Team (PMT) / SWCC for site inspections, technical instructions, waivers and queries.

Audit finding closing 100% on time

Professional Experience: FEB 2020 TO JUN 2021

Worked as QA MANAGER in (China Railway 18th Bureau Group Co Ltd).

Preparation and administration of the Project Quality System Documents

Coordinate the quality requirements during Engineering, Procurement and

Pre-commissioning phase of the Project. Assignment of QA related tasks within the framework of the project.

Ensure the consistency and the adequacy of the QA/QC activities, in accordance with the Company requirements and the objectives ofthe Project.

Provide a regular assessment of the project quality status through weekly quality meeting. Prepare and submit monthly quality management reports to Client.

Co-ordinate and control the QA/QC activities such as but not limited to: Identification and recording of non-conformances.

Initiate recommendation and solution to the non-conforming items through the designated channels. Verify the implementation of solutions.

Verify the implementation of the Quality Plan. For this purpose, he has direct access to all personnel in the project organization whose activities may affect the overall quality of the project.

Identify non-conformances by going through the inspection reports. Approve proposed corrective actions

Review the non-conformance solution implementation.

Schedule Internal Audits and subcontractor audits as per the requirements of Schedule "Q" of contract and approved auditschedule.

Review of Inspection Reports and related Non-Conformance Reports. Evaluation of Suppliers I Subcontractors Quality System.

Coordinates the project management review meetings Objective Monitoring & analysis

Identification and implementation of training requirements for project personnel.

(Co-ordination and supervision of activities relevant to the collection of the Project Quality

Record and preparation of a "Final Documentation Dossier".

Ensure the consistency and the adequacy of the QA/QC activities, in accordance with the Company requirements and theobjectives of the Project

Monitoring of construction subcontractor QC activities

Coordination and monitoring of the activities of third-party inspection services such as NOT, civil testing and welder qualification.

Co-ordinate and control the QA/QC activities such as but not limited to

Co-ordination and supervision of activities relevant to the collection of the Project Quality Record and preparation of a "Final Documentation Dossier".

Preparation, review, updating and distribution of the Project Quality Plan

Issue of Project Quality Control Procedures, Inspection and Test Plans and Forms

Review of Quality documentations issued by CONTRACTOR Assignment of Quality related tasks within the framework of the project

Review of Inspection Reports and Non-conformance Reports, if any

Evaluation of Suppliers/Sub-contractor's Quality systems Verification, by means of a planned Audit schedule that Sub-contractors are implementing the established Quality Program

Verification by means of a planned Audit schedule that the requirements set in the Quality Plan. Professional Experience: JAN 2018 TO FEB 2020

Worked as QA/QC- MANAGER in (Al Ayuni)

Ensure that Project personnel are suitably trained in Project’s requirement

Apply dependent QC systems, procedures as applicable.

Facilitate regular meetings with all interested parties to ensure alignment of Projects QC requirements understanding and direction.

Review and approve Supplier/Subcontractor Quality Control Plans/Inspection Test plans and procedures.

Conduct the Offsite Inspections of all the subcontractors’ works and Third-party laboratories.

Conduct the Training programs to project personnel to fulfill the requirements of their duties and project requirements.

Participating/Conduct the Internal Audit of Quality System and Attend the External Audit by theClient.

Accountable for the verification and inspection release processes and ensure their compliance.

To Attend with project manager the Supplier/Subcontractor kick-off meetings

Accountable for Handover the Project documents to client and retain the corporate processesasset.

To Ensure Collecting project document approval on time

Quality training and tool box conducting on time

Monitoring and controlling risk assessment and Update on time

Audit finding closing 100% on time

Process of NCR and observation closing 100% on time

Defining the training program for all projectpersonnel

Approve Supplier/Subcontractor prequalification’s Quality Control Plans/Inspection Test plans and procedures.

Approve Supplier/Subcontractor Fabrication / Certification Dossiers (as appropriate).

Approve Verification and inspection release processes.

Approve all project submittals to client.

Immediate Stop any works which have non-conformance to project specification. Professional Experience: JULY 2016 TO JAN 2018

Worked as QUALITY ASSURANCE MANAGER in (KENTZ / SNCL)

Responsible to drive all quality functions and team as per the project specifications, Aramco standards, and Schedule-Q requirements.

Review quality of design deliverable of design contractor, 50% & 90% design reviews, TQs, Material Technical submittals, Purchase requisitions, Award recommendations..

