CARLOS B. BANTULAN
Present Address : **** ****** ****** ***** *********
USA 70714
Mobile Phone No : 208-***-****
NCCER ID No. : 20965693
E-mail Address : adxu7g@r.postjobfree.com
JOURNEYMAN PIPEFITTER
General Construction, Maintenance – Industrial (Oil/Gas/Energy) Offshore/Onshore Commercial, Building, Residential, Food Processing and Institutional
Technically proficient hardworking and physically fit to meet the demands of construction.
Maintenance, turnaround shutdown, pre-commissioning, and commissioning job
Willing to relocate and free to travel as per project location.
Result-oriented skilled professional with a solid supervisory background and experience working hand on hand as trade skilled on projects mostly overseas.
Background includes:
Power Plant Piping / Boiler and Turbine high pressure steam line
Desalination Plant Piping /Fiber glass piping, sea water pipeline
Oil Refinery Piping / Process and Utility line (Onshore/Offshore)
Petrochemical Plant Piping / Cracking Furnace Process and Utility line
Multi Storey Building HVAC Piping/Mechanical Supply and Return
Fire Protection Sprinkler Piping
Sanitary and Plumbing –Construction/Maintenance
Irrigation and Domestic Water Supply
Sewage Treatment Plant, Irrigation Pumping Station
Pre-Fabrication Piping / Oil / Gas / Energy
Piping Supports Fabrication and Installation
Pre-commissioning and commissioning process / utility line
Piping Preventive Maintenance-Oil/Gas Field
R.C.Pipe Laying for road Rehabilitation Drainage System
Oil/Gas Refinery, Revamp, Turn around Shutdown Job
CAREER ACCOMPLISHMENT
At present working as Journeyman Pipefitter at Matrix Service Piedmont LNG Maxton North Carolina
Piping fabrication and installation Process and Utility Line Pipe rack, Tank area
Punch list job, piping rectification
Hydrotesting and pneumatic test
Previously working as Journeyman Pipefitter at Zachry Industries Duke Energy Recycling Plant Goldsboro North Carolina
Piping fabrication and installation Utility Line
Punch list job, piping rectification
Hydrotesting and pneumatic test
Previously working as Journeyman Pipefitter at Turner Industries turn around shutdown Plaquemine Louisiana
Piping fabrication and installation Furnace pipe re tubing.
Furnace Burner replacement and repair.
Previously working as Journeyman Pipefitter at Brown & Root BASF turn around shutdown Seneca South Carolina
Piping rehabilitation, piping fabrication as per ISO drawing, Replacement piping installation and additional piping system, pipe supports fabrication and installation
Removed damaged silo and replace new silo.
Previously working as Journeyman Pipefitter at Summit Industrial Construction Phillips 66 Gray Oak Pump station Project Three Rivers Texas
Piping fabrication and installation underground/above ground piping, Pump station piping installation big bore & small bore, carbon steel, stainless pipe.
Pipe supports installation, Punch list and hydrotesting.
Previously working as Journeyman Pipefitter at Moore Control System Inc. Sendero Midstream Phase 2 Expansion Project. Carlsbad New Mexico
Duties and responsibilities
Monitoring Piping fabrication to insure the correct orientation and materials specification.
Updating isometric spool weld mapping, spool numbering and welders’ stencils number.
Arranging spools subject for X-rays, painting/sun blasting and spool segregation.
Materials requisition as per materials specification.
Daily Pipefitters and welder’s accomplishment report.
Conduct daily toolbox safety meeting and provide JSA for every scope of work.
Previously working as Journeyman Pipefitter at Dilling Group Inc. / Matheson Tri-Gas Project Sulpur, Louisiana
Duties and responsibilities
Ground Piping Pre-Fabrication process / Utility line
Compressor area piping erection and fit-up
Cold box piping erection and fit-up
Piping supports installation
Previously working as Journeyman Pipefitter at CB&I Chiyoda Joint Venture Cameron LNG Project Hackberry Louisiana USA
Duties and responsibilities
Coordinate with job site Supervisor / Foreman to configure pipe system layout.
Order proper pipes and other materials.
Select supports, hangers for installation
Assemble pre-fabrication expansion loop, ramdom fit up at job site.
Select type and size of pipe.
Cut, thread, and hammer pipes according to pipe system specs.
Use saws and cutting torches to craft proper pipe sizes.
Turn off steam, water, or gas from pipe section.
Secure pipes to walls and fixtures using brackets, clamps, tools
Resolve problems such as obstructions or holes.
