Post Job Free

Resume

Sign in

Project Manager Senior

Location:
Tampa, FL
Salary:
130,000
Posted:
June 16, 2023

Contact this candidate

Resume:

SIDNEY MANNING

adxqko@r.postjobfree.com

813-***-****

YEARS EXPERIENCE RELEVANT EXPERIENCE

** ***** ** ***. ******** 22 Years

CLEARANCE

Top Secret also a T2S Public TRUST PT Moderate Level

EDUCATION

Bachelor of Science in Construction Management, Trinity University Online, San Antonio, Texas, 2003

PMP Certified thru PMI-Number 2981112

CERTIFICATIONS AND TRAINING

NTSI Training

OSHA, 30 hour

USACE 40 hour EM 385-1

USACE CQM Training

Projnet training in 2009

PROFESSIONAL SUMMARY

REQUIREMENTS

Requirement 1: Education.

Mr. Manning meets the education requirements with a Bachelor of Science in Construction Management from Trinity University (2003).

PMP Certified thru PMI

Requirement 2: 7 years’ relevant experience.

Mr. Manning has 22 years of relevant experience in Construction Project Management. A detailed breakdown of projects and roles is provided in the next section, Experience. We have interviewed each candidate to determine the percent time that was spent on construction activities in the field. Time spent on non-construction related activities such as pure design, management, and marketing was not counted towards his relevant experience.

Requirement 3: QA for construction projects.

Mr. Manning has provided QA for both domestic and international construction projects.

Requirement 4: Review contractor submittals.

Mr. Manning has relevant experience reviewing contractor submittals.

Requirement 5: Responses to RFIs.

Mr. Manning has relevant experience responding to RFIs.

Requirement 6: Independent government estimates.

Mr. Manning has relevant experience providing independent government estimates.

EXPERIENCE

Project Duration: March 2020 to Present

Position Title: Project Controls Manager

Company: Tetra Tech

Relevant Project Experience

Precent Field:20%

Percent Office: 80%

Responsible for all change orders including all checks and balance to be Submitted to the Project Director for his signature.

Responsible for all IGE estimate's

Project Duration: Oct 2018 to March 2020

Position Title: Operations and Maintenance Transition Coordinator

Company: Espire Services

Relevant Project Experience

Percent Field: 50%

Office: 50%

100% field 95 % vertical and 5% roads and landscaping

NOB 16,000SM 4 STORY, MSGR 785SM 2 STORY,SPX 1409SM 2 STORY, UTL 891SM 1 STORY, SCAP 340SM 1 STORY, PKG 9853SM 3 STORY, REC 899SM 1 STORY,

CCAB 83SM 1 STORY

MCAP 210SM 1 STORY

Description of role/relevant skills

OMTC for OBO Project in Maputo, Mozambique this is a new role created by OBO for a smooth transition from Construction to Operations and Maintenance for NEC

Responsible for all documentation and turnover to the Embassy

Worked with the contractor on Spare Parts

Work with the contractor and FM for all training and start up activities

Reviews final submittal for turnover to FM

Reviewed all Local Staffing with the FM prior to being hired

Project Duration: May 2017 – Sept 2018 Bid Build Project

Position Title: Senior Project Manager

Company: Meltech Corp, USACE Project, South Korea

Relevant Project Experience: 1 Years

Percent Field: 100%

100% VERTICAL

SKIFF 20,000SM 2 STORY

Description of role/relevant skills:

Project Manager over all Mechanical Construction on a $6 million Dollar SKIF Building

Holds full accountability for Budget, scheduling, QAQC and Safety Compliance

Reviewed schedule monthly with Client prior to monthly billing

Holds preparatory meeting with USACE before each new task starts to make sure the supervisors understands specs, materials needed and required equipment

Wrote all RFI’s to client

Invoiced the client each month and walked down the percentages that I was claiming with the client

Ordered the material and made sure it got to the shipper on time also billed for stored material

Held Safety meeting each week with Meltech employees

December 2016 – May 2017 – Seeking Employment

Project Duration: March 2014 – December 2016 Design Build Project

Position Title: Senior Project Manager

Company: Edifice Solutions, INL Project, Port-au-Prince, Haiti

Relevant Project Experience: 2 Years

Percent Field: 100%

60% VERTICAL 2 Class rooms for training 2 story 10,000 SM, 4 toilet blocks 50 SM SINGLE STORY

