Post Job Free
Sign in

Vice President General Superintendent

Location:
Villa Rica, GA, 30180
Posted:
August 19, 2023

Contact this candidate

Resume:

ROBERT MOORE **********@*****.***

General Superintendent, Vice President Phone: 305-***-****

EMPLOYMENT

**** - ******* ******* ************, ***. Hialeah, FL

General Superintendent, V.P.

Duties include the supervision, staffing, and scheduling of crews. Coordinate vehicle/equipment

rental and repair, and the procurement of materials.

Projects include:

o Turks & Caicos Islands, BWI – Repair deteriorated conc. Jetty & dredging

oOcean Cay, Island Manager – Dredge sand.

oNW 87th Ave over I-75 – Steel girder bridge on driven pile

oTri-Rail - Astaldi – PC conc. Railroad bridge on driven pile

oPort of Palm Beach – SSP bulkhead, coping, apron, utilities, dredging 350,000 CY &

Ro/Ro dock

oLas Olas Marina – PC conc. Dock, piling, utilities, buildings

oMain Marginal Wharf – SSP bulkhead, coping, drainage, & paving

oBayside Marina, Miami FL

oPort of Miami – Drainage Deep Well Drilling

oLummus Island – Redevelopment Site Lighting

oMiami Arena – Precast concrete units

oFlorida Turnpike Interchange at Joe Robbie Stadium, Steel girders

oI-95 and I-595 Bridge Construction projects

oDade County Metro-mover

The aforementioned projects involved the installation of deep well casings and the drilling of deep

drainage wells, the construction of drilled shaft foundations, the erection of precast concrete

members and structural steel, the installation of metal deck, and the driving steel piling and concrete

pilings.

These projects’ cost ranged from $2.5MM to $25MM, totaling over $125,000,000.00

2011-2012 New Castle School of Trades

Instructor Heavy Equipment Repair and Maintenance

**Note took a leave of absence for personal reasons and had to go to Ohio to help with family for a year.

Provide a budget to the school for the equipment for use to repair heavy equipment being repaired.

Worked with Caterpillar to donate equipment to be repaired (Excavators, Dozers, etc.)

Create the training classes and agenda with the school as this was not a training provided at the time, but

the need was there.

Created the basic techniques for the completion of the tasks, including the safety items related to the

operation and repair of the equipment. This included: electrical, drive trains, hydraulics, etc.

1984 - 1987 Volker Stevin Construction, Inc. Hialeah, FL

Pile Driving Superintendent

Responsible for all pile driving work required for a 19-bridge interchange at I-95 and US 441. Work

was executed on a two shift basis and involved the scheduling of personnel, equipment and materials.

Site Supervisor

Responsible for the construction of cast-in-place concrete piers in support of the I-75 post-tension

segmental highway overpass, as well as erection of segmental. Site duties included the scheduling and

supervision of work crews involved in placing reinforcing steel, fabricating formwork, and concrete

placement for the various structural elements such as footings, columns and pier caps.

Hire employees and train them.

1980 - 1984 RT Joint Venture Miami, FL

General Foreman

Responsible for the transportation and erection of approximately 21,700 concrete guideway girders

for the Metropolitan Dade County Rapid transit System. EA. Unit WT – 200,000 Lbs.

SKILLS

Microsoft Office, with excel, word and PowerPoint.

Compliance of OSHA requirements with certification card.

Ability to read and interpret Blueprints.

Forklift license from previous company.

Operate and repair 225 ton friction Crane, Front End loader and various other heavy equipment.

Good communication skills.

Setting up of quotes for projects and provide the bids.

Work with management and the employees to resolve any issues.

EDUCATION

9-month course – Civil Engineering – Pembroke Pines, Florida 1987

Diploma – Hubbard High School – Hubbard, Ohio 1976

REFERENCES

Available upon request.



Contact this candidate