Post Job Free

Resume

Sign in

Data Collection Water Quality

Location:
Yangon, Myanmar
Salary:
3000 USD ~ 5000 USD
Posted:
August 19, 2023

Contact this candidate

Resume:

Curriculum Vitae (CV)

*.Proposed Position:

Civil Engineer

2.Name of Firm:

Myanmar Koei International Ltd.

3.Name of Expert:

Mrs. Ei Ei Khin

4.Date of Birth:

** ******* ****

Citizenship:

Myanmar

5.Education:

A.G.T.I (Civil) [Government Technical Institute] Maubin, Yangon, Myanmar (1998- 2000)

B.A (Eco) [Dagon University] Yangon, Myanmar (2000-2002)

Post Graduated Diploma in Business Management, [Anglia Ruskin University], London, UK (Dec 2017- June 2018)

MBA (Master of Business Administration), [Anglia Ruskin University], London, UK (Dec 2017- Nov 2018)

•MIPD (Master of Infrastructure Planning and Development) [University of Seoul], Seoul, Korea (Aug 2018- Feb 2020)

6.Membership in Professional Associations and Publications:

Register Senior Engineer, Part-I passed on September, 2016 (Myanmar Engineering Council)

Provision of Rain Water Harvesting System, Effect on Safe Drinking Water in Myanmar, Academic Journal, University of Seoul, Korea

Country paper and presentation of Watsan activities in Myanmar, National Environmental Engineering Research Institute, Napur, India

Country paper and presentation of existing situation of sewerage treatment plant in Myanmar, Case study of action plan JICA Training Center, Tokyo in Japan

An analysis on the impact of training and development on employee productivity NRC organization in Myanmar, Master Thesis, Anglia Ruskin University

Analysis of Delay Factors of Rural School construction projects in Myanmar, Master Thesis, University of Seoul

7.Other trainings:

•Emergency Water Supply and Sanitation facilities, National Environmental Engineering Research Institute, Napur, India ( March 2007- April 2007)

•Central Civil servant of administration and management Training, Phaunggyi University, Phaunggyi Tsp., Yangon, Myanmar (Oct 2005 -Jan 2006)

•Sewerage Work Engineering and Storm Water Drainage Technologies, JICA Training Center, Tokyo, Japan (Sep 2013- Jan 2014)

•ToT of Water Safety Plan, World Health Organization, Yangon, Myanmar ( Dec 2013)

•Advanced Civil Engineering Training (government internal official), YCDC Training School, Mingalar Taung Nyunt Tsp, Yangon, Myanmar (2013)

•Auto CAD 2D/3D training, Future Generation Engineering, Yangon, Myanmar (2013)

•Basic / Advanced Field Safety and Security Training, United Nation (Aug 2016)

•Landmines and Explosive Remnants of War Safety training, United Nation (Sep 2016)

•Gravity Flow Water Supply Training, Norwegian Refugee Council, INGOs (Dec 2017)

•English Intermediate Training (2021)

8.Countries of Work Experience:

Myanmar/ Republic of Korea

9.Language Skills (indicate only languages in which you can work):

LANGUAGE

SPEAKING

READING

WRITING

English

Excellent

Excellent

Excellent

Myanmar

Native

Native

Native

Korea

Basic

Basic

Basic

10.Employment Record:

Period

Employing organization and your title/position. Contact information for references

Country

Summary of activities performed relevant to the Assignment

Oct. 2022 - Present

Myanmar Koei International Ltd

Civil Engineer (Water Supply and Sewerage)

Reference;

Mr. Kazuhisa IWAMI

Managing Director

ady2ei@r.postjobfree.com

Myanmar

Responsible for assist the survey Data of overall Mandalay International Airport such as existing situation of water supply, water treatment plant and sewerage treatment plant, building construction and electricity, calculation of capital expenditure, cost estimation, reviewing design and BoQ calculation of expand the project. Submit the report of existing situation of water supply and sewerage at Mandalay International Airport. Assist the Data collection of solid waste management project with PCCD department, YCDC. Filling Data in the spread sheet. Coordination with communities and government. Data collection of Algae in oversea countries. Desk survey, searching data online, fill in spread sheet.