Dip nonferrous piping materials in molten tin and lead to prevent erosion, or galvanic and electrolytic action.
Remove water from flooded manholes or basements.
Installing various pipe systems process and utility line. Installs both high and low pressure pipes that carry hot water, steam and other liquid gases. commercial oil, gas fitting or steam fitting. Working in high places and enclosed spaces, climbing, bending, stooping, crawling, kneeling, lifting, and working in extreme temperature ranges. Layout, fabrication, assembly, installation, and the maintenance of piping and piping systems, appurtenances, and equipment for steam, hot water, heating, cooling, lubricating, and industrial processing systems, on the basis of knowledge or system operation and study of building plans or working drawings. Select type and size of pipe and related materials according to job specifications. Cut or drill holes in walls for the passage of pipes. Inspect work sites to determine presence of obstructions and to ascertain that holes will not cause structural weakness. Plan the sequence of installation to avoid obstructions and activities of other construction workers. Cut pipe, using threading machine. Assemble and install a variety of metal and nonmetal pipe and pipe fittings, including those made of brass, copper, lead, glass and plastic. Join piping by means of threaded, caulked, wiped, soldered, brazed, fused, or cemented joints. Secure pipes to structure with clamps, brackets, and hangers using hand tools. (Major responsibilities and target accomplishments expected of the position including the typical problems encountered in carrying out the responsibilities.)
Install, repair and maintain plumbing systems and components Main Activities
Review building plans and specifications to determine the layout for plumbing and related materials
Identify required tools and special equipment
Select the type and size of pipe required
Locate and mark positions for connections
Install supports and hangers for pipe
Assemble and install valves and fittings
Maintain all building codes, installation requirements and relevant legislation Main Activities Perform scheduled maintenance service on plumbing systems and
Site Piping and Plumbing Supervisor for a multi-million dollars development project in the Republic of Haiti. Employed by (OECC) Overseas Engineering & Construction Co., LTDA S.A., a Haiti based Taiwanese Construction Company and all the projects were funded by the Taiwanese Government.
Duties and responsibilities
Responsible of all Piping and Plumbing works, Haiti development project.
Assisting engineering department project proposal quotation
Material takes off and design material specification checking
Supervises and coordinates activities of all Foreman under their responsibilities
Materials segregation for every company projects
Oversees of all project drawings and material specification
Supervise and provide technical guidance to tradesman on-site installation
Maintain of all jobsite progress report
Conducting safety meeting and observes all safety rules and procedures
Supervise Hydro testing, water/chlorine flushing, air blowing, and Punch list work
Coordinates with vendor technician for start up
Material requisition for every project
Oversee and supervise jobsite piping / plumbing lay out
fixtures
Apply all codes to installations, repairs and maintenance
Ensure all requirements as specified by the manufacturer of systems and fixtures are met
Ensure all installations, repairs and maintenance are properly sized, aligned, supported and graded
Ensure all installations, repairs and maintenance meet the requirements of the appropriate codes
Monitor the quality and progress of the work scope and adherence to company and contractor procedures.
Ensuring that the piping fabrication and assembly activities are carried out to the schedule cleaning class / non-cleaning class and highest HSE standards.
Ensuring necessary HSE reviews are undertaken and identified actions completed.
Providing weekly progress reports to EPC Topsides Construction Manager.
Participating in fabrication and safety reviews for piping fabrication and assembly works.
Providing technical support to the project on piping fabrication, installation, Hydro testing, Punch list works and Pre-commissioning.
Provide input to Project Documents for Piping fabrication / assembly, commissioning and start-up requirements.
Supporting Hook Up and Commissioning team for load out/in and Start-up.
Ensuring the issuance of appropriate documentation for installation works e.g. requests, permits, isolations.
Work closely with QA/QC testing and company O&M group.
Previously working as Snr. Piping Supervisor at Plant Engineering Construction PTE LTD Malaysia Tokoyama Poly Silicon Project Chiyoda SDN BHD, Malaysia
Duties and responsibilities
Monitor the quality and progress of the work scope and adherence to company and contractor procedures.
Ensuring that the piping fabrication and assembly activities are carried out to the schedule cleaning class / non-cleaning class and highest HSE standards.
Ensuring necessary HSE reviews are undertaken and identified actions completed.
Providing weekly progress reports to EPC Topsides Construction Manager.
Participating in fabrication and safety reviews for piping fabrication and assembly works.
