Post Job Free

Resume

Sign in

Quality Control Construction Manager

Location:
Abu Dhabi, United Arab Emirates
Salary:
1.0
Posted:
August 22, 2023

Contact this candidate

Resume:

Construction and Supervision professional in infrastructure, civil industrial and commercial projects, civil works of power plants and substation up to 400 Kv construction projects in Energy and oil &gas sector, Experienced in offshore/on shore piling works, installation of GRE pipelines

Experienced construction manager in infrastructure projects

Educational Qualification

B.E (CIVIL ENGINEERING) From Rajasthan University – Malviya Regional Engineering College Jaipur (Now MNIT Malviya national institute of technology Jaipur)

Core Competency

Management of inspection,Construction &Supervision of Infrastructure projects of Power substations/Industrial buildings/Fire system and Road works in Oil & Gas sector (ADNOC on shore project in Jabel Dannah & ADNOC Gas industries at Takreer refinery Ruwais, Buhasa, Bab habshan and Asab) including coordination with (MEP) electrical /mechanical & Civil works required to complete and handover the construction activity of The Projects and + 30 years of vast experience in the field of industrial heavy civil construction projects in middle east and Gulf area, including 132/220 kv cable laying works Monitor all civil works associated with construction of the "PGUR project" is being completed in compliance with Drawings and Specifications. Ensure all Quality Control activities and HSE related to the civil works are executed and documented in accordance with the applicable Client Specifications, Inspection and Test plans and Quality Procedures.

weekly/Monthly Progress, quality and HSE meetings with Client and follow up the actions of MOM to be closed out.

In conjunction with QA/QC Manager and QC Coordinator; participate in Client and internal audits. Recommend as appropriate Corrective actions to non-Conformities and deviations to the Quality Management system and procedures

Inspection and Construction of Deep pile foundations, concreting of substructure raft and walls, specialized water proofing system, secant piles system, concreting of superstructures components and finishing works, industrial and commercial flooring, external finishing of buildings, Roads, surface drainage, Sewerage and plumbing works, Geotechnical investigation, Dewatering works

Construction and management of Infrastructure in agricultural industries in UAE Green house, pivot installation, Irrigation system and steel tanks and associate works including pump house, workers accommodation and development of Farmhouses regarding to agricultural industries in UAE

A seasoned professional with three decades of rich experience in inspection and supervision of activities in Multiple projects of infrastructure of power, road, sewerage and town ship projects including Construction, Project Management GIS and AIS substations including fire water tanks, machine foundations, cable laying and installation of Inergent, Vesda piping and installation of cable trays and equipment’s

Expertise in swiftly ramping up projects with competent cross-functional skills and on time execution.

Proficient with present civil construction methodologies, systems in compliance with quality and HSE standards.

Exemplary relationship management with excellent communication skills.

Ability to network with project members, consultants, contractors, and statutory agencies with consummate ease.

Project Construction,inspection and Supervision Management

Preparing project schedules / plans and engineering layouts / drawings for executing projects in the pre-designated time and cost parameters.

Monitoring projects with respect to Cost, Resource Deployment, Quality Compliance, and Productivity including Improvement & Manpower planning to ensure timely execution of projects.

Evolving metrics to monitor and control project implementation and maintain the deviation as per scope of projects pertaining time and cost.

Evaluation of project present cost / benefit analysis at project decision points

Effective and optimum use of available resources.

Involvement in construction methodology method statements, project quality plan, and project safety plan, schedules, and compliance with project objectives

Identify critical activities of Projects and develop alternate vendor source for achieving cost effective execution & timely delivery of entire project work to minimize project cost.

Ensure that construction materials received are in accordance with the quantity & quality and as per approval and scope of work for all discipline (electrical. mechanical, instrumentation and civil)

Support the client Inspection/Integrity Engineers in delivery of Asset Integrity teamwork scope as defined in the contract with the client. Maintain close liaison with site personnel to ensure activities such as equipment scheduling, planning, availability etc. are implemented.

Assist in all strategy reviews and in the development of inspection programs. Where necessary input to detailed plans, programs, work scopes and carry out pre-surveys of equipment.

Undertake all agreed inspections within the limitations of the issued Letter of Authority (Loa), ensuring they are implemented and completed as per scheduled.

Supervise contractor personnel and ensure the contractor understands the work scope, associated risks and the work is completed and reported as specified in the work scope. Carry out briefings/Toolbox Talks to all Inspection/ NDT Personnel.

Provide remedial recommendations as required and inspect the subsequent repair work for acceptance.

