Waseem Sami Qasim Odeh Page * of *
WASEEM SAMI QASIM ODEH.
ACTING PROJECT MANAGER / MEP & ELECTRICAL
CONSTRUCTION MANAGER / SR. ELECTRICAL LEAD
ENGINEER - (PARSONS - PMC & PMT)
Project Management Foundations Courses with pass certificates. EXPERIENCE PROFILE
With over 18 + years with17 years Gulf experience (UAE & KSA) in the construction business, design, construction & management, I accomplished high Quality, Safety & Economy as Acting Project Manager, Deputy Project Manager, Construction Manager, Lead Engineer, Sr. Electrical Engineer, Coordination between disciplines in the design phases and construction phases, and Client Management, with demonstrated leadership on challenging multi-faceted projects in United Arab Emirates & Saudi Arabia in various capacities and responsibilities.
A highly qualified & technical Engineer with 18+ years of experience with pass certificates of Project Management Foundations Courses and education with extensive expertise in Construction engineering and project management gained from many years of progressive work experience. Successfully, tendering, analysis, High Rise Towers, 5 stars hotels, shopping mall Residential complex villas, commercial buildings and infrastructure, substations with all related LV & MV electrical engineering works, switchgear and MEP works. Competent in designing, planning, and reviewing technical drawings as well as estimation, commissioning, installation, testing and overall site supervision of construction works. Dedicated engineer with outstanding problem solving, supervision, time management, leadership, and technical skills. Aspiring for a more challenging and career rewarding Senior Engineer work profile within a reputed company.
RELEVANT PROJECT EXPERIENCE
Saudi Parsons (SAPL), Wa'ad Al Shamal Industrial City –Phase 1b - MODON – KSA – Turiaf.
–March 2018- Till Now, Deputy Project Manager / Construction Manager. I have Managed, leading Contractor and Facilities Management Service Provider and constructed heavy projects as following:
1) Infrastructure Phase -1 Project : landscaping, site developing including engineering Works for civil, MEP networks, asphalt construction, Infrastructural projects (systems coordination in design stage and sequences & logic of the activities during construction of roads, potable water, drainage & storm water systems, mechanical
/ electrical Distribution Unit Substation 33 KV / 400 V AC ( T-RMU, Q-RMU, Transformers &LV Panel,U/G Cables, LV Cables, MV Cables, street lights system networks, Feeder Pillars, Pump station, Standby Generator ( 1000 /500 KVA ). PROFESSIONAL
QUALIFICATIONS
Bachelor of Science
in Electrical
Engineering
Palestine Technical
University, Palestine.
Cumulative
Percentage 82.2%
very good.
PROFESSIONAL
AFFILIATIONS
• Member Engineer –
Saudi Council of
Engineers,
Registration, KSA
• Member Engineer –
Jordanian /Palestinain
Engineers Association,
Jordan.
• Project Management
Foundations Courses
with pass certificates.
YEARS OF EXPERIENCE
18+ years (17 years
Gulf experience).
YEARS WITH PARSONS
8 Years
NATIONALITY
Jordanian.
Waseem Sami Qasim Odeh Page 2 of 7
2) WAS Trumpet Interchange of Road 7 with Highway 85 (Bridge between Waad Al- Shamal city and Highway Road 85): Trumpet Interchange Component: Road 7 Extension, Bridge over Highway 85, Ramp 01, Ramp 02, Ramp 03, Loop 01, Highway 85 Lane extension. Including the following works: 1-Road Works (Earthworks (Cut &Fill), Aggregate Subbase & Base Courses, Bituminous Construction, Sidewalks, Guardrails, Kerbs, Traffic Control Devices
(Road sign & Markings).
2-Trumpet Interchange: Structural Excavation & Backfilling, Sub-structure
(Abutments & Pier), Super structure (Precast Girders, Deck Slab). 3-Electrical Distribution: Road Lighting (LV cable, Poles, luminaires), Earthing System, Road Crossing Duct, Lighting Panels, M.V complete system with all related Substations including RMU and Transformer.
4-Storm Water: Storm Drainage Culverts (RCP & GRP), Concrete Chambers (Catch Basin & Drop Inlet), Concrete Lined Ditch, Grouted & Packed Riprap for embankment & Culverts.
