REYNAN ORBETA
San Joaquin Santo Tomas Batangas
Email Address: ady5k5@r.postjobfree.com
Applying for: Driver
Mobile No. 096********
Career Objectives:
Seeking a job as a millwright/mechanical technician where I can use my experience to help your organization achieve its goal of excellent in mechanical industry
Qualifications:
Knowledge of safety precautions and fire prevention as well
Work as a Permit Receiver responsible to ensure that the work area is put in a safe and tidy state whenever they or their team leave the work area. When the work is complete the permit receiver should review the work with the permit issuer as part of the work permit closure
Skilled at performing maintenance functions and modification tasks
Knowledge of mechanical equipment procedures and inspections as well as mechanical technician
Capable to handle piping works like repairing all leaks from the water pipeline, modifying the pipeline, and installing a new pipeline for the equipment such as heat exchanger, and water heater tank.portable chlorine use for swimming pool,pipeline supply on a fountain
Install and repair and replace a variety of subassemblies on varied equipment
Knowledge of all tools and precisions tools for performing daily tasks
Operate hand and power equipment
Work as a Driver/Technician for all scope route of Aramco Facility
Work Experience:
Arabian Fal Company
Project: Saudi Aramco Community
Location: Abqaiq Eastern Province Saudi Arabia
Position: Mechanical Technician/Permit Receiver/Driver Technician
Year of Employment: March 30,2015-May 31,2020
Duties and Responsibilities:
Work as a Permit Receiver responsible to ensure that the work area is put in a safe and tidy state whenever they or their team leave the work area. When the work is complete the permit receiver should review the work with the permit issuer as part of the work permit closure
Carry out the dis-assembly and assembly of mechanical equipment such as pumps and motors,(AHU) Air Handling Unit,Cooling Towers,19XR Chiller
Carry out Overhauling of 19XR Chiller dis-assembly and assembly of equipment replace all the requirement parts such as high-speed shaft,replace the required sim and check the required eye or tip clearance, and replace all the necessary O-ring
Working with different types of piping.Installing fire sprinkler pipe works and sprinkler heads.Installation of hot and cold water piping in buildings such as water heaters. Modified repair and replacement fittings for all leaks in the water pipeline.Install new pipeline supply
Carry out to replace of all types of bearings and mechanical seals of pumps and motors and pillow block bearings of (AHU) Air Handling Unit
Carry out modification of the water pipeline, and replace all the damaged fittings and valves
Carry out a check and repair of all types of gate valves and check valves
Perform sheet metal works,such as riveting and drilling,
Knowledge to use hand tools such as pliers, screwdrivers,all types of wrenches, and socket wrench
Knowledge of using power tools such as grinder,drill machine,hydraulic machine
Alignment of pumps and motor
Samsung Engineering Company LTD
Project: UGCC GSP & Polymer Project
Location: Akchalak Kungrad,Uzbekistan
Position: Millwright
Year of Employment: April 28,2014 -Dec 09,2014
Duties and Responsibilities:
Capable to handle all mechanical works like ROTATING such as pumps and motor alignment,compressors,gas turbine
Capable to handle STATIC preparation of foundation for installation of equipment such as pumps and motors,Vessels horizontal and vertical.Check the require elevation of the equipment
Knowledge to use Surveying Auto Level and Theodolite
Capable to handle alignment from preliminary to final alignments of pumps and motor
Knowledge to check the alignment vertical and horizontal Vessels using of Theodolite
Doosan Heavy Industries LTD
Project: Al Khalid 4x350MW Power Plant Project
Location: Sirte,Libya,Africa
Position: Millwright
Year of Employment: Feb 04,2013 -Feb 04 2014
Duties and Responsibilities:
Carry out of assembly of boiler ducting
Knowledge to read mechanical diagram
Capable to read blueprint
Carry out for assist erection of ducting to install at boiler at working site
Carry out to install all bracing support of ducting,assist welder for installation of remaining support
Carry out of connection of ducting with bolts and nuts
Hyundai Engineering Company Under Chun-jo Company Subcontractor
Project: Turmenistan Desulfurization Plant Project
Location: Yoloten.Turmenistan
Position: Millwright
Year of Employment: Oct 17,2011-Oct 17.2012
Duties and Responsibilities:
Capable to handle all mechanical works like ROTATING such as pumps and motor alignment compressor,gas turbine
Capable to handle STATIC preparation of foundation for installation of equipment such as pumps and motors,Vessels horizontal and vertical.Check the required elevation of the equipment
Capable to read blueprint
Knowledge using Surveying Auto Level and Theodolite
Capable to handle alignment from preliminary to final alignments of pumps and motor
Knowledge to check the alignment of vertical and horizontal Vessels using Theodolite
Capable to handle AIR FIN COOLER alignment
Consolidated Contractors International Company -JGC-KBR
Project: Qatar Shell Pearl GTL Project
Location: Raslafan Industrial City Qatar
Position: Charge Hand Millwright
Year of Employment: Jan 12,2009- Jul 17,2011
Duties and Responsibilities:
Capable to handle all mechanical works like ROTATING such as pumps and motor alignment compressor,gas turbine
Capable to handle STATIC preparation of foundation for installation of equipment such as pumps and motors,Vessels horizontal and vertical.Check the required elevation of the equipment
Capable to read blueprint
Knowledge using Surveying Auto Level and Theodolite
Capable to handle alignment from preliminary to final alignments of pumps and motor
Knowledge to check the alignment of vertical and horizontal Vessels using Theodolite
Capable to handle AIR FIN COOLER alignment
Consolidated Contractors International Company-Teyseer Contracting Company (TCCJV)
Project: Qatar Shell Pearl GTL Project
Location: QatarGas Expansion Train 4 -5
Position: Millwright
Year of Employment: Aug 09,2007-Jan 10,2009
Duties and Responsibilities:
Capable to handle all mechanical works like ROTATING such as pumps and motor alignment compressor,gas turbine
Capable to handle STATIC preparation of foundation for installation of equipment such as pumps and motors,Vessels horizontal and vertical.Check the required elevation of the equipment
Capable to read blueprint
Knowledge using Surveying Auto Level and Theodolite
Capable to handle alignment from preliminary to final alignments of pumps and motor
Knowledge to check the alignment of vertical and horizontal Vessels using Theodolite
Capable to handle AIR FIN COOLER alignment
Skills: Driving 4 wheels Vehicle, Computer Literate, knowledge on electrical wiring, repair all kinds of power tools and appliances
Educational:
High School: Graduate
School Name: Marcelino Fule Memorial College
School Year: 2000-2002
Vocational: Under-graduate of Electromechanics Technology
School Name: Dual Tech Centre at Canlubang Calamba Laguna
School Year: 2000-2002
Personal Information:
Date of Birth: July 09,1979
Age: 44
Religion: Catholic
Nationality: Filipino