Attend meetings and reviews as appropriate e.g., Shutdown, planning, safety and hazard risk assessment etc.

Maintain assigned Logs or Registers up-to-date and in accordance with client procedures and issue status reports as required e.g., daily/ weekly/ handover, etc.

Provide support as required to audits e.g., verification, client, internal. Establish and maintain specific project procedures for design/construction supervision management

Involvement in construction methodology method statements, project quality plan, and project safety plan, schedules, and compliance with project objectives

ROLES AND RESPONSIBILITIES

oProvides guidance to contractors regarding schedule, procedures, scope of work and other information requirements.

oPlans and organizes monitoring of contractor's civil work activities.

oReviews activities of subordinates to ensure field operations are adequately monitored and all necessary tests and inspections are conducted.

oAssists in preparing manpower forecasts to ensure adequate staffing for monitoring activities

oDevelops a close working relationship with contractor.

oProvides technical guidance in interpretation of specifications for civil work. Reviews job plans, methods, equipment, staffing, and productivity and detects potential problems in conforming with established schedules and specifications.

oReviews problems with contractor to determine whether actions proposed are adequate for mitigation

oReviews shop and as-built drawings submitted by contractor, and coordinates approval of same.

oIdentifies and reports on discrepancies in original design or in contract documents which necessitate contract modifications.

oReviews submitted construction, quality assurance and other procedures, and obtains approvals

oCoordinates with other departments to obtain required support.

oCoordinates interfaces between contractors and project management staff when project impacts on other projects. And activities

oResolves conflicts in schedules and coordinates tie-ins of facilities where applicable.

oRecommends approval of schedule changes in sequence of construction activities.

oCompiles technical data to prepare weekly and monthly reports on project progress, cost, quality control. Conducts or directs facts finding investigations and advises SPM on problems in meeting schedule or specifications.

oAssists SPM in administration functions and initiates correspondence to contractors and other departments. Assume day-to-day responsibilities of SPM in his absence.

oReviews and verifies that items submitted for billing on Work Estimates.

oDetermines percentage of work completed and recommends payment of Work Estimates appropriate.

oAssists in coordinating the compilation of relevant documentation and the determination of

oactual events and situations causing contract delays and/or claims, and in evaluating validity of claims.

KEY PROJECTS AND TIMELINE

POSITION

PROJECTS /COMPANY

PERIOD

Senior Construction Engineer

1 Replacement of fire water pumps at Jabaal Dannah ADNOC on shore project with ADYARD contracting Abu Dhabi

2 Pipeline surveillance system & upgradation of telecom network(SDH) and F&G system ADNOC Gas processing project with ADYARD contracting Abu Dhabi

June2020- to continue

Construction Manager Projects

EAG Projects -EAG LLC Abu Dhabi

Oct 2018-FEB 2020

Construction Manager

ETA PPD- Electro Mech Technical associate Dubai/Abu Dhabi

1 PGUR- Projects Package-5283 (Sub- Stations). BU-HASA, HABSHAN, BAB & ASAB. GASCO- ABU DHABI

2 construction of various 132/220/400 kv substation with Transco /Dewa and Fewa

Jan 2000- Sep 2018

Sr, Engineer

Hyundai Engineering and construction Ltd. Sharjah

July1996-Nov1999

Quality Inspection Engineer

AAG LLC Yanbu Refinery Saudi Arabia

Jan1994-feb 1996

Field Engineer

Intercontinental Consultants and Technocrats New Delhi India

Mar1988- Nov1993

Construction Engineer-Civil

J k synthetics LTD TYRE CORD Kota Rajasthan India

July1985-feb1988

Training, Affiliations & others

• Underwent training course on Basic First Aid & Firefighting course in Technical Inspection Bureau, Abu Dhabi.

•PMP certification -Cambridge institute UAE

•Internal auditor training course from Dubai management institute

•Knowledge in Power Substation construction and MEP, fire detection and deluge system coordination works in Adnoc Gas industries

•Planning & Execution of project activities at Site without LTI and with quality

•Approved as HSE Competent Person for ADDC/TRASCO

•Certificate course in loss prevention Yanbu Refinery (Saudi Aramco -Saudi Arabia)

•Construction Training During College Practical Training program – Thermal coal fired power plant 2 years Kota Rajasthan India

Professional Experience

1 Senior construction engineer

Adyard Projects -October 2020 to continue

Client- ADNOC on shore project (replacement of fire water pumps)

As Sr construction Engineer and construction focal point of the projects Responsible for implementation of the quality control and HSE procedure, working as team leader to motivate the team for completion of the projects in terms of quality and agreed schedule .Guiding the construction team of the project division& sub-contractor to resolve the day to day issues in construction of new pump house shelter, trenching and laying of GRE pipe line, NDRC works, offshore piling works, marine works for sea bed preparation and installation of sea water intake tanks including related civil works, structure identification and erection works

Coordination with client for ensuring the brown field permits for the day-to-day activities and ensuring all method statements, inspection and test plan have been approved and progressing as planned. Including all site field tests mentioned in the specification. And all quality control records are kept up to date and filed.