3) Substation Project: Construction of MODON 380/132/33 K.V BSP- phase (1). 4) Over Head Transmission Line: Construction of one (1) 380 KV OHTL between Waad Al Shamal BSP - Modon BSP (Ckt 1& 2) Project.
Responsibilities and Roles:
• Managing the Clients and updating them of the design & construction stages.
• Managing and guiding Interface with all Parties including: end user, stakeholders, Local Authorities ( Such as SEC, NWC, STC, Aramco, Maadan),Lead Designer,Consultants, Sub-consultant and Contractors & arranges meetings and preparing presentations with minutes of meetings, review of all related documents submission to related authorities and follow up with ongoing submissions to finalize and obtain the required permit / NOC / approval and provide feedback to the team for actions required with related support documents.
• I gained high skills in evaluating change orders and claims, process contractor’s request for compensation relating to changes, negotiations, and dispute resolution.
• I have planning & commercial experience in both client and contactor roles.
• I gained high ability and experience to manage a workforce, co-ordinate/resolve issues, plan and organize works in considering full technical details, and resolve engineering technical problems on site to deliver a safe, cost effective, and practical solution.
• Effective time management skills and ability to meet deadlines.
• working with multi discipline functions, Architects, Sanitary, Electrical & Mechanical, designing, detailing, and preparing specification & contract documents, reviewing contractor’s submittals, technical queries and engaging in checking and approving drawings for international consulting bureaus for major projects.
• With a background in design and construction management, I gained a high experience in: A) Constructability review of design packages using the logical sequential and overlap of construction activities with multi discipline functions (Electrical & Mechanical). B) can produce an animation simulation of the construction sequence, for selected activities or for the entire program, to test the program sequence on the computer screen or for presentation that makes it very easy to Clients, non-construction, or professional persons to understand work schedule.
C) Co-ordinating the major temporary works in the schedules and producing the required documentation on time.
D)Helping and coordinate the contractor work activities on the project including monitoring schedules.
Waseem Sami Qasim Odeh Page 3 of 7
E) I know the proper reports to request from the planner, for monitoring the work progress, money spending, productivity, material procurement, and documentation submittals in details or/and Client level.
F) Worked for two years in Solicitor Office studying contractors’ claims & disputes by going through the contract documents, contract history and daily reports to provide the lawyers evidence refuting contractor’s claims in courts.
STRENGTHS:
• Progressive Civil, MEP and Electrical Engineering Work Experience.
• Competencies in Overall Project Management.
• Proven in Infrastructure /Commercial and Residential Project.
• Project Planning, Scheduling, Cost Control.
• Versed in Site Administration – Report Preparation.
• Consistently Meet Project Deadlines & Set Budgets.
• Strict Compliance with HSE Policies & Standards.
• Preparing and reviewing all kind of submittal (shop drawing, material…etc).
• Good Coordination with Cross Functional Team.
• Managed all aspects of buildings and site installations – Mechanical & Electrical.
• Ability to commission all mechanical systems connected with building.
• Ensure that all civil & electromechanical activities are carrying out in accordance with Project Quality Plan (PQP) and appropriate ITP as per the contract’s requirements.
• Review method statement for Civil and MEP Works.
• Coordination and administration of civil & MEP related materials, systems and shop drawing submittal.
• Liaise and supervise the sub-contractors for the civil & MEP works.
• Provide the Project Manager with daily, weekly and monthly reports covering the progress of all Site activites and works (civil and electro-mechanical works).
• Monitor and control to ensure that the activities of Civil & MEP subcontractor(s)’ personnel in line with the project programme and schedule.
• Coordinate MEP subcontractor work on site with civil and other subcontractors for sequencing & smooth flow of works.
• Ensure that all resources such as manpower, machinery / equipment are properly and effectively utilized to maintain the planned productivity.
• Review and verify Civil and MEP subcontractors’ payment certificates.
• Provide assistance to the contracts department in resolving contractual issues, if arises any.
• Coordinate with local department & authorities such as SEC, NWC, Local authorities...etc for the timely commissioning.
• Ensure that safety rules are adequately implemented by the concerned personnel and that they are practiced. Ensure that Project main contractor and subcontractors adhere to Project Safety Plan and Regulations.
ACHIEVEMENTS
Waseem Sami Qasim Odeh Page 4 of 7
• Achieved consistent career progression from Site Engineer to Project Engineer to Senior engineer position then finally Deputy Project Manager.
