HARIDAS KAIPRATH
CURRICULUM VITAE
PERSONAL DETAILS
Nationality : Indian
Sex : Male
Marital Status : Married.
Date of Birth : 15 - 06 - 1963
Passport No. : Z 3825783 Valid up to 6th March 2027. Permanent Address : “I-201, Lodha Elite,
Lodha Heaven
Nilje Gaon, Dombivili(East)
Maharashtra State, India.
Present contact Tel. : +919*********
Email Address : *********@*****.***
EDUCATION:
B.Tech: in MECHANICAL ENGINEERING in the year 1989 PROFESSIONAL QUALIFICATIONS
ASNT level-II in Radiographic Testing.
ASNT level-II in Ultrasonic Testing.
ASNT level-II in Magnetic Particle Testing.
ASNT level-II in Liquid Penetrant Testing.
ISO 9001:2015 QMS CERTIFIED LEAD AUDITOR & OHS Auditor. IRCA QMS (9001:2015) REGISTERED LEAD AUDITOR & OHS (45001:2018) Auditor
(Certification Number: 1196401)
COMPUTER SKILLS
Knowledge of major MS Office software applications, including Word and Excel. Also very familiar with E-mail communications and Internet connectivity. PROFESSIONAL EXPERIENCE
Overall 28 years working experience in QA & QC department in India and Abroad. HARIDAS KAIPRATH
Page 2 of 6
Experience in review of documents (ITP, Procedures, GA Drawings for pressure vessel, piping, storage tank etc.), Review of Material test certificates, conduct VPIM at vendors location, QMS Audit at project sites & Vendors workshop. Experience in Shutdown works at KNPC shauiba Refinery & Gathering centre’s at Kuwait Oil Company & GPIC (Gulf Petro Chemical Industries) Bahrain. Experience in Plan & conduct QMS Audit at vendors location and project sites, Preparation of project specific Quality Plan & Procedures for various project. Well familiar with International Codes, Standards and specifications like ASME, API, ASTM, TEMA, AWS, ISO etc,
PROFESSIONAL WORK HISTORY
Present Job: Working as freelancer in Mumbai: Inspection, QMS Audit and QMS Implementation.
A- From May 2012 to February 2021.
With Kuwait Oil Company, Kuwait as Inspection Engineer. Major Responsibility: Review of documents (ITP, Procedures, GA Drawings for pressure vessel, piping, storage tank etc.), Review of Material test certificates, conduct VPIM at vendors location, QMS Audit at project sites & Vendors workshop. Arrange inspector at project sites, attend weekly
& monthly progress meeting etc.
Attend annual shutdown works inspection activities at KOC GC’s : -
- (Identify/verify the shutdown tie-in location as per the approved P&ID.
- Witness tie-in joint bevel DP test.
- Witness Tie-in joint location UT scanning and accept the location for cutting for tie- in work.
- Inspect Tie-in joint Fit up, weld visual inspection, RT, Final PT, etc.
- Ensure all piping spools, valves are hydro tested (valve shop ) as per the contract requirement.
- Mechanical walk down (with P&ID, GAD) after completion of shut down activity before proceed for nitrogen purging.
- Nitrogen purging for the concerned system shall be ensured and leak tightness for all flanged joints shall be ensured.
- Witness for minimum thickness measurement for vessel & Storage tanks) B- From February 2011 to November 2012.
With Al-Turki Enterprises, Oman as Snr:QA - Engineer Major Responsibility: Implementation of QMS system at different site location Under Petroleum Development Oman.
HARIDAS KAIPRATH
Page 3 of 6
Attend client weekly meeting, Internal Audit at all sites, taking corrective action & closing of NCR’s &
Preparation of PQP, ITP& Procedures.
C- From May 2010 to Jan2011.
With Bureau Veritas India Pvt Ltd, Mumbai, as Senior Surveyor- Mechanical. Major Responsibility: Third party Inspection (at vendor’s shop Godrej & L&T) as per client requirement & Ensuring the requirement for specified codes, Standards & clients Specification requirements are meet the final product.
D- From February 2007 to April 2010.
With Larsen & Toubro Electromech LLC, Oman as QA – MANAGER. Major Responsibility: Ensuring that the Processes needed for the Quality Management system established, Implemented
& Maintained.
Other Responsibilities:-
- Conduct IQ Audit at project sites.
- Ensuring the awareness of customer requirement throughout the Organization.
- Organizing Management Review Meetings periodically to report on the performance of the Quality Management System, Identifying the area of improvement & implement the suggestions to continually Improve the Quality Management system processes and product.
- Coordinating with the external Auditors during Periodic audit & certification audit.
- Collecting feedback from customer and reporting to the top management on the client identified suggestions for improvement and level of customer satisfaction.
- Conduct QMS induction to all newly joined staff.
- Implementation of QMS system at all Project sites.
- Planning of IQ & Second Party Audit.
- Taking necessary corrective and preventive action.
- Closing of NCR.
- Coordination with client & Third party inspection agencies.
- Preparation & Approval of Project specific Quality control plan. HARIDAS KAIPRATH
Page 4 of 6
- Provide training of QA/QC personnel for meeting the competence level.
E- From August 2005 to November2006.