Feb. 2022-

Sep. 2022

Poverty Reduction II Water Supply Project, JICA

Operation and Maintenance Specialist (Finance and Tariff System)

Myanmar

Responsible for data collection and assessment, desk survey, finding documents, questionnaire survey, data analysis and preparing of reporting and recommendation for water supply system sustainability in future, inputting data in excel sheets, coordination with government, attending meeting and make presentation with government, assist international expects and local expects, reporting documentation of minute of meeting, orientation workshop for water supply project at national level and township level, supervision and monitoring of the town water supply system on site, technical transfer to local staffs and water technician for technical aspects on NRW reduction, billing and collection for water tariff system, weekly report, monthly report and documentation management, water quality analysis and monitoring. Training of water supply System for capacity building.

Feb. 2021-

Dec. 2021

CUREIP Urban Environment Project against COVID-19, JICA

Residence assistant Engineer to Urban Environment

Myanmar

Responsible for data collection and assessment, desk survey, finding documents for project planning online, data analysis, inputting data in excel sheets, coordination and attending meeting with international expects and local expects, reporting documentation and minute of meeting, making summary of financial and other related urban environment reports.

Jun. 2020-

Jan. 2021

Yangon Circular Railway Line Upgrading Project, JICA

Quality Assurance and Control Engineer (YCRCMC)

Myanmar

Responsible for reporting and QA/QC documentation, Ensure of documentation for hand over certificates. Assure technical documents relative to site quality control. Review QC inspection check Sheets and documents to ensure quality requirement, site inspection and project implementation, Coordinate with government representative on project issues and attendance meetings. Monitoring and supervision of YCR construction project, Monitor progress of pre-final inspection.

Mar. 2020- May. 2020

Strategic Urban Development Project (SUDP), JICA

Urban Infrastructure Sector-1

Myanmar

Responsible for data collection and document controlling, supporting and coordination with Y^CDC, attending meeting with governmet, reporting and analysizing.

Jan. 2018-

July. 2018

Feasibility Study for Sewerage System Development in Yangon City, JICA

Civil Engineer (Sewerage system)

Myanmar

Responsible for supporting and coordination, data collection and documentation, drawing design of sewer pipe line network and BDS, area calculation & estimation BoQ of sewerage treatment plant, assist for making organization Structure of YCDC (Water Supply and Sanitation department).

April. 2015 – Dec. 2017

SIRP, South East Infrastructure Rehabilitation Project,

Norwegian Refugee Council, NRC, Shelter Officer (Engineer)

Responsible for assist to project manager for preparing of project planning, drawing design, estimating BoQ, tendering process, making contract with contractors and community including financial payments process, finical management implementation of construction work, quality control and assurance to overall school building construction, renovation of school construction, road and bridge construction including drain, Gravity Flow Water Supply system, field assessment of data collection survey with communities, communities and technical based approach, shallow Well and ground water storage tank construction, spring water protection, installation of intake and small scale water filtration tank, installation of pipe and accessories, manhole, back wash, cleaner, connection of pipe and water stand pipes. construction supervision for weekly on site, quality control of building materials, reporting and QA/QC documentation, monitoring and evaluation for overall construction projects in rural area, Water quality controlling and testing, Monitoring of water supply continuously the whole year. Maintenance Training to local people such as basic construction training method and sharing knowledge for capacity building, Ensure of documentation for hand over process to MOE, government.

Sep. 2012 – April. 2015

Yangon City Development Committee, Myanmar, YCDC, Sub; Assistant Engineer

Myanmar

Responsible for drawing design, estimating of BoQ, construction and renovation of office building, toilets with septic tank in Yegu office and Yegu staff house, Construction of electricity building and lighting posts in Lagoonpyin Water Treatment Plant and six numbers of pump house in Kantawgyi lake, construction basement of Yegu pumping station, fencing, painting works, construction supervision, Monitoring of water distribution network for the whole Yangon city. Daily water flow rate, water production volume, dosing Chlorination, water quality testing and NRW calculation, assist the operation and maintenance of pumps, motors and pipelines. I make the distribution of urban water supply system to the whole Yangon city daily. Data record and analysis of daily water level and reporting to Assistant Engineer. Day to day management of workers for 24 hours water supply to the communities by shift. Attending coordination meeting, technical meeting, replying complaints to local, analysis of water bill and connection of water meters in Yangon. Checking NRW through the pipeline, construction of underground tanks, toilets and fencing, operation and maintenance of pumps and motors, monitoring of water quality and chlorine residual daily and reporting. Controlling Dosing Chlorination of water daily. Water quality testing with portable water testing kit. Explanation of about Yangon city water supply system to observers such as students from university of Medicine and MPH students, International expects from water works. Monitoring of electricity outbreak and shortage of water supply. Calculation of chemical cost (Chlorine) for water purification and equipment.