• Successfully completed various Commercial & Residential electrical projects within allocated budget and set time frame.
• Set record in team leadership and task management; remarkable in coordinating workers, materials and equipments as per specifications for all phases of project execution.
• Demonstrated competencies in handling cost estimation and technical specifications for shop drawing and material submittals preparation, commercial and technical evaluation.
• Proven proficiency in implementing HSE systems in construction activities and setting up required standards.
• Developed network with existing projects and their stake holders, consultants, contractors and authorities.
Construction Manager - Electrical, – Dewan Architects & engineers – Project management and supervision – KSA, Malathek Towers (Office Tower = 32 Floors+ 3B- and Residential Towers – 2 Towers – Each tower =18 Floors + 3B F) –King Fahed Road
- June 2016– Feb. 2018
Project Responsibilities:
A leading Residential and office Towers Project : Distribution Unit Substation 13.8 KV / 400 V AC ( RMU 1000 /1500 KVA Transformers &LV Panel ) U/G Cables, LV Cables, MV Cables, BMS, Low current ( FA,PA, CCTV, DATA, I.C and CO Systems), Light and power system, Lighting Protection and Earthing system networks, Feeder Pillars, Pump station, Standby Generator (1000/500 KVA ), and leading Contractor and Facilities Management Service Provider with design review and preparing all kind of submittals such as shop drawing, method statement, martials submittals and sequence of works with full coordination.
Sr. MEP Engineer – SAPL, Saudi Arabian Parsons, MOH- Qateef Al-Badrani Project
(Ministry of Housing Program) –Feb. 2015– May 2016. A leading Infrastructure Project: Distribution Unit Substation 13.8 KV / 400 V AC (T-RMU, Q-RMU, 1000 /1500 KVA Transformers &LV Panel ) U/G Cables, LV Cables, MV Cables, street lights system networks, Feeder Pillars, Pump station, Standby Generator ( 1000
/500 KVA ), and leading Contractor and Facilities Management Service Provider. Project Responsibilities:
• Supervise control & monitor all electrical work at site ensuring strict adherence to contract requirements.
• Prepare progress report, review submittals, verifies materials delivered at site for electrical works.
• Coordinate with other disciplines, participate in coordination and resolve conflicts of utilities when required.
• Perform factory visits to witness test of Electrical materials and assurance of materials.
• Review shop drawings, material submittals, issue NCR, monitor electrical work. Sr. Electrical Engineer – Axal Arabia Co., (Saudi Bin Laden Group), KSA, Saudi Arab National Guard) – Dammam - 414 nos. Of villa (soldiers & officer villa)– April 2012–Jan 2015. Project Responsibilities:
AREAS OF EXPERTISE:
1- Electrical Engineering:
Waseem Sami Qasim Odeh Page 5 of 7
• Plan direct and control complete electrical installation, implementation, testing, commissioning, and Maintenance based on local and international standards.
• Analyze system needs, capacity and cost to determine feasibility of project and develop plan.
• Prepare needed criteria, procedures, reports and plans for successful conduct of project considering site.
• Preparation, facility validation, installation, quality assurance and testing.
• Inspect electrical equipment, instruments, and components to identify defects and need for adjustment or Repair as well as to ensure compliance with specifications - safety codes.
• Perform operational, maintenance, and testing procedures for components, equipment and systems.
• Recommend repair or design modifications based on factors such as cost and system capabilities.
• Improve technical knowledge by staying abreast with the latest trends in the relevant industry. 2- Project Management:
• Organize, lead, coordinate and monitor work progress to ensure delivery of projects within parameters of time, cost and quality consistent with client requirements.
• Serve as focal point in all activities to ensure smooth functioning of day-to-day activities.
• Monitor site progress and prepare projections to maintain objectives and agreed milestones.
• Schedule activities of workers. Assign work based on material and worker requirements.
• Assist in material sourcing, acquiring of quotes and negotiating for the best deals.
• Provide technical support for estimates during tender periods: prepare and break down items in BOQ for pricing, preparation of tender document for subcontractor and supplier.
• Foster timely availability of all approved drawings, schedules or technical data from consultant/client. Ensure that revised drawings and documentation are superseded in the correct QA/QC manner.
• Implement HSE Systems to ensure that required standards are achieved.
• Ensure cost variation, time extension claims, and other records’ log are maintained and constantly follow up.