To make sure to assign qualified QC personnel on site and to providetraining, competency for continual improvement.

reparation of Quality Control Plans, Procurement plan, ITPs & Inspection

Schedules.

Review approval of Sub-contractors QCPs, ITPs, Quality Procedures and Material Technical Submittals.

Preparation of Audit schedules conduct internal audits and Quality Management Review reports.

To make sure that all inspections activities of main and sub-contractors are performed as per the schedule.

Review and final evaluations of Material Submittals, Purchase Requisitionsand Purchase Orders of all inspect able material.

Review & approval of Quality Procedures, WPS & Material technical appraisals.

Preparation of PQI submittals (procurement & construction), QA/QC Statistics and

To Prepare Construction Quality Index (CQI).

Review and evaluations of final disposition reports, Vendor inspection records.

Reviewing & approving quality documents & Aramco submittals (Monthly Management Reports, Material Status reports, Two-week look ahead schedules, NCR summary reports).

Co-ordination with Project Management Team (PMT) for site inspections, technical instructions, waivers and queries.

Professional Experience: FEB 2012 TO JULY 2016

Worked as QUALITY ASSURANCE MANAGER in (SSEM)

The Quality Assurance Manager is responsible for Identifying those requirements of ISO 9001: 2008 to be Implemented in the Quality Management System (QMS).

Experience in developing and establishing multi-disciplinary construction field quality plans and procedures.

As a Head of the Quality Department, assigning quality personnel to various areas of Activities.

Review, Approve and issue of all Quality Records generated during Project.

Assigning Quality related task within the framework of project quality.

Preparation of Quality Assurance Plan for the Project.

Preparation Of Audit Schedule and Conducting Audits and preparation of report for Submission.

Evolution /Review of Non-Conformances, establishing the root Cause and advising the Corrective action for Prevention.

Preparation of Monthly Quality Report for Submission to Customer

Evaluating Cost of Quality.

Arranging and Conducting management reviews.

Evaluation of Supplier / Sub-Contractors quality System and Preparation of Report.

Preparation of Inspection assignment packages.

Review of requisition and purchase orders of Compliance with correct requirements.

Review & Recommendation of Sub-Vendors Quality Procedures.

Preparing agenda for Pre-inspection Meeting (PIM)-Co-ordinate Inspection at Source.

Ensure Inspection assignment Packages are Correctly distributed. Professional Experience: SEPT 2011 TO FEB 2012.

Worked as QA/QC- MANAGER in AL-MOJILGROUP(MMG), DAMMAM,KSA. CLIENT: SAUDI ARAMCO

PROJECT: MANIFA CO-GENERATION AND MAIN SUBSTATION

Coordinating the day to day activities of Construction / Quality related matters with a team of site engineers, welding Foremen, QC Inspectors and welders performances etc.

Monitoring for the Dimensional, NDT, Inspectors,PMI and PWHT on the daily work task.

Suggesting corrective action for Non-Conformances raised by QC Inspectors / Clients regarding Quality matters.

Control and monitoring of Welding Activities at site and Welder Record

(WPS & PQR) and Welding Consumables.

Reviewing of the Quality Manufacturing Dossier at the closure of the Project.

Job involves close coordination with the General Manager, Client, Sub-Contractors.

Reviewing & Submittal of QA/QC documents relevant to a particular project site.

Preparation of RT location map as per the Requirements

Familiar with codes like ASME Sec I, ASME Sec VIII Div.1, ASME Sec V, ASME Sec IX, API 650, API 620, API 1104, AWS D1.1 & relevant ASTM Standards.

Handing over the Projects & Final commissioning.

Conduct surveillance as per ISO 9001 procedure and co–ordinate with contractors .

Professional Experience: SEPT 2010 TO SEPT 2011.

Worked as Inspection Group Leader in ABS GROUP

CLIENT : SAUDI ARAMCO

PROJECT : KAPSARC PROJECT

(Saudi Aramco Project Inspection Department – SAPID) Dharan, Kingdom of Saudi Arabia

Inspection Group Leader in SAUDI ARAMCO INSPECTION DEVISION assigned to King Abdullah Petroleum Studies and

Research Center Project. The inspection activities covered: Construction of Residential and Community Complex and other support facilities. The center aims to achieve the vision of Saudi Aramco and the Kingdoms capability ion creating one of the premier and world class Energy Research Center to further study and anticipate future changes in the global energy, develop insights and policy alternatives to sustain and enhance the Kingdoms prominence in petroleum and other energy areas.