May, 2002 – Sep. 2012

Ministry of Health and Sports, Myanmar MOHS, Sub; Assistant Engineer

Myanmar

Responsible for: assist to Deputy Director and Senior Engineers for preparing of project planning, proposal writing, drawing design of latrine and water supply pipe network connection, BoQ estimation calculation of cost, reporting of existing situation of hospital water supply and septic tank, And recommendation of hospital water supply and septic tank construction required places. Construction of water supply pipe reticulations network, government office house pipeline network connection, Installation of pumps and overhead tank, drilling of deep well in dry zone, shallow well, hand pumps and renovation of ponds, making river water purification by chlorination, assist to making workshops at states/divisions level and townships level related water and sanitation projects such as National Sanitation Week, CLTS funded by UNICEF. I supposed Water Safety Plan projects funded by WHO to all states and divisions in Myanmar. I did Water Quality Testing with field water testing kit and analysis in the laboratory at Environmental Sanitation department at Ministry of Health Office in Naypyitaw. I supposed ToT of watsan awareness training to communities in rural area funded by UN agencies. I assist small scale slow sand filter construction and chlorination in water for purification in rural area. I made technical transfer to communities how to make slow sand filter in the house. I assist data collection survey for water and sanitation in communities with local staffs from Ministry of Health. Watsan data controlling and management of all hospital’s ad RHCs in all states and divisions. Analysis of weakness of watsan area and select townships, after prepare to give workshops, training and watsan projects in this necessary places yearly. Managing of inventory and delivering watsan materials to state and divisions for watsan projects funded by UNDP, UNICEF, WHO and World Vision (INGOs). I learnt Design of Small Community Water Supply System and Gravity Flow at UNDP Project rural area in Myanmar. I cooperate Disaster Management in Camps (Cyclone Nargis Effected Area) Warkaema tsp, laputtar tsp in Ayeyarwaddy division. Installation of hospital water supply system, renovation of maintenance of hospital building construction, ToT on Water Sanitation and Hygiene and ToT on CLTS Training at UNICEF Project, Drawing Design of Low Cost Sanitary Latrine & Drainage, Installation of water purification plant for Drinking Water at Myaung Mya Hospital, Myaung Mya Tsp in Ayeyarwaddy Division funded by Norway. Assist water quality controlling and monitoring projects in rural area funded by WHO. Monitoring & evaluation for water supply project as a liaison officer with INGOs. I travelled many times as a liaison officer for monitoring and evaluation of watsan projects of INGOs with international staffs to states and divisions, rural area in Myanmar. After I submit the repot to Minister (MOH) about the project conditions of INGOs. Assist to give training about watsan to midwives, basic staffs workers. Survey Data collection of improved safe drinking water source and protected/unprotected latrine in Phyu township with MOHS staff and reporting to Deputy Director at environmental sanitation division.

Jan. 2001 – Dec. 2001

Shwe Than Lwin Company Ltd.

Myanmar

Responsible for the engineering supervision and inspection of various constructions of reinforced concrete single, two, three and five-storey buildings.

Aug. 2000– Dec. 2000

Myanmar Golden Crown Company Ltd.

Myanmar

Responsible for the engineering supervision and inspection of various constructions of reinforced concrete three storey school buildings and factories in Shwe Pyi Thar Industry Zone.

11

Reference to Prior Work/ Assignments that Best Illustrates Capability to Handle the Assigned Tasks:

Name of project or assignment: Survey for Expand of MIA, solid waste management and algae

Year: October, 2022 – Present

Location: Myanmar

Client: Myanmar Koei International Ltd.

