Post Job Free

Resume

Sign in

Warehouse Associate-Delivry Driver.

Location:
Pong Nam Ron, Chanthaburi, 22140, Thailand
Salary:
25/hr
Posted:
August 21, 2023

Contact this candidate

Resume:

Prasert Pawai

Phone no.+669******** I Email ; ady35p@r.postjobfree.com

** ***.* ******** *******,Amphour Pooknumron,Chanthaburi Province,Thailand 22140

Skill

* .****** ******* *** *** training from the Labor office of Thailand.and Safety training from 2010 medic first aid international inc. by Joseph ted Adshire Registry number 47693 at 100 MW Keranigenj Power plant. Also safety,Health,Environment and Quality SHEQ policy from Eskom.

2.Computer training for special programs for Instance SAP, Microsoft,Microsoft office,Windows and also being able to use another program which is concerning.

3.Forklift,Overhead crane and Rigger which has been trained from Rotek Engineering.

4.Surveyor,able to make center line for steel structure, check elevation of bay and read.

5.Alignment coupling for motor and blue check for valve, coupling etc.

6.Measurement instrument for instance inside or outside micrometer, venires calipers, slid gauge, depth micrometer,stud micrometer, high torque,slip gauge, cock gauge, telescopic gauges, feeler gauges etc

7. Overhead crane training from Eskom safety department.

Experience

1 (2014-Present ) Chanthaburi province Thailand

Private Durian plantation at Chanthaburi province of Thailand

- Management Durain plantation

- Organization product Durain according to target.

- Supervise all subordination who was worker

-Prepare necessary equipment used for plantation.

-Skill in disease of Durain due to easy to be epidemic

-Must know operate equipment which often used in Plantation

2.( 2006 and 2014 ) Rotek Engineering Member of Eskom group at Power station in South Africa.

- Finally work at Matimba power station deputy as night shift superintendent.

- Inspection and Lapping control valve for turbine no.4

- Responding to all fitter who was working the night shift.

- performed scope of work daily.

- Safety talk before starting work and problem solving.

- Running number for Bolt of control valve during pre-fabrication

- Meeting with all fitter and assistance for distributing scope of each term work .

- Inspection special tool.

- Management time sheet and log book.

- Make a risk assessment daily.

- Before finish work Inspection housekeeping and take meeting with tech. and plant

-Manager for Material planning, scope of work, problem solving during work daily.

3.(2010-2011) Italian – Thai Power,100 mw PowerPac-Mutiara Keranigenj power plant At Bangladesh

-Commission all power plants according to the final drawing.

-Inspection heavy oil that is loaded from ship to oil tank.

-Inspection cooling system for cat engine which rolls the generator.

-Reporting to manager according to missing or mistake of position in drawing.

-Desires correction regarding missing in drawing.

4. (2008-2009) Group Five International co., Ltd. in Nigeria Project name ABA Power project (Gas turbine installation.) Final position QA/QC and Inspect

- Control and update the drawing which was revised from the project. Department.

-Response inspection incoming finishing of work..

- Inspection perform finally drawing,

- management drawing according to running number,

- controlling and updating drawings which came from the project.

- Recheck all construction sizing which relates to drawing .

- welding inspection for demin water tank and water tank.

- Inspection and alignment rotor for gas turbine. Before issuing a document.

- Supervise cleaning filter house in good condition.

- Inspection construction shop according to drawing.

5) (2005-2008) Daewoo E&C Engineering and Construction Sakalin Russia Project name. Sakalin LNG project at Sakhalin island Russia, CTSD main contractor. Final position. Administer and camp boss.

- Organization camp and update new coming workers from Thailand.

- Monthly issue consumption for new workers from Thailand .

- Control timesheet and Overtime for a Thai worker who was working at site.

- Translator to a new worker from Thailand who had to have a safety induction.

- Problem solve with all Thais worker who had problem with work

- Manage cash advance for Thai workers who are required.

- Assisted help by a Thai worker who wanted to see a doctor.

- Due to the summer season coordinating with camp maintenance to clean up snow on the road.

6) (2004-2005) Maccanel Dowell at Veera-buri province at Rep. of Laos Project name. Gold and copper mine plant construction Sriporn project at Loas.Final position. Co-coordinator, administrator and Camp boss.

- Manage incoming and outgoing pipe fitter and welder,

- Problem solved for all workers about camp, consumable and canteen.

- Cash advance organizes salary for all workers at site.

- Coordinator with the main contractor for camp room service.

- Response patients who may be injured and sent to Thailand for treat.

7.( 2003-2004) Hyundai Engineering and Construction at Al-saluyeh, Busher Rep. of Iran Project name. South pars Field Development Phase 4&5 Busher, Al-saluyeh .Final position. Administer and Camp boss

- Supervisor and organize all 1500 Thaïs workers.

- manage camp maintenance and cleaning snow during summer.

- Organized cash advance for all 1500 Thais workers who have been requested.

- Responsible for all camp consumption.

- Problem solved about electric pumping.

- Supervisor canteen and cook perform according to schedule menu daily.

-Take care of all new incoming workers from overseas and outgoing workers from airport to camp.

8)(1998-2003 )Tuntex PetroChemical(Thailand)Ltd.Maptaput industry park Rayork Thailand .Kind of the company. PTA Producer factory.Final position. Central spare part Warehouse Manager.

-Management and supervise in the Central spare part Warehouse.

- Set up and identify Most of the spare parts concerning the PTA plant.

- Organization and improve the place which was concerned with keeping the stock in the proper location.

- Set up safety stock due to special spare parts used for the PTA plant.

- Set up safety stock by Max and Minimum stock.

- Coordinate activity with the purchase department for safety stock.

