OSCAR G. DELOS REYES
ady80o@r.postjobfree.com
Mobile:
mailto:ady80o@r.postjobfree.com
OBJECTIVES:
-Prepare Organizational Structure Operation Plan of Team member .
-Forecasting resource Plan and making the smooth implementation of Project up to
Target Date.
-Materials forecast should be coordinate engage to Team leader Designer .
-Coordinate Logistic Head of forecasting Batch prior to monitor all issue materials
from first deliver project .
-Monitor all ongoing project at tracker listed and escalate Project
-Attending all priorities meeting for supporting company Plan .
-Knowledge to use EXCELL for MS project
SUMMARY OF JOB DESCRIPTION:
-A telecommunications supervisor / Manager is responsible for overseeing the work done by the technicians and coordinators who are required to install, maintain operation sin geographical areas.
-A telecommunications supervisor / Manager is also responsible for planning, organizing and supervising the work of subordinates in the installation, modifications and testing of telecommunications systems.
-A telecommunications supervisor / Manager is also responsible for repairing and maintaining of associated equipment’s of the telecommunications system.
-A telecommunications supervisor / manager also requires analyzing and troubleshooting communications systems to maintain Project and other state agencies telecom systems as per requirement or orders.
-A telecommunications supervisor Manager is also responsible for travelling to sites located across different cities in the country to install and maintain communication related equipment’s and attend user association or staff meetings at these locations.
-A telecommunication supervisor / manager is the employee of the telecom company who is responsible for emergency call outs and to perform emergency evaluation and repair of the communication systems throughout the respective state and in collaboration with other state agencies
WORK EXPERIENCE
MANPOWEROUTSOURCING / COMMSCOPE
QUALITY ASSURANCE AT FTTH PROJECT CONVERGE
ONEWORLD 17TH FLOOR
BGC PASIG CITY MANILA PHILIPPINES
JULY 04 2023 UP TO PRESENT
Check and Balance responsibility impose to Subcon.
Fiber Optic Splicing and Testing, troubleshooting, commissioning, and maintenance (ability to use OTDR, Power
Meter, light source VFL, etc.
Documentation for Testing results OTDR and Power meter (EXFO Software, Anritsu, JDSU and other OTDR
Software)
Understanding in UFB, FTTH and FTTU Schematic Diagrams and Engineering Plans.
Survey, assessing and planning before performing installations and assembly.
Operate Lightweight machineries such as hand tools and power tools for assembly, installation of fiber optic
equipment.
Configuring Equipment’s such as ONT (Optical Network Transmitter), Premises Equipment)
Installation and implementation of Structural Cabling, Fiber optic cable Closures and distribution Boxes, data or
LAN cables, Coaxial cables, transmission cables, RF cables, patch cables,
Experience with working live fiber closures and networks
Knowledge and Practice of Outside Plant Engineering (OSP) Construction and Operation (Aerial, Underground,
open trench, direction bore Construction)
Conduct site walk survey for data collection in aerial, underground, indoor facility necessary for the design.
Work with customers execute project work plans and achieve a high level of communication with clients and the
team
Hardworking, reliable, manage changes in daily tasks and priorities and willingness to learn new skills.
Always practice safety while working
Can survey and design fiber optic network such as Backbone, FTTH, FTTU, Tower. Computer Proficiency in MS
Ability to drive 4-wheel car.
Know how to read and revise plan with issue.
Implement standard PPE to all Sub-con
WORK EXPERIENCE
PROJECT SUPERVISOR
FIBERCOM/BAMACOM
TEKTITE BLDG. 19 & 20 FLR.
PASIG METRO MANILA
AUGUST 13,2019 – JUNE 15, 2022
Responsible to fix and settle all issue enclosed to FTTBS project.
Making redline for revision of ABP plan before acceptance.
Monitoring Project from time to time on O.S.P Teams.
Supervising Team working at ODF – ODF splicing inside FTTBTS cell room.
Actual inspection of all Hardware or pole dressing materials at every site.
Preparing BOM / BOQ / BILLING.
Responsibility to Prepare and inspect all materials Request needed before initiate project.
Authorized Safety for having a safety training as SO1.
Implement PPE to all workers at site.
Attend training for safety as SO1 with certificate.
Implement to record all foot mark of FOC layed.