Main Project Features: Data collection survey of overall Mandalay International Airport, data survey of current situation of water supply and sewerage system and reporting, calculation of BoQ, financial capital expenditure, PPP project with MIA, data survey of solid waste management project, data collection of algae in oversea countries.

Position held: Civil Engineer (Water Supply and Sewerage)

Activities performed: Responsible for:

- Assist the survey Data of overall Mandalay International Airport such as existing situation of water supply, water treatment plant and sewerage treatment plant, building construction and electricity, calculation of capital expenditure, cost estimation, reviewing design and BoQ calculation of expand the project. Submit the report of existing situation of water supply and sewerage at Mandalay International Airport. Assist the Data collection of solid waste management project with PCCD department, YCDC. Filling Data in the spread sheet. Coordination with communities and government. Data collection of Algae in oversea countries. Desk survey, searching data online, fill in spread sheet.

Name of project or assignment: Poverty Reduction II Water Supply Project, Myanmar.

Year: February, 2022 – September, 2022 (8 months)

Location: Myanmar

Client: Japan International Cooperation Agency (JICA) with Department of Rural Development

Main Project Features: The project is urban water supply project with DRD, JICA ODA loan project for 22 townships in Myanmar. The project includes water source facilities, water conveyance facilities, water treatment facilities, water reserve facilities, water distribution facilities, electric power receiving facilities and equipment for operation & monitoring.

Position held: Operation and Maintenance Specialist (Finance and Tariff System)

Activities performed: Responsible for:

- data collection and assessment, desk survey, finding documents, questionnaire survey, data analysis and preparing of reporting and recommendation for water supply system sustainability in future, inputting data in excel sheets, coordination with government, attending meeting and make presentation with government, assist international expects and local expects, reporting documentation of minute of meeting, orientation workshop for water supply project at national level and township level, supervision and monitoring of the town water supply system on site, technical transfer to local staffs and water technician for technical aspects on NRW reduction, billing and collection for water tariff system, weekly report, monthly report and documentation management, water quality analysis and monitoring. ToT of water supply System for capacity building.

Name of project or assignment: CUREIP Urban Environment Project against COVID-19, Myanmar

Year: February, 2021 – December, 2021 (11 months)

Location: Myanmar

Client: Japan International Cooperation Agency (JICA)

Main Project Features: Data collection and analysis of COVID-19, Collecting information related to Health Measures, Infrastructure status in Yangon.

Position held: Residence assistant Engineer to Urban Environment

Activities performed: Responsible for:

- data collection and assessment, desk survey, finding documents for project planning online, data analysis, inputting data in excel sheets, coordination and attending meeting with international expects and local expects, reporting documentation and minute of meeting, making summary of financial and other related urban environment reports.

Name of project or assignment: Yangon Circular Railway Line Upgrading Project, Myanmar.

Year: Jun, 2020 and Jan, 2021 (8 month)

Location: Myanmar

Client: JICA with Myanmar Railway

Main Project Features: The project is railway infrastructure Yangon Circular Railway Line Upgrading project in Myanmar. JICAODA loan with Myanma Railway, Ministry of Transportation and Communication.

Position held: Quality Assurance and Control Engineer (YCRCMC)

Activities performed: Responsible for:

- Reporting and QA/QC documentation, Ensure of documentation for hand over certificates. Assure technical documents relative to site quality control. Review QC inspection check Sheets and documents to ensure quality requirement, site inspection and project implementation, Coordinate with government representative on project issues and attendance meetings. Monitoring and supervision of YCR construction project, Monitor progress of pre-final inspection.

Name of project or assignment: Strategic Urban Development Project (SUDP), Myanmar.

Year: March, 2020 – May, 2020 (3 months)

Location: Myanmar

Client: JICA with Yangon City Development Committee

Main Project Features: Data collection and document controlling, supporting and coordination with YCDC.

Position held: Urban Infrastructure Sector-1

Activities performed: Responsible for data collection and document controlling, supporting and coordination with YCDC, attending meeting with government, reporting and analyzing.

Name of project or assignment: Feasibility Study for Sewerage System Development in Yangon City, Myanmar.