Monitor and/or perform quality activities at all stages of projects. Assure that contractor’s work is in compliance with SAUDIARAMCO

Engineering requirements, standards, procedures, specifications, and Schedule Q of the project contract .

Perform “Hold”, “Witness” and “Surveillance” inspections and testsat manufacturing facilities or construction sites to ensure compliance with SAUDI ARAMCO requirements and project specifications.

Inspect material and equipment as applicable to ensure compliance with SAUDI ARAMCO requirements for proper handling, storage and

protection at SAUDI ARAMCO facilities and/or construction sites.

Monitor Contractor’s Quality Systems, records and Quality Personnel for compliance with requirements.

Review and evaluate Contractor’s Quality document submittals.

Witness on-site and off-site material and installations tests for compliance with SAUDI ARAMCO standards.

Record legibly and accurately all controversial and non-complying construction practices, materials and equipment and report to supervisor detailed potential problems for early resolution.

Write inspection reports and initiate Non-Conformance Reports

(NCRs), Worksheets (WSs) and Equipment Deficiency Report

(EDRs) as needed

Professional Experience: SEP 2009 TO SEPT 2010.

Worked as QC Manager

CLIENT : SAUDI ARAMCO

Contractor: SINOPEC INTRN’L. PETROLEUM LTD.

Project : AL-WASEA BULKPLANT PROJECT

Monitor and/or perform quality activities at all stages of projects.

To Assure that contractor’s work is in compliance with SAUDI ARAMCO Engineering requirements, standards, procedures, specifications, and Schedule Q of the project contract

Perform “Hold”, “Witness” and “Surveillance” inspections and tests at manufacturing facilities or construction sites to ensure compliance with SAUDI ARAMCO requirements and project specifications.

Inspect material and equipment as applicable to ensure compliance with SAUDI ARAMCO requirements for proper handling, storage and protection at SAUDI ARAMCO facilities and/or construction sites.

Monitor Contractor’s Quality Systems, records and Quality Personnel for compliance with requirements.

Review and evaluate Contractor’s Quality document submittals.

Witness on-site and off-site material and installations tests for compliance with SAUDI ARAMCO standards.

Record legibly and accurately all controversial and non-complying construction practices, materials and equipment and report to supervisor detailed potential problems for early resolution.

Write inspection reports and initiate Non-Conformance Reports

(NCRs),Worksheets(WSs) and Equipment Deficiency Report (EDRs) as needed

To Ensure the field quality system is implemented and maintained throughout the construction phase as mentioned in this Project Documents /Quality Plan.

Familiar with all documentation references as outlined in the contractfor Construction/Quality Requirements.

To liaise with Client for all Construction / inspection requirements as per the site Inspection and test plan (I.T.P) to meet project specification.

To monitor the subcontractors,Site Construction / quality requirements and ensure compliance to the Relevant procedures.

To ensure all tests carried out are done as per approved procedures and that the Projects are prepared for final commissioning and hand over.

To monitor any Non conformities (NCR’S) during the construction phase.

To ensure that all log/data books are implemented and updated throughout the project.

Any problems related to quality are to be recorded and addressed accordingly.

Monitor monthly Quality Management Reports of accomplishment.

To prepare weekly Progress Reports, Project quality Index for the assigned project.

To prepare procedure Qualification Record.

To prepare Construction procedure specification.

To prepare welder's performance Qualification Report.

To prepare process plan chart.

Verification of material certificates as per TDC

Conduct surveillance as per ISO 9001 procedure and co –ordinate with contractors.

In-charge of all documentation requirements at site & compile the Manufacturing Dossier at the close of the project. Professional Experience : JAN 2003 TO SEPT 2009.

Worked as QC Manager

CLIENT : SAUDI ARAMCO

Contractor: HIDADA LTD.

Jeddah, Kingdom of Saudi Arabia

Coordinating the day to day activities of Construction / Quality related matters with a team of site engineers, Fore men, QC Inspectors and fabricators etc.

Monitoring for the Dimensional, NDT, Inspectors on the daily work task.

Suggesting corrective action for Non-Conformances raised by QC Inspectors / Clients regarding Quality matters.

Control and monitoring of Welding Activities at site and Welder Record

(WPS & PQR) and Welding Consumables.

Reviewing of the Quality Manufacturing Dossier at the closure of the Project.

Job involves close coordination with the General Manager, Client, QA Manager & Site Engineers.