Supervise Teams onsite inspection to ready for acceptance (F.A.T/P.A.T)
Handling Project FTTBTS,FTTH/ODN, IBS,FTTX,FITL,NGN,VDSL,NETWORK MIGRATION.
Assisting R.O.W - Permitting for R.T.A – DPWH – HPG/TMO – Municipal Permit.
Coordinate and follow up J.P.A (Joint Pole Agreement) and N.T.P (Notice To Proceed)
Attending all meetings provided by PLDT for monitoring all activities including Priority and ageing tickets / coordination at municipal and brgy.Permit Clearance.
Supervise Teams for regular wearing and use of PPE at any activities.
Overseeing sub-con Team Project and coordinate to deliver Projects on time.
Monitoring and executing Projects up to closing out Projects.
Meeting with PLDT personnel for setting Goal and Deadlines of on – going and for Implementation Projects.
Redline finish Project for ABP billing.
Prepare TA and AWD for all accepted Projects.
Planning, Executing, Monitoring, Controlling and Closing out Projects.
Coordinates Team and Process to deliver Projects on time with the desired outcomes aligned to objectives.
Allocating Task, setting Goals and deadlines
Handling documentation.
Materials forecasting for new Project and on going Project.
WORK EXPERIENCE
FIBERHOME MARIKINA - PROJECT ONE
KATIPUNAN COR KATIPUNANN EXT.
PROJECT SUPERVISOR/OPERATION MANAGER
C.Q.M DEPARTMENT / O.S.P
SEPTEMBER 10, 2018 – JULY 27, 2019
Implementing Task of Teams for Preventive Maintenance of PLDT telecom Facilities, Poi/LCP/NAP & telecom CABINET to MANHOLE of PRIMARY.
Supervising as QA in CQM/FOC Team for repairing High Loss /Los /Lo task .
Trained and guide CQM TEAMS of standard basic of cabinet Rehab .
Supervision and Monitoring opening / add NAP on site .
Supervising CQM teams while working at Manhole activities .
Measuring FOC Fiber break using OTDR/ Measuring copper cable using Dynatel.
Preparing R.O and Billing of CQM for P.L.D.T Project / FTTH Project Plans.
Supervising change of broken pole and erected new pole up to finish the task.
Attending all meetings provided by PLDT for monitoring all activities including Priority and ageing tickets / coordination at municipal and brgy.Permit Clearance.
Supervise Teams for regular wearing and use of PPE at any activities.
WORK EXPERIENCE
O.S.P SUPERVISOR /FIBERHOME – FIBERGEN
FIBER HOME /FIBER GEN FHCS-1
LBPSC C.Q BLDG. 2ND FLOOR
ALTERNATE ROAD,LEGAZPI BICOL
FEBRUARY 5,2018 – AUGUST 5, 2018
Surveying and Implementing of PLDT co. Project to all the Team Leaders.
Monitoring and Supervising site Project from area to area .
Coordinating all MRF from FIBER HOME Logistic to FIBER HOME ODN.
Preparation of all materials documentation needed of all Teams and assigning crew for Hauling and withdrawal of MRF .
Deployment of all Teams for every site project are strictly Monitoring .
Supervising and inspection routine of all teams in every site are usual constant by study and monitor to insure Project /Rectification
Preparation ofTracking site report activities and accomplishment of all Team leaders are documented using excel format and send it to dept. PM
Updating framework outline of overall site Project status progress by percentage for both project completed and and not yet completed.
Coordinate with FIBER HOME P.M andFIBER HOME ODN for Obtaining new Project Assignment /preparation for PRE- TEST, PRE-PAT and ACCEPTANCE.
Preparation of Billing requirements (BOQ, Certificate of Completion, Certificate of Pre-Acceptance, MRF/MRA, P.O Materials, preparation/redline. )
WORK EXPERIENCE
O.S.P SUPERVISOR FIBERHOME / PEAK SAN INTL.
PRIMUS@KNOWLEDGE
ORTIGAS,OAC BLDG. 3RD FLOOR.
NOVEMBER 11, 2017 – JANUARY 11, 2018 RESIGNED
Implementing FTTH project of PLDT .
Supervise Sub-con at Project site from time to time .
Coordinate at warehouse of Fiber home to ensure all the Materials needed for new Project of PLDT.