Year: January, 2018 – July, 2018 (7 months)

Location: Myanmar

Client: JICA with Yangon City Development Committee

Main Project Features: Study on infrastructure development for sewerage system in Yangon City, Myanmar. Preliminary review on the existing document, checking the design conditions, and preparation of the questionnaires for collection of data and information. Data collection including Japanese sewerage technologies. Review and confirmation of the current status/issues, design conditions and criteria, etc. Preliminary Study on Sewage Collection System. Study on Sewerage System (including site survey). Preliminary Design and Cost Estimate. Financial/ Economical analysis. Environmental and Social Consideration. Study on Technical Assistance for Capacity Development. JICA study team implemented the project with YCDC.

Position held: Civil Engineer (Sewerage system)

Activities performed: Responsible for:

-Responsible for supporting and coordination, data collection and documentation, drawing design of sewer pipe line network and BDS, area calculation & estimation BoQ of sewerage treatment plant, assist for making organization Structure of YCDC (Water Supply and Sanitation department).

Name of project or assignment: SIRP, South East Infrastructure Rehabilitation Project in Myanmar

Year: April, 2015 – December, 2017 (2 years and 9 months)

Location: Myanmar

Client: Norwegian Refugee Council funded by Europe Union

Main Project Features: The project is overall construction supervision of school building, road and bridge, gravity flow water supply system and public work. Target area are Tanintharyi Division and Kayin State. (SIRP) South East Infrastructure Rehabilitation Project in Myanmar funded by Europe unition. One of the INGOs,Norwegian Refugee Council implementation project.

Position held: Shelter Officer (Engineer)

Activities performed: Responsible for:

- Assist to project manager for preparing of project planning, drawing design, estimating BoQ, tendering process, making contract with contractors and community including financial payments process, finical management implementation of construction work, quality control and assurance to overall school building construction, renovation of school construction, road and bridge construction including drain, Gravity Flow Water Supply system, field assessment of data collection survey with communities, communities and technical based approach, shallow Well and ground water storage tank construction, spring water protection, installation of intake and small scale water filtration tank, installation of pipe and accessories, manhole, back wash, cleaner, connection of pipe and water stand pipes. construction supervision for weekly on site, quality control of building materials, reporting and QA/QC documentation, monitoring and evaluation for overall construction projects in rural area, Water quality controlling and testing, Monitoring of water supply continuously the whole year. Maintenance Training to local people such as basic construction training method and sharing knowledge for capacity building, Ensure of documentation for hand over process to MOE, government.

Name of project or assignment: Government work, Yangon City Development Committee, Myanmar

Year: September, 2012 – April, 2015 (2 years and 8 months)

Location: Myanmar

Client: Public

Main Project Features: The project is water supply and sanitation sectors, construction supervision of office building, pump house, electricity building and operation and maintenance of urban water supply system, water quality controlling and monitoring for public water works, water supply, distribution to the whole Yangon city urban water supply system.

Position held: Sub; Assistant Engineer

Activities performed: Responsible for:

- Drawing design, estimating of BoQ, construction and renovation of office building, toilets with septic tank in Yegu office and Yegu staff house, Construction of electricity building and lighting posts in Lagoonpyin Water Treatment Plant and six numbers of pump house in Kantawgyi lake, construction basement of Yegu pumping station, fencing, painting works, construction supervision, Monitoring of water distribution network for the whole Yangon city. Daily water flow rate, water production volume, dosing Chlorination, water quality testing and NRW calculation, assist the operation and maintenance of pumps, motors and pipelines. I make the distribution of urban water supply system to the whole Yangon city daily. Data record and analysis of daily water level and reporting to Assistant Engineer. Day to day management of workers for 24 hours water supply to the communities by shift. Attending coordination meeting, technical meeting, replying complaints to local, analysis of water bill and connection of water meters in Yangon. Checking NRW through the pipeline, construction of underground tanks, toilets and fencing, operation and maintenance of pumps and motors, monitoring of water quality and chlorine residual daily and reporting. Controlling Dosing Chlorination of water daily. Water quality testing with portable water testing kit. Explanation of about Yangon city water supply system to observers such as students from university of Medicine and MPH students, International expects from water works. Monitoring of electricity outbreak and shortage of water supply. Calculation of chemical cost (Chlorine) for water purification and equipment.