With KHARAFI NATIONAL, Kuwait as Q.C. Inspector
Project Handled : Effluent Water Disposal Project for South West Oil Fields of Kuwait Oil Company.
Duration : August 2005 to October 2006.
Responsibilities:-
- Coordination with PMC (Flour International) for the field inspection activities of Piping and Tanks as per approved ITP.
- Coordinating and witnessing of all NDT activities.
- Walk down Inspection of completed Piping Systems.
- Preparation of Hydro Test Packages.
- Preparation of punch list and witnessing the pressure tests.
- Preparation of Final Dossiers.
F - July 1998 to December 2004
With Kuwait Industrial Refinery Maintenance & Engg. Co.,S.A.K (Kremenco), Kuwait as Manager ( QA/QC ).
Responsibilities:-
- Preparation of Quality Plan and procedures specific to the projects as per contract requirements for client’s approval.
- Coordination with all QA/QC Personnel and planning of inspection activities.
- Attend shutdown work inspection at KNPC shauiba Refinery (removal
& installation of damaged heater tubes) Material Inspection, weld visual, NDT witness & review, witness hydrostatic testing etc.
- Coordination with client’s representative and Third Party Inspection agencies.
- Conducting internal quality audits at various project sites.
- Preparation and approval of Welding procedures and welders for various projects.
- Coordination of NDT activities and review/approval of NDT reports.
- Preparation and Approval of Manufacturing Record Books.
- Conduct Internal Audit as per plan.
- Issue & closing of NCR.
Major Projects Handled:-
HARIDAS KAIPRATH
Page 5 of 6
- Fabrication and supply of Pressure Vessels ( ASME U stamped ), Pulsation Bottles and Gas separator for Kuwait Oil Company(GC-25)
- Pontoon Fabrication for Ministry of Defence under TPI.
- Retubing of Fired Heater at KNPC (Shuaiba Refinery )
- Fabrication and Erection of storage Tank as per API-650 for Kuwait Oil Company ( GC-25, North Kuwait )
- Rerouting of 13 Nos critical Piping Systems around damaged area in KNPC ( MAA Refinery, CDU # 3 )
- Prefabrication for provision of New Dual Tanks at GC-3, 6 & 8 of Kuwait Oil Company.
- Pre fabrication & erection of TV Flare system De-bottle necks for Kuwait Oil Company (GC-28)
- Installation of Foam piping & Foam pourers for Tanks in KNPC Shuaiba Refinery.
- Fabrication of new urea solution Tanks for Petroleum Industries Company (PIC), Shuaiba.
G - October 1997 to June 1998
With Sharptech Consultants Pvt. Ltd., Mumbai, India as Inspection Engineer. Responsibilities:-
- Stage wise Inspection of process Equipments like Reactors, Pressure Vessels, Heat Exchangers, Columns etc., from Material identification to final testing and dispatch.
- Approval of Welding procedures and Qualification of Welders.
- Review of NDT Procedures and witnessing the tests.
- Preparation of Final Documents.
H - March 1996 to October 1997
With Ahmed Mansoor Al-A, Ali., Bahrain as Q.C.Inspector Responsibilities :-
- Approval of Welding procedures and Qualification of Welders.
- Final Inspection of Fabricated Structural.
- Shutdown inspection activities at GPIC Bahrain.
- Witnessing all NDT tests as per approved Inspection and Test Plan.
- Preparation of Final Documents.
Major Projects Handled :-
- Structural Steel Fabrication for 400 Mtrs Building extension of Aluminium Bahrain ( ALBA) 3-76 cell expansion project.
- Fabrication of 1700 Ton Structural steel and Stainless steel Tanks for Gulf Petrochemical Industries Co.(GPIC) Urea Project.
- Fabrication of Carbon steel ducting and chimneys for Air purification plant of ALBA.
HARIDAS KAIPRATH
Page 6 of 6
I - March 1995 to February 1996
With Sharptech Consultants Pvt. Ltd., Mumbai, India as Inspection Engineer. Responsibilities:-
- Stage wise Inspection of process Equipments like Reactors, Pressure Vessels, Heat Exchangers, Columns etc., from Material identification to final testing and dispatch.
- Approval of Welding procedures and Qualification of Welders.
- Review of NDT Procedures and witnessing the tests.
- Preparation of Final Documents.
J - May 1993 to February 1995
With Process & Project Equipment Company.,Mumbai, India as Inspection Engineer. Responsibilities:-
- Stage wise Inspection during fabrication of various process equipments like Reactors, pressure Vessels, Heat Exchangers etc,.
- Checking of Fabrication drawings and Material take off.
- Coordination with Third party Inspection agencies for Inspection and certification of Equipments.
- Coordination of NDT activities and review of NDT results.
- Preparation of Final Documents.
K - February 1990 to March 1993
With Techno India., Mumbai, India as Inspection Engineer. Responsibilities:-
- Stage wise Inspection during fabrication of various process equipments like Reactors, pressure Vessels, Heat Exchangers, Tanks etc For BPCL, Standard Alkali, NOCIL, Deepak Fertilisers etc.)
- Checking of Fabrication drawings and Material take off.
- Coordination with Third party Inspection agencies for Inspection and certification of Equipments.
- Coordination of NDT activities and review of NDT results.
- Preparation of Final Documents