Resume
Jorge Alberto Fonseca Yanez
El paso Texas.
Cell phone: 915-***-****
Email: ady0ra@r.postjobfree.com
PERSONAL INFORMATION
OBJECTIVE
EDUCATION
CERTIFICATIONS
WORK EXPERIENCE
OTHER SKILLS
COURSES AND TRAINING
OTHER ACTIVITIES
Gender: Male
Availability: Shifts working time and availability to travel.
Seeking an Engineering position with a company which will require me to utilize my skills, abilities and experience in the manufacturing field to ensure the company’s success.
Manufacturing engineer.
Universidad Autonoma de Cd. Juarez Chih.
2002 – 2007 Cd Juarez, Chihuahua.
Master Degree in Manufacturing engineering.(Thesis will be concluded 2024)
Universidad Autonoma de Cd. Juarez Chih
2012-2014 (thesis on progress)
Private Pilot
Vive Volando Flight School
2021- 2022
GD&T
Certified at GD&T 1st level
2007 (September) Cd. Juarez, Chihuahua.CENALTEC
PFMA
Diploma on PFMA elaboration
2004 (September) Cd. Juarez, Chihuahua. Delphi MTC
DFMA
Diploma on DFMA elaboration
2004 (September) Cd. Juarez, Chihuahua. Delphi MTC
SPC
Diploma on SPC elaboration and analysis
2004 (September) Cd. Juarez, Chihuahua. Delphi MTC
APQP
Diploma on PFMA elaboration
2004 (September) Cd. Juarez, Chihuahua. Delphi MTC
Company: Lexmark ( November 2019 – February 2023 )
Position: Senior SQE .
Task: Components validation and new supplier material evaluation:
New Supplier evaluations
Coordinate materials ability for prototype running.
Support to production line with components issues
ECNs creator
Cost reduction Projects
Leading RAT Meetings (Quality Issues and impacts to finish goods)
Implementation cost reduction Projects
NCM area Coordinator
Supplier Quality evaluation
Supplier Audit process
Problem solving issues
Company: Biosense ( HCL ) ( January 2018 – August 2019)
Position : Technical project Staff Engineer.
Task:
Components validation and new supplier material evaluation and activities such:
New Supplier evaluation process (feasibility phases 1& 2).
Coordinate materials ability for prototype running.
W.O. & PQ’s execution.
Coordinator for MCIP projects (Cost improvement projects).
Problem solving for components under evaluation
Material validation (PQ,) for new products
Equipment validation (IQ,OQ,PQ) New production lines at China (Shenzhen )
ECNs creator
Engineering study for verification purpose
Company Flextronics (January 2017 – January 2018) (Temporary Position)
Position: Senior SQE
Tasks: Responsible for material qualification and material release for production and other activities such:
Suppliers’ technical assessments.
Suppliers Quality audits.
RTV material coordinator.
Improvements at supplier process to reduce the scrap and defects.
Reduce the defected material rate from 27 % to 3 % by packaging improvement
projects.
NCR’S Coordinator.
Components validation process.
Root cause analysis for cosmetically and dimensional issues for stamping and
coated metals
Reduction cost projects (MCIP’s)
Manage 8 quality auditors.
Company TTM Technologies (April 2015 – September 2016)
Position: NPI & Product leader
Tasks: Responsible for supporting development of executing and implementation of new NPI that comes to the plant:
Coordinate engineering group to implement the new NPI
Develop, document and implement the TTM manufacturing process in order to
meet the ISO 9000 requirements.
Schedule and perform process audit activities (LPA), and post-audit follow-up and
recommendations.
Coordinate with customer meeting to provide project status
Implement manufacturing process for new products
Tooling and equipment transferring
Tooling and equipment validation
Provide support for manufacturing initiatives as required.
Monitor status of open document release/changes per internal standard operating
procedures.
Release and maintain new or revised product specifications.
Coordinate change control process and facilitates approval process.
Facilitates review and disposition of non-conforming materials.
Company: Lake region medical. (November 2013 – April 2015)
Position: Sr. Manufacturing engineer & NPI
Tasks: Manufacturing Engineer and training leader for new products
Training coordinator for new projects
Equipment transferring for new products.
PQ, IQ, OQ validation and engineering studies executions.
Continuous improvement for manufacturing area.
Understanding of human factors and motivation with people who report to me.
Develop (Documentation Control such as internal procedures, Work Instructions,
Visual Aids, and Forms).
GD&T Analysis for machined and mold components.
Application and analysis of testing and inspection procedures (Electrical,
Mechanical & Electronic Testing)
Process and Product validation (Design Changes, Process Changes, New Products
and Transfers).
Bill of material creation
Company: Johnson and Johnson (Jun 2009 – March 2013)
Position: Component engineer (validation Eng.)
Tasks:
Assure the quality of the components that come from any external manufacturer or
supplier into the Ethicon property that finally are utilized to be part of a final
assembly.
Problem solving for supplier quality issues utilizing problem solving techniques
such as 8D’s, 5W’s, DMAIIC process, Cause-Effect, Brain Storming, etc.
Audit the supplier on-site or from desktop based in a three-party assessment
(Business-Quality-Technical) in order to maintain the quality of the components.
Mentoring to the supplier in different improvement projects that demands 6-Sigma knowledge.
Validation of new and existing components.
Project management (due dates, activities, assignments, follow up, project tracker).
Projects management for new products, SBO project (Supplier business opportunity).
Metal injection moulding failure analysis (MIM), Powder Injection Moulding failure analysis (PIM)
Company: Visteon (2007-2009)
Position: NPD engineer.
Tasks: Introduce new products at production line
Engineering change for current products and new projects.
BOM Product creation.
Tooling analysis (capability).
Improve product process and tooling for production.
Warranty product analysis (failure).
Product design validation.
Cost reduction projects.
Test machine validation & fixture design.
Position: Delphi MTC (Manufacturing engineer.) (2003-2007)
Tasks: As manufacturing engineer has the following responsibility
Tooling and equipment design.
Product validations at Laboratories.
Prototype Designer.
Validation test Planning for new Projects.
ECR & ECN Coordinator.
Visual Aids for regular production
Manufacturing validation
Maintenance work instructions
Visual Aids
Equipment validation
Packaging engineer:
Tasks: Packaging design, Packaging evaluation such:
Impact
Durability
Humidity
Transportation
Supplier development and evaluation
Project to transfer from Mullen to ECT card board.
Tongues: Spanish as a native language, English 90%.
-Software: Microsoft Office, Autodesk AutoCAD,
-Professional Tools: Domain Minitab and Microsoft Project.
-Miscellaneous: Problem Solving Techniques, Statistical Tools (Control Charts,
Pareto, DOE, Capability Analysis, ANOVA, etc.),
Ontology training (Human development (leadership) Mexico DF June 2015).
Product design & implementation seminar (UACJ August 2007)
Industrial Engineering Teacher at the UANE (Universidad Autonoma del Noroeste ) giving classes of: Manufacturing process I, Manufacturing process II, Project Management