Post Job Free

Resume

Sign in

Trouble Shooting Fiber Optic

Location:
Punjab, Pakistan
Posted:
August 24, 2023

Contact this candidate

Resume:

Muhammad Ikraam

Chack #***EB PO Box ***EB tehsil Borewala

District Vehari

Residential No: 032********

E-mail Address: ikraam221gmail.com

CNIC: 36601-9586679-5

Experience

Working In KSS (pvt )Ltd as Senior Technician

Since January 2008 to 2021

Installation trouble shooting and optimization of transmission equipment RTN 600 series of Huawei technologies. RTN 605,610,620 PDH, SDH for space diversity, stm1, and Xpic links in (1+0), (1+1) configuration.

Hardware up gradation of links of RTN 620, RTN 950, OSN 1500 on live network..

Supervising the power swap of rectifiers powering the live network.

Rectifying the alarms of live network NEC, RTN 620, RTN 950.

Media patching for cut over of sites on live network. Working on Ufone Project

Installation troubleshooting and optimization of NEC PDH, SDH equepment.NEC pasolink v3, v4, NEC paso NEO, STM1,Xpic links and space diversity links in (1+0)and (1+1) configuration.

Micro wave installation of the RTN for the PDH & SDH links.

Troubleshooting of the Alarms and media issues.

Worked For Ufone PTML Transmission And BSS Projects

.

Hardware installation, Site testing and commissioning of Huawei BTS 3012, 3012 AE.

Supervision of installation of PDH & SDH microwave equipment RTN 600 series of Huawei at sites..

Installation and trouble shooting of the NEC PDH SDH Equipment.

Configuration of the Boolean Alarms.

Well experienced on Acceptance Transfer Procedure.

Responsible for corrective maintenance and any alarm or fault occur in BTS cabinet CM Pak Roll out Project

Conducting LOS survey for new site. Also proposing the height and location of tower.

Installation of the SDR cabinet of ZTE.

Installation of microwave link of different capacity.

Clear the media for roll out side.

World Call Expansion Project

Installation of new sites.

Installation of BTS 3605 CDMA.

Commissioning of new site

Internal and external alarm patching.

Clearing the media

Establish the services of Evdo and 1X.

Warid Roll out Project

Installation of new sites

Clearing the media

Installation of HUAWEI BTS 3012 AE

Internal and external alarm patching

Testing the alarms. Testing the site

Clear the VSWR for 900 and 1800MHz frequencies

Conducting the PAT for new site

Ufone PTML Roll Out Project Phase 10

Clearing the media for new sites

Installation of new site sharing and stand alone

Installation of HUAWEI BTS 3900

Installation of new Rectifier system configure the PMU

Internal and external alarm patching

Quality check as per requirement

Installation of new microwave link.

Commissioning of RTN 910,950

Conducting the PAT

Tasks completed in Mobilink Project (Ericsson)

Performed the M.W. Swap of Alcatel equipment with Ericsson & Alcatel BTS Swap with Ericsson RBS 6101,6301.

Working on PTCL Project

Installation and commissioning of complete site of BTS 3900 of WLL CDMA

Making the fiber optic connections for the BBU and the RRU

E1 to FE traffic shifting sites

Commissioning RTN 605,610 and 620 both for E1 and FE ports

Responsible for alarm clearance and trouble shooting



Contact this candidate