Muhammad Ikraam
Chack #***EB PO Box ***EB tehsil Borewala
District Vehari
Residential No: 032********
E-mail Address: ikraam221gmail.com
CNIC: 36601-9586679-5
Experience
Working In KSS (pvt )Ltd as Senior Technician
Since January 2008 to 2021
Installation trouble shooting and optimization of transmission equipment RTN 600 series of Huawei technologies. RTN 605,610,620 PDH, SDH for space diversity, stm1, and Xpic links in (1+0), (1+1) configuration.
Hardware up gradation of links of RTN 620, RTN 950, OSN 1500 on live network..
Supervising the power swap of rectifiers powering the live network.
Rectifying the alarms of live network NEC, RTN 620, RTN 950.
Media patching for cut over of sites on live network. Working on Ufone Project
Installation troubleshooting and optimization of NEC PDH, SDH equepment.NEC pasolink v3, v4, NEC paso NEO, STM1,Xpic links and space diversity links in (1+0)and (1+1) configuration.
Micro wave installation of the RTN for the PDH & SDH links.
Troubleshooting of the Alarms and media issues.
Worked For Ufone PTML Transmission And BSS Projects
.
Hardware installation, Site testing and commissioning of Huawei BTS 3012, 3012 AE.
Supervision of installation of PDH & SDH microwave equipment RTN 600 series of Huawei at sites..
Installation and trouble shooting of the NEC PDH SDH Equipment.
Configuration of the Boolean Alarms.
Well experienced on Acceptance Transfer Procedure.
Responsible for corrective maintenance and any alarm or fault occur in BTS cabinet CM Pak Roll out Project
Conducting LOS survey for new site. Also proposing the height and location of tower.
Installation of the SDR cabinet of ZTE.
Installation of microwave link of different capacity.
Clear the media for roll out side.
World Call Expansion Project
Installation of new sites.
Installation of BTS 3605 CDMA.
Commissioning of new site
Internal and external alarm patching.
Clearing the media
Establish the services of Evdo and 1X.
Warid Roll out Project
Installation of new sites
Clearing the media
Installation of HUAWEI BTS 3012 AE
Internal and external alarm patching
Testing the alarms. Testing the site
Clear the VSWR for 900 and 1800MHz frequencies
Conducting the PAT for new site
Ufone PTML Roll Out Project Phase 10
Clearing the media for new sites
Installation of new site sharing and stand alone
Installation of HUAWEI BTS 3900
Installation of new Rectifier system configure the PMU
Internal and external alarm patching
Quality check as per requirement
Installation of new microwave link.
Commissioning of RTN 910,950
Conducting the PAT
Tasks completed in Mobilink Project (Ericsson)
Performed the M.W. Swap of Alcatel equipment with Ericsson & Alcatel BTS Swap with Ericsson RBS 6101,6301.
Working on PTCL Project
Installation and commissioning of complete site of BTS 3900 of WLL CDMA
Making the fiber optic connections for the BBU and the RRU
E1 to FE traffic shifting sites
Commissioning RTN 605,610 and 620 both for E1 and FE ports
Responsible for alarm clearance and trouble shooting