Providing technical support to the project on piping fabrication, installation, Hydro testing, Punch list works and Pre-commissioning.
Provide input to Project Documents for Piping fabrication / assembly, commissioning, and start-up requirements.
Supporting Hook Up and Commissioning team for load out/in and Start-up.
Ensuring the issuance of appropriate documentation for installation works e.g. requests, permits, isolations.
Work closely with QA/QC testing and company O&M group.
Previously working as Piping Supervisor at Plant Engineering Construction PTE LTD (PEC) Exxon Mobil Singapore Parallel Train Project (Foster Wheeler / Worley Parson)
Duties and responsibilities
Prepare daily reports of work progress and man power utilization.
Prepare weekly reports of the total spool erection, isometric weight installed, welded diameter inches of supports and joints and the remaining work front with the materials available.
Co-ordinate with the sub-contractors to achieve the targets and schedule set by the planning.
Issue the work permits ensuring SHE requirements.
Conduct safety walk through in the site in co-ordination with the safety department on weekly basis.
Supervision of all piping works and ensures safety and quality standards of the client
Inspection and approval of all the QA/QC submittals of the subcontractor
Previously working as Piping Supervisor at Plant Engineering Construction PTE LTD (PEC) Petrochemical Corporation of Singapore (PCS OLEFIN PHASE III PROJECT) Japan Gas Corporation (JGC)-Project
Duties and responsibilities
To study the isometric drawing received from the clients and to identify the pipe lines and carry out the punch list work.
Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance with flow direction.
Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.
Monitoring the QA/QC Documentation of the subcontractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirements.
HSE initiatives and ensure compliance with Company's and Contractor's HSE plans and procedures.
Supervise and Inspection of cold and hot insulation, cladding on piping and equipment.
Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done
Previously working as Piping Supervisor at Plant Engineering Construction PTE LTD
FW-MEG – OSBL Shell Chemicals Seraya Project Singapore. (Project completed)
Duties and responsibilities
Serve as day-to-day interface with Contractor piping craft labor providing a focus on safety and quality.
Ensure that procedures and processes are understood and followed by the construction personnel.
Monitor and ensure compliance with specification, procedures, and plans.
Provide on-site knowledge of project specific piping construction requirements-
HSE initiatives and ensure compliance with Company's and Contractor's HSE plans and procedures.
Interface with QA/QC personnel to address quality issues/progress Monitor workforce progress as relative to schedule Verify arrival of procured equipment and engineering equipment implement field surveillance plans Assist with incident response case management Assist with change process at the work site.
Ensure Contractor's on site planning activities are appropriate to meet objectives.
Provide safety monitoring/leadership/coaching as well as participate in safety meetings.
Participate, coach and assist Contractor personnel in effective pre-task planning measures in JSA's, and toolbox meetings.
Participate in on site Risk Assessments and JSA development Assist in implementation of emergency response plans as needed Monitor environmental compliance as required Monitor site condition / readiness Record data for inclusion of "lessons learned"
Record data for inclusion in the preparation of close-out report.
Previously working as Mechanical Piping/Plumbing Supervisor Fluor New US Embassy Comp. Project Port au Prince, Haiti. Eight Buildings unsecured area NOB-MSGQ-UTILITY BLDG - GSO-WAREHOUSE- CCAC- MACAC- SCAC.
Duties and responsibilities
Supervision of mechanical chilled water hydronic piping supply and return pre fabrication and installation.
Installation, Chiller cooling tower, Primary/Secondary pump around piping, Air Handling
Unit installation, Domestic cold water and hot water system rough-in plumbing
Power Generator fuel supply system underground piping. Filling and distribution diesel /
Gasoline dispenser piping, underground fire hydrant and domestic water piping
Supervision domestic water supply treatment plant and waste water treatment plant piping
Installation, rough-in plumbing domestic water supply and hot water supply / return
Supervision plumbing fixtures installation, swimming pool Plumbing works
Oversee of project drawings and material specification checking
Supervision hydro testing and chlorine flushing, mechanical / plumbing punch list
Conducting safety meeting and observes all safety rules and procedures.
Served as the Piping and Plumbing Supervisor for a multi-million dollars development project in the Republic of Haiti. Employed by (OECC) Overseas Engineering & Construction Co., LTDA S.A., a Haiti based Taiwanese Construction Company and all the projects were funded by the Taiwanese Government.
Duties and responsibilities
Responsible of all Piping and Plumbing works, Haiti development project.