Responsible for supervision, inspection and implementation of approved quality standards and procedure during construction on all phases of civil and structural works.

Ensure quality control and HSE procedures are being followed and implemented properly.

Responsible for non-conformities of work and proposed corrective actions ensuring that is being done properly and correctly during re-construction. Including Witness field sampling and testing activities

2 Construction Manager projects

EAG Projects -October 2018 to Feb 2020

Client- EO/CPC

As construction manager projects Responsible for implementation of the quality control and HSE procedure, working as team leader to motivate the team for completion of the projects in terms of quality and agreed schedule .Guiding the construction team of the project division to resolve the day to day issues in construction of green house and pivot for irrigation /agriculture projects and development of farmhouses including pump houses, HDPE water line, electrical works, LV substation and cables up to 11 kv and 33 kv and construction supervision of pump rooms, workers accommodation and owner villa

As Construction manager to ensure all method statements, inspection and test plan have been approved and progressing as planned. Including all site field tests mentioned in the specification. And all quality control records are kept up to date and filed.

Responsible for supervision, inspection and implementation of approved quality standards and procedure during construction on all phases of civil and structural works.

Ensure quality control and HSE procedures are being followed and implemented properly.

Responsible for non-conformities of work and proposed corrective actions ensuring that is being done properly and correctly during re-construction. Including Witness field sampling and testing activities.

.

3.a Construction Manager -Buhasa, Bab, Habshan, Asab, -2014 to September 2018

ETA-PPD (Electro Mech Technical Associate)

Project -Power generation retirement project (PGUR-5283)

Client -ADNOC group of companies (Adnoc Gas Industries GASCO) (Total value 280M USD)

Consultant – Mott MacDonald

As Project Construction manager coordination for various construction activities with projects, GASCO plant operations, subcontractors, and End users in terms of quality, HSE initiatives and verify the resources planning as per construction schedule

Supervision of construction of new cap bank building and associate cable laying (power and control cables) works inside and outside of plant. Supervision of co2 system, fire detection system installation and fully coordination with EU of Gasco plant at Buhasa and Asab

As construction manager responsible for the construction being completed in time, within the established budget and ensuring that all contractual obligations was fulfilled in time up to satisfaction of clients, in coordination with field planning engineer review of construction program and ensure that detailed construction schedules Responsible for material sourcing of earth works, Concrete, Asphalt mix design and all related production facilities. Preparation of technical queries and coordination with engineering departments on technical issues. Inspect and monitor contractor’s activities in accordance with agreed inspection and test plans, approved procedures, specification, and codes/standards. Review and approval of Concrete Mix designs, batching, and placement tests. All construction activities are fully compliance with company HSE policies and practices

Monitor all civil works associated with construction of the "PGUR project" is being completed in compliance with Drawings and Specifications. Ensure all Quality Control activities related to the civil works are executed and documented in accordance with the applicable Client Specifications, Inspection and Test plans and Quality Procedures

As Construction manager responsible for inspecting and monitor contractor’s activities in accordance with agreed inspection and test plans, approved procedures, specification, and codes/standards.

To ensure all method statements, inspection and test plan have been approved and progressing as planned and Manage all site field tests mentioned in the specification.

Ensure all quality control records are kept up to date and filed. And Responsible for supervision, inspection and implementation of approved quality standards and procedure during construction on all phases of civil and structural works.

Ensure quality control procedures are being followed and implemented properly including non-conformities of work and proposed corrective actions ensuring that is being done properly and correctly during re-construction. And Witness field sampling and testing activities

. Well, known about system & sub-System of building & Work sequence and Completion of Mechanical Dossier for all activities.

Well known oil & Gas HSE rules & regulations.

Well, known about PEB-Pre-Engineering Building-steel structural work foundation of steel columns, anchor bolts & Plats, side support bracing, Roof sag Rods (10/12mm) Z types, Torque checking, Slab/Rafter Erections & outer gutter for Rainwater drain as per Erection drawings, ITP, Method Statement and Projects specification. WIR/IR (Work Inspection request) every step.

