Arslan Ali Mumtaz
Wazirabad, Pakistan *****
OBJECTIVE
Obtain a challenging leadership position applying
creative problem solving and lean management
skills with a growing company to achieve optimum
utilization of its resources and maximum profits.
SKILLS
Great client relationship management
Specializes in strength and agility
Able to customize training for individuals
Electrical Installation
Designing of Power System
LANGUAGE
English
Urdu
Punjabi
EXPERIENCE
Beacon Impex
Electrician
Duration : 12-01-2023 - continue
Work on all electrical equipment and install all over electrical system. Installed conduit, wire and motor controls.
Traced and diagnosed electrical malfunction using hand tools and test equipment.
Installed cables, conductors and wire trays and completed necessary hook- ups for primary power lines.
Planned and installed complicated circuit systems in both commercial and residential construction.
Tested entire electrical assembly for performance levels and safety. Waetz Asia
Wastewater Treatment Plant Engineer
Duration : 13-08-2022 - 31-12-2023
Run the plant and analyse the water condition then given the treatment which required.
Sampled and tested wastewater, applied chemical dosing, received chemical shipments and performed wastewater plant preventive maintenance and minor corrective maintenance.
Operated, monitored, maintained and performed troubleshooting for wastewater, treatment facility mechanical and electrical system. Compiled and maintained data and records for plant reporting according to regulatory requirements and documented plant procedural and safety standards.
EDUCATION
The University of Faisalabad
Electrical Engineering and Technology
Passing Year - 2023
Arshad Institute of Technology
Diploma of Associate Engineer (DAE)
Passing Year - 2018
infinity School of Engineering
Programmable Logic Controller (PLC)
Passing Year - 2019
Contact: +923*********
Email: adxs75@r.postjobfree.com
DOB: 10-11-1998