• Participate in site meetings and periodic checks. Discuss project status and work priority. Electrical Project Engineer, MAPCO, Abu Dhabi-Al-ain (Wahat Hili Mall & 5 stars Hotel) – June 2009 to Feb. 2012.
Project Responsibilities:
• Oversaw construction drawings, drafting shop drawings adhering to project specifications, commercial or legal aspects, and detailed engineering on Infrastructure and Building projects.
• Supplied, installed, and tested MV& LV panels, main distribution boards, motor control Centre’s, sub- main distribution boards, distribution boards, control panels and feeder pillars for various projects.
• Handled procurements, ensure availability in full compliance within set time frame, and deliver directives according to the specification and compliance statement.
• Developed data sheets for electrical equipment; arranged technical submittals for the drawings or materials for obtaining approval from the consultant. Arranged inspection with the consultant/ client.
• Organized meeting with the consultants/contractor to evaluate the design. Revised designs as necessary based on the feedback received from them and accordingly proceed with final submittal. At the same, kept track on contract variations to accommodate all additions/ deletions in the main project program.
• Followed up consistently on project budget forecasts to ensure timely completion of projects.
• Dealt tactfully with local authorities including project clients, consultants, sub-contractors, and suppliers.
Waseem Sami Qasim Odeh Page 6 of 7
Electrical Project Engineer, MAPCO, Abu Dhabi -Ruwais – March 2008 to May 2009, Ruwais Housing complex ADNOC - 17 buildings+ 5 Substations. Project Responsibilities:
• Played vital role as Electrical Project Engineer for the completion of the 124,000,000 AED worth project for ADNOC Abu Dhabi. Closely worked with Consultant& ADDC. Site Electrical Engineer, Thermo L.L.C, Dubai, U.A.E, Uptown Motor City Area One
(2B+G+11) Three Towers – October 2006 to Feb. 2008. Project Responsibilities:
• All the routine Infrastructure Works: Installation & Laying of LV U/G Cables, MV Cables, streetlights system networks, Feeder Pillar, substations (13.8 KV / 400 V AC) as per approved Materials and prepare shop drawing for streetlight, L V Cables, MV Cables & substation earth layout & prepare shop drawing for (STP) Sewage Treatment Plane for Electrical lay out.
• Engineer’s designs and specifications to determine the required sizes, types, capacities and power of electrical fittings with associated work .
• Monitor the electrical work conducted to ensure accurate and timely installation.
• Report on the progress of electrical works as directed by Project manager.
• Coordinate with other project personnel to insure the deadlines, procedure and project requirement.
• Require subordinates to adhere to company safety and quality standards as per published policies and procedures.
• Liaise with client and main contractor’s coordination engineer.
• Verify the accuracy of shop drawings and their correspondence to consultants’ designs to ensure that the work conducted meets contracted specifications.
• Supervises subordinates during project development and implication phases.
• Monitor project expenditures and budgets to anticipate any discrepancies that might affect profit.
• Evaluate officially received notice of variation in order to recommend appropriate action and determine changes in fittings and/or specifications affected.
• Finalize shop drawing & material as per regulation.
• Supervise and site monitoring of all electrical system.
• Fire alarm, Power, lighting and low current system installation.
• Reviews look ahead schedule provided by planning for forth coming weeks.
• Prepare load distribution schedule.
• Works and arrange the require resources.
• Coordinate with Consultant / Main contractor for any foreseen inspection and get clearance from them.
• Coordinate with team members and management.
• Quantity takes off for all electrical systems.
Site Electrical Engineer Al-Shaheen General Contracting, Palestine/West Bank – Tulkarem, Al- Dana Building-Commercial complex, B+G+7 nos. of floors – May 2006 to October 2006.
Trainee Electrical Site Engineer Al-Hamodi General Contracting, Palestine/West Bank – Tulkarem, Engineering Building No. 2 at the University of Palestine Technical - Khadouri –
(G+7 Floors) – Marach 2005 to April 2006.
Waseem Sami Qasim Odeh Page 7 of 7
Project Responsibilities:
• Monitor the electrical work conducted to ensure accurate and timely installation.
• Report on the progress of electrical works as directed by Project manager.
• Coordinate with other project personnel to insure the deadlines, procedure and project requirement.
• Verify the accuracy of shop drawings and their correspondence to consultants’ designs to ensure that the work conducted meets contracted specifications.