Perimeter Walls 6000 feet long, Single Story Kitchen 100 sm

Description of role/relevant skills:

Spearheaded construction of classrooms, kitchens toilet blocks and security wall for Haitian National in Port-au- Prince, Haiti

Held full accountability for scheduling, budgeting, quality control, and safety compliance

Wrote all RFI’s to INL

Approved subcontractor invoices each month

Answered Subcontractor RFI’S

Invoiced INL each month for work completed and material stored

Held weekly safety meetings with subcontractor

Demo of the existing classrooms so new class rooms can be installed

Project Duration: November 2013 – February 2014 Bid Build Project

Position Title: Senior Project Manager

Company: AICI-SP (Short term OBO contract), Jeddah, Saudi Arabia

Relevant Project Experience: 4 months

Percent Field: 100%

100% VERTICAL

NOB 4 Story, SPX 2 Story, REC Single Story, MSGR 2 Story, UTL Single Story

Description of role/relevant skills:

Brought on board to effectively coordinate, direct, and supervise all project activities in Jeddah, Saudi Arabia during recruitment effort for full-time project manager

Held preparatory meetings with OBO QA/QC and PD to discuss spec’s, manpower, material and equipment needed

Held weekly schedule meetings with OBO

Reviewed submittals sent to OBO

Put together invoices sent to OBO and then met with OBO to review percentages billed

January 2013 – November 2013 – Seeking Employment

Project Duration: November 2008 – December 2012 Design Build Project

Position Title:Senior Project Manager

Company: CCE, OBO, Guayaquil, Ecuador & Canberra, Australia

Relevant Project Experience: 4 Years

Percent Field: 100%

100% VERTICAL

Guayaquil New 4 STORY Consulate with UTL Bldg., Single Story Service CAC and a Single Story Personal CAC

Canberra Australia Singly Story Skiff Bldg. approx.,20,000 SM

Description of role/relevant skills:

Applied sharp organizational skills toward structuring and supervising all construction, purchasing, and engineering activities on OBO Projects in Guayaquil, Ecuador and Canberra, Australia

Responsible for complete security system installation that included cameras, microwave motion detectors and electronic intrusion detection system

$60 million OBO project

Chaired weekly meetings with OBO and subcontractors to go over scheduled activities

Approved subcontractor invoices then attached our percentages and sent to OBO for approval

Reviewed submittals sent to OBO for spec.requirements and made sure they were in Projnet

Prepared and negotiated all change orders with OBO

Project Duration: February 2008 – November 2008

Position Title: Construction Management Consultant

Company: Self-employed (contracted to C&C Construction, Kandahar, Afghanistan)

Relevant Project Experience: 9 months

Percent Field: 100%

Description of role/relevant skills:

Orchestrated bidding and coordination of projects while proactively establishing and implementing multiple departments to regular and support Quality Control, Health & Safety, and Technical Operations

Hired all safety and QAQC personnel

Wrote all Method Statements

Project Duration: June 2007 – January 2008

Position Title: Construction Management Consultant

Company: SBH Construction, USACE, Camp Victory, Iraq

Relevant Project Experience: 1 Years

Percent Field: 100%

100% VERTICAL

6 Medical Clinics 6 Story each

2 M1A1 Tank Facilities single Story

Description of role/relevant skills:

Steered timely and cost-effective project close-out efforts for all six medical clinics in Fallujah to achieve or exceed goals for client satisfaction and operational performance

Directed $50 million construction of two M1A1 tank facilities for United States Marines at Camp Fallujah

Held all preparatory meetings with contractors prior to start of work to make sure that the specifications were clearly understood

Discussed all materials required and ensured they were on site to start work

Discussed manpower and equipment needs of the Contractor

Attended all testing and inspections

Entered all subcontractor invoices in RMS each month after I approved them

Approved all submittals and shop drawings from subcontractors

Project Duration: June 2006 – June 2007 Design Build Projects

Position Title: Area Project Manager

Company: DynCorp International, INL Projects, Afghanistan

Relevant Project Experience: 1 Years

Percent Field: 100%

100% VERTICAL

ANA and ANP Brigade Facilities all had 2 Story Headquarter bldg., 4 Story Hospitals, 3 Story Barracks for Recruits, Administrative Bldgs 2 Story, Single Story Dining Facilities

Description of role/relevant skills:

Governed full-scope engineering and design-build construction activities throughout southern half of Afghanistan on ANA and ANP Brigade Facilities