Assisting engineering department project proposal quotation
Material takes off and design material specification checking
Supervises and coordinates activities of all Foreman under their responsibilities
Materials segregation for every company projects
Oversees of all project drawings and material specification
Supervise and provide technical guidance to tradesman on-site installation
Maintain of all jobsite progress report
Conducting safety meeting and observes all safety rules and procedures
Supervise Hydro testing, water/chlorine flushing, air blowing, and Punch list work
Coordinates with vendor technician for start up
Material requisition for every project
Oversee and supervise jobsite piping / plumbing lay out
HVAC Piping supervisor for the Bouygues Batiment Company Project – Bank Republic
Of Haiti Port au Prince, Haiti
Duties and responsibilities
Supervision of mechanical chilled water hydronic piping supply and return pre fabrication and
Installation, Chiller cooling tower, Primary/Secondary pump around piping, Air Handling
Unit installation.
Supervision domestic water supply treatment plant and waste water treatment plant piping
Installation, rough-in plumbing domestic water supply and hot water supply / return
Fire Protection sprinkler Piping installation, sprinkler head installation
Oversee of project drawings and material specification checking
Supervision hydro testing and water flushing, mechanical / plumbing punch list
Conducting safety meeting and observes all safety rules and procedures.
Work as Piping Foreman then promoted to Piping General Foreman for two (2) Petrochemical Plant Project, Yanbu Kingdom of Saudi Arabia
Sub-Contractor – M. S. Al Suwaidi Contracting Company
Main Contractor – Japan Shiyoda Petrostar Ltd.
Project – Saudi Ibn Rushd Aromatic Petrochemical Plant Project
Duties and responsibilities
Supervision Area B process line piping erection and installation, Utility piping
Review all drawings and specification for fabrication and installation program
Undertake Piping and associated materials control on site
Supervise lay down yard spool segregation, coordinate rigging procedures for erection
Check materials deliveries against specification and order
Supervise and provide technical guidance to tradesman in fabrication and on-site installation
Maintain of shop and site progress report, look ahead planning and scheduling
Manages material requisition or transfer slip, oversees layout, fabrication and assembly of Pipes and piping system components
Plans work schedule and determine manpower requirements
Prepare test pack for hydro testing, flushing and steam blowing, Piping Supports installation. Responsible to inspect and maintains hand tools and power tools and equipment. Observes and follows all safety rules and procedures including of wearing the required
Personal safety equipment and clothing, Participates in Safety Meetings
Main Contractor – Fluor Daniel Arabia LTD.
Project – (YANPET) Yanbu Petrochemical Ethylene Expansion Project
Duties and responsibilities
Supervision Vent Flare module piping erection and installation from the new plant.
Utility piping from existing to new plant, Piping Supports installation
Supervision all existing hot tapping tie in process and utility line
Check materials deliveries against specification and order
Supervise and provide technical guidance to tradesman in fabrication and on-site installation
Maintain of shop and site progress report, look ahead planning and scheduling
Manages material requisition or transfer slip, oversees layout, fabrication and assembly of
Pipes and piping system components coordinate rigging procedures for erection
Plans work schedule and determine manpower requirements
Prepare test pack for hydro testing, flushing and steam blowing
Responsible to inspect and maintains hand tools and power tools and equipment.
Observes and follows all safety rules and procedures including of wearing the required
Personal safety equipment and clothing, Participates in Safety Meetings
Mechanical Piping Foreman, Rabigh Combined Cycle Power Plant Project – a consortium of ABB Switzerland / ABB Sae Sadelmi Italy
Duties and responsibilities
Boiler side and Turbine ground Piping erection and installation
Tank area fuel piping installation and fuel oil treatment piping installation
Sea water line piping from intake to desalination plant
Main steam piping erection and installation, boiler feed pump piping
Temporary piping installation for steam blowing
Spring hangers piping supports installation
Ethylene/Butene Piping Leadman Local Shop Maintenance- (PETROKEMYA) Arabian Petrochemical Company- M. S. Alsuwaidi Contracting Company- Manpower Supplier
Duties and responsibilities
Ethylene cracking furnace re tubing and repair, Process line additional branches hot tapping
Process line additional steam tracing piping, steam line pin hole repair and valve re packing
Safety valve calibration and valve lubrication, rotating pumps mechanical seal replacement.
Ethylene / Butene plant shut down works, Process and utility line piping modification and
Repair, Heat exchanger tube bundle removal for hydro blasting, butane plant pump around
Piping removal for hydro blasting and re installation
Cracking furnace top and bottom exchanger cover removal for hydro blasting
Attending safety rules and regulation procedures seminars
Confined space and working permit training.