Name of project or assignment: Government work, Ministry of Health and Sports, Myanmar

Year: May, 2002 – September, 2012 (10 year and 4 months)

Location: Myanmar

Client: Public

Main Project Features: The project is water supply and sanitation sectors, construction supervision of office building and public water works and sanitary facilities in all states and divisions in Myanmar funded by UNICEF, UNDP, WHO, World Vision and liaision for M&E with other INGOs which MOU with MOHS.

Position held: Sub; Assistant Engineer

Activities performed: Responsible for:

- Assist to Deputy Director and Senior Engineers for preparing of project planning, proposal writing, drawing design of latrine and water supply pipe network connection, BoQ estimation calculation of cost, reporting of existing situation of hospital water supply and septic tank, And recommendation of hospital water supply and septic tank construction required places. Construction of water supply pipe reticulations network, government office house pipeline network connection, Installation of pumps and overhead tank, drilling of deep well in dry zone, shallow well, hand pumps and renovation of ponds, making river water purification by chlorination, assist to making workshops at townships level and states and divisions level related water and sanitation projects such as National Sanitation Week, CLTS funded by UNICEF. I supposed Water Safety Plan projects funded by WHO to all states and divisions in Myanmar. I did Water Quality Testing with field water testing kit and analysis in the laboratory at Environmental Sanitation department at Ministry of Health Office in Naypyitaw. I supposed ToT of watsan awareness training to communities in rural area funded by UN agencies. I assist small scale slow sand filter construction and chlorination in water for purification in rural area. I made technical transfer to communities how to make slow sand filter in the house. I assist data collection suvery for water and sanitation in communities with local staffs from Ministry of Health. Watsan data controlling and management of all hospitals ad RHCs in all states and divisions. Analysis of weakness of watsan area and select townships, after prepare to give workshops, training and watsan projects in this necessary places yearly. Managing of inventory and delivering watsan materials to state and divisions for watsan projects funded by UNDP, UNICEF, WHO and World Vision (INGOs). I learnt Design of Small Community Water Supply System and Gravity Flow at UNDP Project rural area in Myanmar. I cooperate Disaster Management in Camps (Cyclone Nargis Effected Area) Warkaema tsp, laputtar tsp in Ayeyarwaddy division. Installation of hospital water supply system, renovation of maintenance of hospital building construction, ToT on Water Sanitation and Hygiene and ToT on CLTS Training at UNICEF Project, Drawing Design of Low-Cost Sanitary Latrine & Drainage, Installation of water purification plant for Drinking Water at Myaung Mya Hospital, Myaung Mya Tsp in Ayeyarwaddy Division funded by Norway. Assist water quality controlling and monitoring projects in rural area funded by WHO. Monitoring & evaluation for water supply project as a liaison officer with INGOs. I travelled many times as a liaison officer for monitoring and evaluation of watsan projects of INGOs with international staffs to states and divisions, rural area in Myanmar. After I submit the repot to Minister (MOHS) about the project conditions of INGOs. Assist to give training about watsan to midwives, basic staffs workers. Survey Data collection of improved safe drinking water source and protected/unprotected latrine in Phyu township with MOHS staff and reporting to Deputy Director at environmental sanitation division.

Name of project or assignment: Civil Engineering Works, Myanmar

Year: January, 2001 – December, 2001 (12 months)

Location: Myanmar

Client: : Shwe Than Lwin Construction Co., Ltd

Main Project Features: Construction of high-rise buildings in Yangon, Myanmar.

Position held: Site Engineer

Activities performed: Responsible for:

- The engineering supervision and inspection of various constructions of reinforced concrete single, two, three and five-storey buildings.

Name of project or assignment: Civil Engineering Works, Myanmar

Year: August, 2000 – December, 2000 (5 months)

Location: Myanmar

Client: : Myanmar Golden Crown Co., Ltd

Main Project Features: Construction of school buildings and factory construction in Shwe Pyi Thar Industry Zone, Yangon, Myanmar.

Position held: Site Engineer

Activities performed: Responsible for:

- The engineering supervision and inspection of various constructions of reinforced concrete three storey buildings and factories in Shwe Pyi Thar Industry Zone.

12.Certification:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe my qualifications, my experiences, and other relevant information about myself.

24/ 04/ 2023

Signature of Personnel Date (Day/Month/Year)



Contact this candidate