Preparation of Method Statement for any site repair activity.

Reviewing & Submittal of QA/QC documents relevant to a particular project site.

Preparation of RT location map as per API 650.

Familiar with codes like ASME Sec I, ASME Sec VIII Div.1, ASME Sec V, ASME Sec IX, API 650, API 620, API 1104, AWS D1.1 & relevant ASTM Standards.

Handing over the Projects & Final commissioning.

Conduct surveillance as per ISO 9001 procedure and co –ordinate with contractors .

Process control for controlling monitoring of work ship, fabrication and Surface preparation activities in order to meet the specified quality requirements.

Proper co-ordination of international department / planning / material / procurements to expedite quality requirements .

Handling leakage and pressure test of main and truck lines .

Conducting daily meeting / Technical and non technical problems with lead engineer and work staff updating .

Other Major Projects Handled with SAUDI ARAMCO

SAUDI ARAMCO – Projects like Electro mechanicals, Plant/Refinery piping’s, pipelines, civil works like Office Buildings, Substations, Control Rooms, Concrete sleepers, Dyke Wall, Storage tanks, Tank Foundations and Excavations, Sewers, Trenches and underground cabling, backfilling and Compaction.

2 GRADE GASOLINE PROJECT, JIZAN,ABHA,JEDDAH&DUBA

(CLIENT-SAUDI ARAMCO)

QC Manager Job Type: Electromechanical/Civil based/cathodic protection.

TIHAMA POWER PLANT, QHUNFUDA

CLIENT :AL-TOUKHI

QC Manager Job Type: Electromechanical/Civil based

REBIGH POWER PLANT, RABIGH

CLIENT :MITSUI & TECHNICAS REUNIDAS

QC Manager Job Type: Electromechanical/Civil based

DHT COMPLEX – RIYADH REFINERY

(SAUDI ARAMCO)

QC Manager Job Type: Civil based

SULPHUR RECOVERY UNIT – RIYADH REFINERY

(SAUDI ARAMCO)

QC Manager Job Type: Mechanical/Piping based

HARADH GAS PLANT

(SAUDI ARAMCO)

QC Manager Job Type: Civil based

HAWIYAH GAS PLANT (SAUDI ARAMCO)

QC Manager Job Type: Civil based

SAUDI KAYAN – Complete Tank Farm

CLIENT: SNAMPROGETTI / PUNJ LOYD

HEATER CASING, RADIANT & CONVECTION COILS – RIYADH REFINERY(SAUDI ARAMCO)

QC Manager Job Type: Replacement Project for Crude and Vacuum Heater.

ORYX GTL PROJECT – RAS LAFAN

CLIENT :TECHNIP ITALY

QC Manager Job Type: Civil base.

CRACKING TAR SETTLER VESSELS - YANPET - ID-3-M, Height 3.75m

ROYAL COMMISSION POWER PLANT - YANPET

(ASME VESSELS) 4 Nos. Vessels

GIBSON POWER PLANT PROJECT

(FOSTER WHEELER ENERGY CORPORATION)

Steel Structures

SHOAIBA POWER PLANT PROJECT

(ABB-CE / USA)

Steel Structures

JEDDAH ISLAMIC SEA PORT

(SAMSUNG HEAVY INDUSTRIES)

7 Rubber Tired Gantry Cranes

JEDDAH ISLAMIC SEA PORT

(FANTUZZI HEAVY INDUSTRIES)

4 Containers Handling Cranes

Professional Experience : Feb 2000 TO JAN 2003 .

Worked as QC Manager

CLIENT : Al- Rajhi & sons

Contractor: JAMJOOM CONSULTANT, Jeddah, Kingdom of Saudi Arabia Nature of Work

Coordinating the day to day activities of construction / quality related matters with a team of site engineers, foremen, qc inspectors and fabricators etc.

Monitoring for the dimensional, NDT, inspectors on the daily work tasks.

Suggesting corrective action for non-conformances raise by qc inspectors / clients regarding quality matters.

Control and monitoring of welding activities at site and welder record

(WPS & PQR) and welding consumables.

Reviewing of the quality manufacturing dossier at the closure of the project.

Job involves close coordination with the general manager, client, QA Manager and Site Engineers.

Preparation of method statement for any site repair activity.

Reviewing and submittal of QA/QC documents relevant to a particular project site.

Preparation of RT location map as per API 650.

Familiar with codes like ASME Sec I, ASME Sec VIII Div.1,ASME Sec V, ASME Sec IX, API 650, API 620, API 1104, AWS D1.1 & relevant ASTM Standards.