Coordinate with PLDT and Fiber Home for acceptance.
Mobilizing crews to their respective assignment at Paranaque, Cavite and Batangas site .
Handling and Supervise All left-over PLDT Project by Huawei until completed at Bicol region and Masbate
Responsibility to enforce the PPE safety .
Supporting and checking Fiber Optic splicer as well as their splicing tools and machine.
Responsible for implementing strict policy of standardization of Globe company
Monitoring and supervising at Globe Telecom MIGRATION from copper – Fiber.
WORK EXPERIENCE
CQM SUPERVISOR / ASRAR SOLUTION INC.
PROTEK TELECOMS SUPPORT INC.
COMMONWEALTH, QUEZON CITY.
APRIL 16,2017 – OCTOBER 16,2017
Supervising and assist to Repair and Fix sag cable of P.L.D.T CO.
Responsibility to guide and supervise my crews by splicing the P.L.D.T copper cable and Fiber optic cut cable up to midnight until finish .
Responsibility of assisting our crews to attached DEG, RL,CA,2A Pole clamp of P.L.D.T
Coordinating to P.L.D.T Supervisor for getting Repair Ticket and materials.
Responsible for mandatory checking of all PPE safety and Accountabilities Materials for every crew.
Responsibility of Going around the sites to check and verify the status of sites .
Responsible for updating all reports from P.L.D.T co. by sending thru email in excel format.
Replacement of broken / damage pole .
24/7 on- call duty for emergency task .
WORK EXPERIENCE
O.S.P TELECOM SUPERVISOR
AL JAIDAH GROUP CO.
DOHA, QATAR
05/08/2011 – 11/ 01/ 2012
●O.S.P Supervisor responsible is to monitor and supervise the Installation& Repair, Telephone Cable repair, Laying Fiber Optic cable, dressing and bunching cable of all subordinates.
●Responsible of implementing project plan to all the crews under my supervision.
●Supervisor Responsibility to support our technician by testing fiber optic and copper cable.
●Supervisor responsible to overseeing the Install ATB/ONT Modem (splicing drop fiber to fiber pigtail inside ATB and connect fiber Patch cord from ATB to ONT) of technician.
●Responsible of coordination to FTTH project Supervisor of HUAWEI/Q.Tel co.
●Responsible for repairing and maintaining the works of the Splicer in Fiber Optic and technicians crew.
●Implementing of analyzing and troubleshooting by Measuring Fiber Optic dB loss using OTDR( Yokogawa AQ7275,EXFO FTB 100B,IDEAL 33-960,FLUKE OFP-100 SERIES.
●Responsible for supporting cable Laying crews or civil crews
WORK EXPERIENCE
AREA TELECOM SUPERVISOR
AL BADIE GROUP CO.
ABUDHABI, U.A.E
03/25/2008-10/01/2010
Supervisor responsible by monitoring and implementing standard Telecom job before and after install and repair new S.O ( SERVICE ORDER )
Responsible for 24/7 crews to meet and response the emergency situation of telecom sites.
Responsible to submit all updates reports thru email by using Excel M.S
Responsible to coordinate the installing of Patch Panel inside the building of Military base with Cat5e(12,24, 48,72,96,100 Port)and Cat6(12,24,48 Port) Patch Panel.
Responsible to acconmpanied our crews to Install PABX equipment inside the building of military base.
Responsibily to observe the Test and Repair of ADSL line at military net base
WORK EXPERIENCE
AL SHARQ OFFICE CO.
RIYADH, K.S.A
08/25/2001- 06/29/2003
Splice and Test fiber optic cable at Under Ground Manhole.
Splicing copper cable at Under Ground Manhole.
Laying Dark Fiber on Topology
Measuring of dB loss and fault of fiber Optic cable Using test Equipment OTDR (IDEAL,YOKOGAWA) and Copper cable ( Dynatel710,Dynatel 965MC,Bico Test 1625T,Riser Bond 1205 T).
Locating cable route and tracing burried cable Using cable locator (Dynatel500 and Dynatel2273).
Preparation of all types of cables (PES, CES,CEFE) European and American cables.
Binder group cable, Grounding and Bonding of cables.
Troubleshooting and repair of lines and cable from MDF To Subscriber
Instruments.