Responsible to review & approval the submittal of material and ensure the material is comply with project specification and related code of practices.

Report any failing or “borderline “test result immediately to the engineer and Following client policy and procedure directives. Including Maintaining all logs related with construction, IR, MIR, MS, ITP, Check List, Cube Test reports, calibration certificates,

(Red mark-up Drawing) for design Departments & ready for internal or external audits as per project requirements & ISO standard.

3.b Construction Manager Jan 2000 to 2014

ETA-PPD (Electro Mech Technical Associate)

Key Projects Handled

Client- Transco/ADDC/ DEWA/ FEWA

1 Project -Supply and installation of 132/11 kv substation at E25/02 and associate civil works, piling, finishes and cable laying Contract no 7204 lot 1C (Total value of N7204 lot is 550M AED)

2 Project -Construction of underground substation building and associate works /Supply and installation of 132/11 kv s/s at presidential palace(primary) Contract no #7204 lot 1D

3 Project -Supply and installation of 132/11 Kv substation including civil works, MEP, and cable laying primary Contract # N5208 at W41 Abu Dhabi

4 Project -Supply and installation of 220/132 kv substation at shuwaihat and delma island contract no N3273 including construction of civil substation building, NDRC, cable ducts, Road, and associate cable laying works

5 Project - Supply and installation of 132/11 Kv at E14 & W47and associate civil, cable laying works contract no 1999

6 Project -Supply and installation of 132/11kv S/S at E 18/02 Abu Dhabi (Transco project G1125)

7 Project -Upgrade of electrical system in presidential palaces in Abu Dhabi region – contract no R-0043

8 Projects -Supply and installation of 132/11 Kv substation at - W17/3 including construction of building, cable laying and associate works

9 Project -Supply and installation of 132/33 Kv S/S- - East coast interconnection at HAMDA, MUNAI and MUZAIRAH including civil works of substation buildings, gantry, cable ducts and NDRC works

As Construction manager for various construction activities and project coordination with consultant, client and subcontractors specifically first underground 132/11 kv s/s in UAE, in terms of progress, quality and HSE

Deep pile foundations, as first underground substation, raft and wall concreting, secant piles and specialized water proofing system Coordination with project manager and client wherever necessary and provide all information to

project manager to define estimating cost, contract extras and construction delays, Project monitoring, quality and HSE coordination, Method statements and construction procedures, shop drawings approval Responsible for all aspects of Supervision and Inspection of Centralized control building, Substation building, underground services etc. Supervision and inspection of proper practice during site grading, earthwork, plant access roads, RCC foundations and Plant drainage

All construction activities are fully compliance with company HSE policies and practices. Preparation of construction method statements and procedures. Implementing field procedures, construction quality control requirements. Preparation and Control of field design changes and Deviation reports, for various construction activities and project coordination with consultant and client, NDRC /drilling for cable laying works 132/11kv

Inspection and supervision of Execution of structural and finishing works including finishes of 11 kV substation Switchgear building, Generator room, road works,

11kv cable laying, jointing, ducts, road crossing in tune of 150 km lengths including excavation, backfilling, and reinstatement works. Construction supervision of internal asphalt road approx. of 100 km dual carriage way inside the presidential palace

Coordination with government department. Inspection and supervision of construction activities and project coordination with client and consultant as senior engineer, monitor all civil works associated with construction of the is being completed in compliance with Drawings and Specifications. Ensure all Quality Control activities related to the civil works are executed and documented in accordance with the applicable Client Specifications, Inspection and Test plans and Quality Procedures. Activities are fully compliance with company quality policies and practices, Preparation of construction method statements and procedures. Implementing field procedures, construction quality control requirements. Preparation and Control of field design changes and Deviation reports

Monitor all civil works associated with construction of the is being completed in compliance with Drawings and Specifications. Ensure all Quality Control activities related to the civil works are executed and documented in accordance with the applicable Client Specifications, Inspection and Test plans and Quality Procedures. Review client Specifications, Tender Drawings, QC Procedures, Inspection and Test plans. Ensure that construction personnel are using the latest revision of all documents and ensure Monitoring/Surveillance activities are being conducted at site on daily/weekly basis

Co-ordination with client, consultant and site engineer and Monitoring quality of work at site. as per specification

Work according to the ISO9001 certified, Submitting the Transmittals and letters for shop drawings and Materials Approval

Following the all HSE Role and Regulation and instructed to Labor, Responsible for site laboratory works and third-party laboratory works and Issuing the Internal Non-Conformities Repot to Management (NCRS)

Closing of all NCR receiving form Consultant and Closing of all site instruction receiving from consultant.