Over installation of cameras at Kandahar Air base and Qalat ANA Brigade Base

Involved in 7 simultaneous projects with a collective budge of $130 million

Updated Monthly Schedule

Oversaw rebuilds for INL program, development of shelters for battered and abused women in support of CIVPOL program, and new construction for USACE, State Dept. AFCAP and LOGCAP programs

Attended weekly schedule meeting with USACE

Reviewed all submittal for spec compliance prior to submitting to USACE

Approved all subcontractor invoices

Prepared invoices sent to USACE and held meeting each month with USACE to make sure our percentages were correct prior to USACE entering into RSM for payment

Prepared and negotiated all change orders with INL and USACE

Project Duration: January 2004 – May 2006 Design and Bid Build Projects

Position Title: Project Manager

Company: Contract International, Inc., USACE, Arlington, Virginia

ANA Brigade Facilities 100% vertical

2 Story Headquarter bldg., 4 Story Hospital, 3 Story Barracks for Recruits, Administrative Bldgs 2 Story, Single Story Dining Facilities

Relevant Project Experience: 2 Years

Percent Field: 100%

Description of role/relevant skills:

Championed construction of two $67 million USACE design-build ANA brigade facilities in Afghanistan and $35 million first phase of Kandahar Airfield.

Demonstrated exceptional versatility and industry expertise in directing construction of asphalt roads, security system, infrastructure, power plant, DFAC, brigade headquarters, infantry battalion complex, motor pool, medical complex, helipad, communications building, fire station, storage facilities and 12,000 ft. runway including all lighting

Attended all prep meetings with USACE prior to each phase of construction starting

Attended weekly schedule meetings

Reviewed all submittals for compliance prior to being sent to USACE

Approved all subcontractor invoices

Answered all subcontractor RFI’S

Prepared all invoices sent to USACE that included storied materials

Prepared and Negotiated all change orders with USACE

Project Duration: January 2001 – January 2004 Bid Build Projects

Position Title: Project Manager

Company: ABB SUSA, INC

Relevant Project Experience: 3 Years

Percent Field: 100%

Beni Suef Egypt 100% Vertical

2 Story Control Room

Fayoum Egypt100% Vertical

2 Story Control Roon

Aqaba Jordan 100% Vertical

Industrual Bldg 2Story, Bank Bldg 2 Story, Administrative Bldg 2 Story

Description of role/relevant skills:

Project-managed $25 million, USAID-funded, Beni Suef water and wastewater treatment facility and $25 million USAID-funded Fayoum waste treatment facility in Egypt.

Exhibited dynamic leadership talents in planning, directing, and supervising development of $17.1 million, USAID-funded, Aqaba International Industrial Estate in Jordan

Led $30 million USACE-funded, Manta Air Force facility in Manta, Ecuador that included a complete security system

Updated Monthly Schedule

Prepared change orders to USACE

Reviewed submittals sent to USACE

Prepared all invoice sent to USAID and USACE

Negotiated all change with USAID and USACE

Project Duration: January 1996 – January 2001 Design Build Projects

Position Title: Field Project Manager

Company: Black & Veatch International

Relevant Project Experience: 5 Years

Percent Field: 100%

100% Vertical

El Salvador 2 Story Control Room

Hines Energy Florida 2 Story Control Room

Indonesia 12 Story CE Coal Fired Power Houses

Description of role/relevant skills:

Commanded onsite construction activities for numerous projects on a global scale including 91 MW heavy fuel fired power plant in El Salvador, Hines Energy Complex in Florida, 130MW single shaft gas turbines combined cycle plant, Twin 600 MW coal fired boilers in Indonesia, and gas turbine combined cycle plant in Pakistan

Performed detailed constructability reviews, value engineering, change order preparation

Claims management for all projects totaling $250 million

Updated monthly Schedule for pay request

Wrote all RFI’s to the client

Merged advanced industry experience with exemplary professionalism to serve as an expert witness in federal court and as a pivotal player in arbitration and mediation efforts

Metric/JA Jones May 1985 to December 1995 Bid and Design Build

50% Vertical

Bates Motel 3 Story

6 Studios 3 Story

Description of roles

Project Engineer Universal Studios Orlando Promoted to Project Supt then Promoted to Project Manager

Various Underground Utility Projects thru out FL

Updated monthly Gant Schedule

Wrote all RFI’s

Estimated Change orders

Reviewed monthly subcontractor invoices



Contact this candidate