- Coordinate activity with the maintenance department for consumption spare part .

- Unless not enough used due to some spare parts might be ordered from overseas which might be in time for use.

- Secure spare parts in a safe location .Radiator must be kept in a special location.

-Organized special pipe used for PTA plant. by color related size of pipe and kind of pipe with concern material

9) (1996-1998) Rehau Limited .Latkrabang Industrial Estate III Thailand.Kind of the company. PVC, used for Refrigerator and accessory for furniture profile producer.Final position. Dispatch Manager.

- Supervisor in the Dispatch department .

- Set up scheduled products and delivery to customers.

- Manage vehicles under control for maintenance and inspection.

- In emergency cases, response delivery to customers for instance PVC, used for refrigerators and accessories for furniture profile producers.

10)(1994-1996). Wiik & Hoeglund Co.,ltd. Phayathai Rd. Bangkok, Thailand .Kind of company.HDPE Pipe and PVC Pipe producer. Final position. Warehouse Supervisor

- Stock control by Max and Min.

- Organized, order, purchase for HDPE fitting that was an accessory .

- Receive Raw material which is used for production.

- Receive Pipe which is produced from production and put in location by customer request.

- Order. Keeping stock running daily.

- Delivery Pipe and Fitting to location's customer.

-Control raw material which was used for production.

11)(1992-1994) Hana Micro Semiconductor Ltd.Lak-see. Vipavadee Rd. BKK Thailand. Kind of company.IC Semiconductor producer .Final position. Inventory Supervisor

- Prepare materials and raw materials which are used before start up production.

- Organize raw material which was ordered from local and overseas.

- Supervise subordinate issue worksheets to the production department.

- Control every step of production according to the worksheet from beginning until finish production.

- Always Keeping an aware stock that must always have enough material in stock .

12) (1989-1991) Wiik & Hoeglund Co., Ltd. Phayathai Rd.BKK Thailand. Kind of company.HDPE Pipe and PVC Pipe producer .Final position. Warehouse Supervisor

- Stock control by Max and Min .

- Organized, order, purchase for HDPE fitting that was an accessory.

- Receive Raw material which is used for production.

- Receive Pipe which is produced from production and put in location by customer request.

- Order. Keeping stock running daily.

- Delivery Pipe and Fitting to the location's customer .

-Control raw material which was used for production.

13.(1988-1989 ) Saudi Arabian Saipem Ltd. At Saudi Arabia

Project name. Crude oil pipeline trance Saudi Arabia construction .Final position. Material Man.

- Control and special in material project for crude oil pipe line material,

- Inspection of new coming project material.

- Loading project material to the site as a mention station.

- Special every station had fixed material in hand.

- Responsible project material from North of Iraq, in pipe line

- Response loading and unloading fix material by location .Skill in material that is used for crude oil material, For instant Pipe, Flange, Bolt and Nut, Valve, Gasket, etc.

14 (1987-1988 )Saipem SPA Ltd.at Mosul Province Rep.of Iraq.

Project name. Crude oil pipeline trance Saudi Arabia construction .Final position. Material Man.

- Control and special in material project for crude oil pipe line material,

- Inspection of new coming project material.

- Loading project material to the site as a mention station.

- Special every station had fixed material in hand.

- Responsible project material from the North of Iraq, in pipeline.

- Response loading and unloading fix material by location. Skill in material that is used for crude oil material, For instant Pipe, Flange, Bolt and Nut, Valve, Gasket, etc.

15 (1985-1987) KHD-Engineering Ltd. Samawah province Rep. of Iraq. Kind of company. Cement Factory. Final position. Spare part Warehouse Supervisor

- Set up a kind of spare part and consumption material in the EDP system.

- Set up spare parts by the kind of section which starts up from the quarry to the packing section. and spare parts which were used for cement.

- Set up safety stock by max,min on stock and management in EDP.

- Set up safety stock for consumption which was necessary for material control in the warehouse.

- Not only cement plant spare parts but also spare parts for heavy tack which was used in the quarry must be controlled as well.

- Must be prepared for the lead time for spare parts by EDP which most of the order had to order from overseas.

- Reorganize and Renew brick stores according to the number of locations. Which was used for pre- heater. .

16 (1983-1985) Joannou and Paraskevaides ( O) ltd. In Saudi Arabia. Project name. Housing Construction Company at Riyadh Saudi Arabia. Final position. Store Keeper.

- Up to date for incoming and outgoing material.

- Keep safety stock in order to max and mini stock which was mentioned in the stock card.

- Control stock by stock card.

- Issue material and construction material.

- Storage construction material and consumption in the proper location.

- Daily stock taking. - Inspection incoming and outgoing material

17 (1980-1982 ).Better Food ltd.,Omnoi,Samudsakhon,Thailand.Kind of Company .Fresh chicken for export to Japan Final position. Assistance Production.

-Supervisor at Section 1 ( Feather pull out ) start up process of fresh chicken.

-Supervisor all killers of fresh chicken perform the quality of food production.

-After 1 year transfer to be supervisor of packing and cold storage.

-Packing fresh chicken which was divided into slices of chicken.

-Control and freeze fresh chicken in a cold storage room.

-Organization location by number of fresh chicken in cold storage room.

-Follow up the schedule of order and loading in a container which was shipped to Japan.

Education

Bachelor in Economics of Agriculture.

From Ramkhamhaeng University Bangkok Thailand. 1974-1980

Language

1 English

2. Arabic

3. Thais

Availability

Computer Warehouse Management Safety Officer

Truck driver Forklift Operator excavator Operator

Small van driver Turbine fitter Overheard Creams Operator

Taxi driver



Contact this candidate