Phase I Qurrayyah Power Plant and Desalination Project/ boiler and turbine piping
Sub-Contractor, M.S. Al-Suwaidi Contracting Company
Main Contractor, Mitsubishi Heavy Equipment Ltd.
Duties and responsibilities
Boiler side and Turbine ground Piping erection and installation
Main steam line 24” heavy wall thickness 80mm piping erection and fit out from boiler side
To high pressure turbine, High temperature return steam line piping installation,
Extraction steam line piping from auxiliary boiler to dearator,
Boiler feed pump piping and boiler circulation piping installation
Condenser cooling system piping installation, Piping supports installation
Steam drum Piping bypass manifold piping installation
Zero Accident Report (ARAMCO) Arabian Oil Company Shutdown Works
M.S. Al-Suwaidi Co. – Manpower Supplier
Mina Az-zour South Power Plant Project – H.V.A.C. Piping – Hitachi and Nessie Sangyo Joint Venture
H.V.A.C. and Fire Protection/ Plumbing – Riyadh King Saud University Project – French Joint Ventures
Successfully worked with foreign nationals, sharing skills and expertise safely.
Holds professional driving licenses.
Possess industrial Pipe fitter trade test and training certificate.
First aid and CPR certificate issued and conducted by Royal Commission Jubail and Yanbu Health Services Department
Safety leadership training certificate issued and conducted by Fluor Daniel Arabia LTD
Oil / Petrochemical Safety Orientation Course Certificate
PROFESSIONAL EXPERIENCES
Piping Supervision / General Construction / Maintenance (Overseas)
Can read and interpret blueprints piping layout plan and isometric drawings
Piping bill of quantity materials take off, piping scope of work planning and scheduling
Prepare cutting list of spool, pattern development layout for piping pre-fabrication
Pipe spool segregation, piping erection and rigging supervision, field weld fit-up preparation.
Workers scope of works orientation – conducting everyday safety meeting and housekeeping.
Experienced in oxy-acetylene gas welding and arc welding, copper tube sweating.
Performed air test hydro testing, steam blowing, air and water flushing and punch listing
Experienced in hot tapping tie-in, oil/gas field, Hydro testing and pre-commissioning
Oil/gas field shutdown, furnace re-tubing, heat exchanger cleaning, valve lubrication, leakage repair, piping rehabilitation, piping modification and safety valve calibration.
Experienced in on-site piping erection Oil and Gas Industries, fit-up, big bore, small bore, heavy wall, process line and utility pipe line
Pre-fabrication fit-up, carbon steel, alloy pipe, stainless steel, copper pipe, galvanized pipe etc.
Sanitary drainage system, domestic water supply distribution pump house, Irrigation Pumping Station, PVC Piping from 2” up to 80’ diameter of Pipe, schedule 40 – 80 – 160.
Plumbing design and Plumbing materials take off including plumbing fixtures.
Plumbing Works, hot water supply system, cold water supply system and Plumbing fixtures installation, domestic water supply distribution, Fire protection sprinkler system.
Mechanical room for H.V.A.C. supply and return main pipe header piping, Three-way valve by pass manifold Piping installation.
Compliance of Piping Code and American Standards, Intl. Plumbing Code and ARC Welding Society Welding Procedure.
Computer literate basic AutoCAD, Microsoft word / excel- Operates light construction equipment.