• Supervises subordinates during project development and implication phases.
• Monitor project expenditures and budgets to anticipate any discrepancies that might affect profit.
• Evaluate officially received notice of variation in order to recommend appropriate action and determine changes in fittings and/or specifications affected.
• Finalize shop drawing & material as per regulation.
• Supervise and site monitoring of all electrical system.
• Prepare load distribution schedule.
• Works and arrange the require resources.
SKILLS AND ABILITIES
• IT PROFICIENCY: AutoCAD Viewer, MS Office (Word, Excel, PowerPoint, Outlook). CONTATC INFORMATION
• E-mail: ***************@*******.***
• Mobile: +966*********.
REFERANCES
• Eng. Walid Al - Janabi – Project Manager –PARSONS - London - Mob: +447*********.
• Eng. Hasan Ali – Sr. Projects Manager –PARSONS - KSA - Mob: +966*********.
• Eng. Bassam Mansour – Project manager -PARSONS – USA – Mob: +1-910-***-****.
• Eng. Adel Al Quraan – Quality Manager – PARSONS - KSA - Mob: +966*********.
• Eng.Yasser Abbas – Resident Engineer – Dewan Architects & engineers - KSA - Mob:
PERSONAL DETAILS
• Date of Birth: 24 – 01 – 1982.
• Marital Status: Married.
• Driving License: Palestinan /UAE / KSA Light Vehicle.
• Languages: English & Arabic.
• Iqama Status: Transferable.
Sensitive
YEARS 18 TOTAL
EXPERIENCE
17 YEARS Gulf (KSA & UAE )
Waseem Odeh EXPERIENCE
Acting Project Manager – MEP & Electrical Construction Manager– Sr. Electrical Lead Engineer. PMP Foundation courses with pass certificates .
BSc in Electrical Engineering – Power & control
CAREER SUMMARY
Waseem is PARSONS Program Acting Project Manager /Electrical Construction Manager, A highly qualified & technical Engineer with 18+ years of experience with 17 years Gulf experience (UAE & KSA) and education with extensive expertise in electrical engineering and project management gained from many years of progressive work experience. Successfully managed LV & MV electrical engineering projects, switchgear, tendering, analysis, High Rise Towers, 5 stars hotels, Shopping mall Residential complex villas, commercial buildings and infrastructure, substations with all related MEP works. Competent in designing, planning, and reviewing technical drawings as well as estimation, commissioning, installation, testing and overall site supervision of electrical works. Dedicated engineer with outstanding problem solving, supervision, time management, leadership, and technical skills. Aspiring for a more challenging and career rewarding Senior Engineer work profile within a reputed company.
Waseem has experience appears to be concentrated in Engineering / Techniques, with exposure to Information Technology / Project Management. Waseem has 18 years of work experience, with 8 years of management experience, including a mid- level position. Expert concentrated in the field of Construction, Erection & Commissioning, Process Enhancement, Permit process, dealing with authorities, Relationship Management and Quality Assurance of MEP works. Presently associated with PARSONS - PMC, Turiaf, KSA as Lead Electrical engineer - Acting Construction Manager. Adept at managing MEP engineering operations involving design & development, developing detailed drawing and coordination with internal departments. A keen planner & implementer with expertise in managing entire project operations with key focus on top line
& bottom-line profitability by ensuring optimal utilization of resources. Skillful in managing erection & commissioning activities involving resource planning, in-process inspection, team building and coordination with internal / external departments. Deft in managing maintenance operations and taking cost-saving initiatives to optimize efficiency of machines and enhancing overall organizational efficiency. An astute professional with ability to motivate subordinates in optimizing their performance levels and possesses excellent analytical, organizational & interpersonal skills. PARSONS
ON PMC & PMT
Wahat Hili Mall & 5 stars Hotel (Rotana)
, UAE - Alain. Dubai Motor City
UAE –Dubai
Malatheck Towers – Residential &
Commercial – KSA – Riyadh .
King Abdullah Project for Waad
Al-Shamaal City Development -
Industrial city – KSA – Turiaf .
Saudi Arabia Ministry of Housing -
Al Qatif Housing Project – KSA –
Qatif .
Ministry of National Guard Housing
project– KSA – Damam / Khobar .
Ruwais Housing Complex – UAE –
Ruwais .