Install New Telephone cabinet(Siemens and Huawei) and DPs.
Work in Cut-Over project by transferring old working lines into new cable.
Install and Test ADSL cable using ARGOS 44.
Supervising civil works Labor by Laying Fiber and copper cable.
Installing Data & voice patch panel inside Telephone cabinet.
Installing ODF and Splicing Fiber Optic inside 42U Telecom Cabinet.
COPPER CABLE SPLICER II JG4
PHILIPPINE LONG DISTANCE TELEPHONE CO.
MAKATI, MANILA
07/01/1983- 06/16/1996
Work in Primary Copper cable size 1800-900 prs. In Aerial and underground by Splicing & Termination of pair in Primary side of module in Primary assignment in every telecom cabinet.
Work in Secondary copper cable size 400-10prs. In Aerial and Underground by splicing & termination of pair in secondary side in module DP’s assignment’s
Work in Cut-Over Project by X5 and Zero backlog.
Install and Repair Telephone Lines and cables.
Troubleshooting and Repair existing cables and replace if needed.
Work inside the Manhole by jointing and replacing damage cables.
Close and Open cable closure shrinkable and lead sheet.
Work on Aerial cable by localizing Individual cable trouble (ICT).
Laying and Install Copper cable in aerial and underground from C.O to Telephone Cabinet.
Work inside C.O (Central Office) as a Cable Tester.
OTHER RESPONSIBILITIES
1.Responsible of making Rollout Plan (including Resource Plan) according to Project Milestone.
2.Organize all teams to execute the Plan for all Project Awarded in every site.
3.End – to – end Monitoring and Manage the Project Progress to all ensure all targets can be finished on time.
4.Responsible for the All Project Progress, Cost (P.O – B.O.Q – C.O.A – T.A ) Quality Control, Safety Control, Deployment.
5.Coordinate and Solve critical issues from Engineering, outsource, Logistic and Technician Teams.
6.Organize Rollout Teams, Define K.P.I ( Key Performance Indicators ) for all Team staff and evaluate performance and mark a proper Team building.
7.Manage Sub-contractors in all Project site Awarded and organize meetings and conduct Sub-contractor workload confirmation.
8.Manage all Project equipment and Materials Request in all jurisdiction site in proper way at project scope.
9.Responsible for E.H.S ( Environment, Health and Safety ) and P.P.E ( Personal Protective Equipment ) Regulations to be implemented.
10.Daily Monitoring of project Report via email and E.P.M.S system ( Employee Performancde Management System ).
11.Report to Project Team base on P.M.O ( Project Management Office ) regulation.
TRAINING AND CERTIFICATE:
MILCOM AUSTRALIA CERTICATES IN TELECOMMUNICATION III
1.IMPLEMENT AND MONITOR ENVIROMENTALLY SUSTAINABLE
WORK PRACTICES.
2.NBN FIBRE TO PREMISES COURSE.
3.CERTIFICATE III IN TELECOMMUNICATION.
4.PIT AND PIPE COURSE.
5.NBN SAFETY AND AWARENESS COURSE.
PLDT MANAGEMENT TRAINING COURSE
1)TOTAL CUSTOMER SATISFACTION MGT./CIRCLE BASIC
TRAINING.
SAFETY BASIC COURSE
1)HELICOPTER UNDERWATER ESCAPE & SEA SURVIVAL
TRAINING.
2)H2S/BA AWARENESS TRAINING.
3)BOSH – BASIC OCCUPATIONAL SAFETY & HEALTHSO1 SAFETY
TRAINING
EDUCATIONAL ATTAINMENT
SCHOOL COURSE STATUS
-A.Bonifacio Elem. School Grade I – VI Graduate
-A. Bonifacio High School Year - I – IV Graduate
-University of the East B.S.M.E 2ND YEAR
PERSONAL DATA:
●DATE OF BIRTH:Feb. 16, 1962
●CIVIL STATUS: Married
●GENDER:Male
●CITIZENSHIP:Filipino
●RELIGION: B/A Christian
REFERENCE :
Mr. Francis Roel De Dios
Lightsource Group co.
Splicer
Mr. Darwin Alden Belen
PLDT Project Engineer
Mr. Sonny Borja
PLDT Project Engineer FTTBTS
Mr. Michael Advincula
FIBERCOM Area Project Manager