Safety slogan “Your plan for tomorrow depends on your “SAFETY” today
Work History
Matrix Service Piedmont LNG Project
Country: Maxton North Carolina USA
Position: Journeyman Pipefitter
Date: 15 Sept. 2020 – At present
Zachry Industries Duke Energy Recycling Plant
Country: Goldsboro North Carolina USA
Position: Journeyman Pipefitter
Date: 19 June 2020 to 11 July 2020
Turner Industries Turn around shutdown
Country: Plaquemine Louisiana USA
Position: Journeyman Pipefitter
Date: 19 May 2020 to 30 May 2020
Brown & Root BASF Turn around shutdown
Country: Seneca South Carolina USA
Position: Journeyman Pipefitter
Date: 09 March 2020 to 03 April 2020
Summit Industrial Const. Phillips 66 Gray Oak Pump Station Project
Country: Three Rivers Texas USA
Position: Journeyman Pipefitter
Date: 23 September 2019 to 27 February 2020
Moore Control System Sendero Midstream Phase 2 Expansion Project
Country: Carlsbad New Mexico USA
Position: Journeyman Pipefitter
Date: 23 January 2019 to 30 August 2019
Dilling Group Inc. / Matheson Tri-Gas Expansion Project
Country: Lake Charles Louisiana USA
Position: Journeyman Pipefitter
Date: 19 June 2018 to 21 December 2018
CB&I CCJV Cameron LNG Project
Country: Hackberry Louisiana USA
Position: Journeyman Pipefitter
Date: 27 May 2017 to 18 June 18 2018
(OECC) Overseas Engineering Construction Co. LTD
Country: Haiti
Position: Piping / Plumbing Supervisor
Date: 02 February 2013 to 30 September 2016
(PEC) Plant Engineering Construction PTE LTD
Country: Malaysia / Singapore
Position: Piping Supervisor
Date: 28 July 2008 to 30 August 2013
J A Jones International (a Fluor Company)
Country: Haiti
Position: Mechanical Piping / Plumbing Supervisor
Date: 23 July 2006 to 24 April 2008
(OECC) Overseas Engineering Construction Co. LTD
Country: Haiti
Position: Piping / Plumbing Supervisor
Date: 08 May 2002 to 22 June 2006
Bouygues Batiment Company
Country: Haiti
Date: 07 May 2001 to 26 March 2002
Position: Piping / Plumbing Foreman
M.S. Al-Suwaidi Contracting Company
Chiyoda Petrostar Ltd./Bechtel Company/ Saudi Ibn Rushd Petrochemical Plant Proj.
Fluor Daniel Arabia Limited Yanbu Petrochemical Plant Project (YANPET)
Country: Yanbu, K.S.A
Position: Foreman Piping/Foreman Gen. Piping
Date: 31 March 1997 to 05 August 1999
ABB SAE Sadelmi/BL Consortium
Country: Rabigh, K.S.A
Position: Mechanical Piping Foreman
Date: 26 January 1992 to 31 March 1995
M.S. Al-Suwaidi Contracting Company
(Petrokemya) Arabian Petrochemical Company
Country: Jubail, K.S.A
Position: Pipe Fitter Maintenance Leadman
Date: 01 August 1989 to 30 August 1991
M.S. Al-Suwaidi Contracting Company
Mitsubishi Heavy Industries Ltd. Qurrayah Eastern Power Plant Project
Counrty: Qurrayah, K.S.A
Position: Pipe Fitter Class “A”
Date: 24 October 1987 to 28 February 1989
Hitachi and Nessie Sangyo Joint Venture
Mina alzour South Power Plant Project
Counrtry: State of Kuwait
Position: Pipe Fitter/Fabricator Leadman
Date: 06 June 1985 to 06 June 1987
(FJVS) French Joint Ventures
King Saud University Project
Country: Riyadh, K.S.A.
Position: Pipe fitter
Date: 10 July 1983 to 20 May 1984
EDUCATIONAL ATTAINMENT
Misamis University 1974 - 1978
BSME under graduate
Ozamis City Phils.
Esteban Abada High School 1970-1974
Secondary High School
Sampaloc, M. Manila Phils.
Lanipao Pilot School 1967-1969
Magpatao Primary School 1963-1967
TRAININGS AND SEMINARS
Pipefitting/Plumbing/Welding
Pacific Engineering Training Center
Makati, Philippines
Safety Leadership Training
Fluor Daniel Arabia Ltd.
Yanbu, KSA
C.P.R First Aid Course
Royal commission Health Service Department
Yanbu, KSA
Safety Orientation / Confined Space Entry Course
Shell Seraya Chemical PTE LTD
Jurong Island, Singapore
Oil / Petrochemical Safety Orientation Course Certificate
Plant Engineering Const. PTE LTD
21Shipyard Road, Singapore 628144
Oil / Petrochemical Industry Safety Course for Supervisors
Absolute Kinetics Consultancy
64 Hill View Terrace, Singapore 669277
Occupational Safety & Health Risk Assessment Training
Plant Engineering Const. LTD
21 Shipyard Road Singapore 628144
Safety Instruction Course for Supervisors (MANHOLE)
Absolute Kinetics Consultancy LTE
64 Hill View Terrace, Singapore 669277
Permit To Work (PTW) Applicant Training Course
Exxon Mobil / Foster Wheeler/ Worley Parson
Area 17 Jurong Island Singapore
Building Construction for Supervisor Safety Course
Absolute Kinetics Consultancy PT
64 Hill View Terrace, Singapore