Managing all documents related with QA/QC Department. And inspecting all precast work. Wall Panels, Hollow Core Slabs, and casting including Documentation of the entire QC activates as per project requirement.

Quality control of concrete from batching plant to pouring point. And Control on storage of material as per required specification, Collect all laboratory data and tests concern with Soil & Concrete.

4.Sr. engineer QAQC& construction

HYUNDAI engineering and construction ltd -1996 to 1999

Client - DEWA (Dubai electricity and water authority)/FEWA

Consultant -Fischner

1 Project -Repowering of jebel Ali power and Desalination station D- PHASE II Dewa station

Construction of 400 Kv substation and associate work

2 Project – construction of 132/33 Kv Substation buildings, MEP, and Interconnection of west coast AT UAQ, DHAID, RAK, NAKHAL AND SALMA with transmission lines

Coordination of project activities with consultant and client in charge engineer, inhouse inspection, quality measures, inspection of materials, checking of concrete, inspection of pile foundations

Execution of Gas turbine foundations and construction of 400 kv substation building in DEWA project Station D Dubai, foundations, and substructure concrete works, finishing works internal and external Works

Inspection, supervision of Execution of construction activities for excavation, backfilling, Foundation, sub structures, super structures and finishes of SUBSTATION buildings of 132 AND 33 KV

Access road of transmission line, foundation, piling of towers Umm al quain to Al Dhahid 132 kv line

internal road works, water supply and drainage work in house and Monitoring of construction progress, Inspection, and weekly/monthly progress meetings, as built drawings, lesson learned

Inspecting the reinforcement and Shuttering for the various stages of R.C.C. work, inspecting all building materials and Submitting with Consultant for approval and inspecting all lay out plan and submitting with Consultant for Approval.

Material inspection at site according to specification and international standard and Co-ordination with client, consultant, and site engineer, inspecting all inspection before consultant and submitting for approval

. Monitoring quality of work at site. as per specification, Preparation the method of statements of various works

Provide trainings to labor according to method of statements and Submitting the Transmittals and letters for shop drawings and Materials Approval, following all HSE Role and Regulation and instructed to Labor.

Responsible for site laboratory works and third-party laboratory works.

Issuing the Internal Non-Conformities Report to Management (NCRS)and Closing of all NCR and site instructions receiving form Consultant., Managing all documents related with QA/QC Department, Inspecting all precast work. Wall Panels, Hollow Core Slabs, and casting and Documentation of the entire QC activates as per project requirement.

Quality control of concrete from batching plant to pouring point, Control on storage of material as per required specification. and collect all laboratory data and tests concern with Soil & Concrete and Inspecting all kerb stone, interlock, paving work before consultant submitting.

5.Quality Inspection Engineer

Client -Saudi Aramco, Saudi Arabia

with YANBU Refinery/AAG EST-1994 to 1996

Inspection dept., upgrade of as built/working drawings of Yanbu refinery as per standard of Saudi Aramco, modification and checking the healthy ness of civil foundations, verification, and Construction of new foundations for vessels and equipment's, Inspection and Quality and HSE Procedures, Strengthen of structures, Paintings and NDT testing

Monitoring all civil work and MEP work and quality of work at site. as per specification, Preparation the method of statements of various works and Issuing NRC and Site Instruction to Contractor for rectify the work at the site.

Monitoring all building materials, checking inspection contractor submitted for approval, collecting all data sheet related civil work and MEP work for records, Monitoring all work as per approved shop drawing.

6. Field Engineer

Intercontinental consultant and Technocrats Pvt Ltd.

Delhi NCR region- Delhi, Delhi -1988 to 1993

New Delhi -India

Inspection of Nizamuddin bridge, NDT testing, survey of national highway no 12, material survey, residential colony

Coordination with contractor and clients, progress reports, certification of invoice and preparation, Supervision of contractor works

7. Civil Engineer

J K synthetics Ltd-1985 to 1988 Kota Rajasthan

Consultant – Kothari associates

Project: construction of plants and installation of J K Tyre cord Factory project Jhalawar, Rajasthan state

As Civil construction Engineer responsible for construction supervision of Acrylic Plant, Utility block cooling

tower, DMT water plant, tower rack, foundation and building finishes, Project planning, Execution, Quality control Measures during the construction phase of synthetic Yarn and tyre cord plant, compilation of daily and weekly progress reports, Design estimation, Preparation of BOQ, construction supervision of high rise and residential complex

and construction of framed structures



Contact this candidate