Handling over the projects and final commissioning.

Conduct surveillance as per ISO 9001 procedure and co-ordinate with contractors.

Process control for controlling monitoring of work ship, fabrication and surface preparation activities in order to meet the specified quality requirements.

Proper coordination of international department / planning / material / procurements to expedite quality requirements.

Handling leakage and pressure test of main and truck lines.

Conducting daily meeting / technical and non technical problems with lead engineer and work staff updating.

Major Projects Handled:

AL-WATANI GYPSUM FACTORY, Yanbu Al-Qasub

AL-MADA GYPSUM FACTORY, Yanbu

NATIONAL GYPSUM FACTORY- Al-Kharj

ABDUL LATEEF JAMEEL(TOYOTA EXTENSION),Jeddah

SHAR BATHLY VILLAS-14 nos. of duplex villa’s in Hamrah and Mahmoodiya

Professional Experience: Jan 1998 TO JAN 2000 .

Worked as QC Engineer

CLIENT : Trading & Development Partnership (TDP)

Contractor: AL-OTHAIBI TRADING & CONTRACTING

Olaya, Riyadh, Kingdom of Saudi Arabia

Nature of Work

Handling Project Construction Department to meet the project needs.

Scheduling and controlling the civil work.

Complete in charge of Industrial type projects which include RCC framed structure building.

Project management and total supervision for large residential developments / township.

Interaction with landholders, architects and contractors for time bound successful completion of projects.

Experience in price analysis, supplier selections, value engineering.

Liaison with various departments and good public relations in general.

Supervision of interior decoration of buildings. Professional Experience: Jan 1996 TO JAN 1998 .

Worked as QC Engineer

CLIENT: HCL & Perot Systems

Contractor: AXIS ENGINEERING, Bangalore, India

Nature of Work

Management, site development, grading oil underground utilities such as water tanks, water drainage, drinking and fire water hydrant etc.

Supervise the site to meet the project needs.

Review of material shop drawings of structural and architectural discipline according to the specification standards.

Incorporating the site change / deviation.

In charge of all sites related to the contractor.

Project scheduling, site, site lay out, supervision labor management.

Preparation of payment certificates.

Monitor monthly progress of accomplishments.

Supervision Committee of Makkah - Taif Projects

Email: ady99h@r.postjobfree.com

TEL: (011) 463****-*****

FAX: (011-*******

TO: FROM:

Yahya Mustafa - Project Manger Engr. Saleh Almana, Chairman of Supervision Alayuni Investment & Contracting Co. Committee, SWCC - MTST Project Ref. No : AH-SF-L-0017 Our Ref. : SF-AH-L-0004

Date :31-Dec-2018 Date :17-Jan-2018

CC.

Total Pages: (1)

Project: Makkah Phase(II) – Taif Phase (I), Strategic Tanks Project – 20906 SUBJECT:

Dear Mr.Yahya Mustafa.

Best Regards.

Engr. Saleh Almana

Chairman, Supervision Committee

Page 1 of 1

Consultant is responsible to check accuracy of information transmitted above, compliance with tender specification and that none of the comments constitute a variation order. Makkah Ph. II Taif Ph. I Strategic Reservoirs

With reference to above subject, the Proposed CV of QA-QC Manager (Syed Umar Khalid) is Approved. Proposed CV of QA-QC Manager (Syed Umar Khalid)

Mr.Osama Al Najim, Project Engineer - SWCC

Engr.Mohammad Alhajeh - Project Manger SCEC (Khatib & Alami) Engr.Sheeraz Gul Memon, Acting Project Manager - K&A Consultant Meridian Quality

Management Professionals

Office No. 1195, Sitra Mall, Building 574,

Block 611, Al-Hamriya, Kingdom of Bahrain

T: +973-**-***-***

E: ady99h@r.postjobfree.com

F: +973-**-***-***

W: www.meqmp.com

This certificate can be verified through sending an email on ady99h@r.postjobfree.com This certificate is only valid for the person named above. This certificate is awarded to

Mr. UMAR KHALID

In recognition of successfully attending the course & the exam on:

“ISO 9001:2015 QMS Auditor / Lead Auditor Training” Course was conducted on 14-18 February, 2021

Organized By

Meridian Quality Management Professionals

(MEQMP)

Authorizing Signature

Certificate #: 100*********

Certificate of Achievement



Contact this candidate