Mohammed Al-sayed
Abdalkarime Al-sharif
civil site engineer
Egyptian
Married and I have 2 kids
Bahlaa city, Oman
***.****************@*****.***
I have an omani driving license
Personal Background
I’m a civil site engineer with more than 9 years experience. I worked in mega projects from excavation to finishing. I have a very good experience in all site works ( concrete and finishing works). My last position was senior site engineer and in this site I led a team of 4 engineers, 5 supervisors and at least 20 subcontractors.
Language
Arabic : mother tongue
English : good level and I’m Working in improving my level personal skills
Leader, planner, hard worker, creative and problem solver Software skills
AUTOCAD 2D SAP SAFE ETABS CSI MS OFFICE
Professional History
(1) from 7/2017 to 12/2019
Employer : Rowad Modern Engineering (RME)
Position : senior site engineer
R5 project at New capital with initial cost 12 milliard from 2/2019 to12/2019
I joined that project after finished BSF substation. In this site I had a team under my management contains four engineers and five supervisors. I was responsible for mock up cluster that we were in needed to finish it fast and with high quality to let owner start marketing.
Items I Implemented
1) Post tension slabs for all floors
2) finishing basement floor with hardener material and helicopter machine
3) Masonry works with fire rated specifications
4) Plaster works
5) Internal and outer painting
6) Installing ceramic and marble tiles
7) Installing granite flooring for stairs
8) Installing wooden fire rated doors and aluminum windows and doors
9) Installing stainless steel hand rails for stairs 10) Installing gypsum board, MDF, GRG, curtain wall and marble for entrances
11) Cement insulation for floors of bathrooms, Kitchens and balcony
12) Installing ferforje for balcony
13) Installing GRC for interfaces
14) Moisture insulation for retaining walls of cluster and Installing cartonl to save insulation layer
15) Installing stairs handrail
PAGE (1)
90% 60% 40% 40% 40% 90%
Mohammed Al-sayed
Abdalkarime Al-sharif
civil site engineer
Beni suef 500/220/22 KV GIS substation (7/2017:12/2018) I joined that project from excavation to energizing. In concrete works I was responsible for control building and fence of project. After one month I was responsible for all finishing works from block work to final finishing. in parallel with my tasks in finishing i was responsible for outdoor foundations, trenches foundations, roods, landscape and gantry fence.
Items I Implemented
1) Control building from excavation to finishing.
2) External fence from excavation to finishing.
3) Pouring stairs of all building and installing its handrails. 4) Pouring gantries area fence foundation.
5) Pouring all roads and installing rails for transformers road with special specifications.
6) Pouring cable trenches and its precast covers.
7) Masonry works, plaster, painting and all Flooring types for whole project according to specifications (ceramic, marble, cement tiles, mosaic tiles and sornaga tiles).
8) Heat and moisture insulation for all roofs after pouring L.W.C 9) Moisture insulation for walls from outside for underground water tank walls, septic tank, oil pit tanks, transformers walls, 500 KV building and 220 KV building.
10) Cement insulation for walls, floor and ceiling for underground water tank and pump room from inside and epoxy insulation for oil pit tanks from inside.
11) Pouring S.O.G for 220 KV building, control building, 500 KV building, firefighting rooms and security room)
12) Installing chequer plate for trenches inside buildings and installing grating for transformers
13) Installing fan supports for 500 KV and 220 KV buildings 14) Installing roller shutter doors for 220 KV and 500 KV buildings 15) Landscape works of whole project
16) Installing steel gates of whole project.
17) Installing steel stairs for all buildings and galvanized stairs of water tanks, septic tank and tower guards
18) Installing wire mesh for outdoor gantries area and fence of substation
19) Installing raised floor for (control room, AC/DC room and telecom room)
20) Installing false ceiling for control building
21) Installing metal gates for building
22) Installing wooden doors
23) Installing aluminum windows for all buildings
24) Installing sornaga tiles for battery room walls and flooring in control building
25) Epoxy insulation for transformers walls and flooring from inside, S.O.G of (220 KV,500 KV and control buildings), auxiliary roams and switchgear 22KV room)
26) installing curbs for whole project
27) installing gravel on gratings
PAGE (2)
1/12/1988
Egyptian
Married and I have 2 kids
Bahlaa city, Oman
***.****************@*****.***
I have an omani driving license
Mohammed Al-sayed
Abdalkarime Al-sharif
civil site engineer
(2) From 2/2016 to 7/2017
Employer : International group for trading and
Contracting {IGC}
Position : Senior site engineer
PAGE (3)
Air navigation compound at new Cairo with cost 200 Million
That project contained 30 buildings, 3 underground water tanks and one mall. I worked as a site engineer and I was responsible for 5 building. After two month I was promoted as senior site engineer then whole site was under my responsibility with 3 engineers and 4 supervisors under my management
Items I Implemented
1) Casting all items from foundation to roof
2) Masonry work with L.W.B with special specifications 3) Cement insulation for tanks from inside
4) Moisture insulation from outside and after finished insulation we built solid bricks to save it from damage
5) Plaster works
6) casting walls of fence around the Project
7) Installing ferforje
8) backfilling basements
9) painting works
1/12/1988
Egyptian
Married and I have 2 kids
Bahlaa city, Oman
***.****************@*****.***
I have an omani driving license
(3) From 9/2012 to 2/2016
Employer : AL Wataniya group for Awqaf Investments Position : site engineer
Teba gardens compound at 6 October city with cost 500 million I worked in this company as a site engineer. Then I worked as a QC engineer for concrete works. After finished concrete works I worked again as a site engineer for three blooks (blocks NO. 28, 29 and 30) in all finishing items, landscape works, fences of buildings and pouring parking floors and ramps. I worked in stage NO.2 (blocks NO.39 and 40) those two blocks contained forty buildings. under my responsibility it was fifteen buildings with five different models After finishing concrete works of stage NO.2, I was transferred to stage NO.3 at blocks NO.28,29,30 it contained fifty buildings
Items I Implemented
1) Follow all concrete works from excavation to pouring roof slab and I prepared all shop drawing of all items ( foundations, Retaining walls, slabs and columns
2) Masonry works for all buildings
3) Plaster works and painting of interfaces
4) Installing aluminum windows and doors
5) Installing wooden doors for units
6) Moisture and heat insulation for all roofs
7) Installing marble tiles for stairs
8) Pouring stairs of buildings entrances and gardens entrances of ground floor flats
9) Fences from excavation to finishing it with Hashmi stones 10) Installing ferforje for fences of buildings
Mohammed Al-sayed
Abdalkarime Al-sharif
civil site engineer
PAGE (4)
1/12/1988
Egyptian
Married and I have 2 kids
Bahlaa city, Oman
***.****************@*****.***
I have an omani driving license
11) Installing curbs (sidewalks curbs and garden curbs) 12) Installing interlock tiles for all sidewalks
13) Pouring basements floors and ramps and finishing it with hardener material and helicopter machine
14) Moisture insulation for retaining walls of all buildings 15) installing cement tiles for roofs
16) installing handrails for stairs
17) installing steel gates for all buildings
• Notes
1) I did all shop drawings
2) I worked at all items of this project In this project 3) I worked with 15 subcontractors at least
4) I did all contractors statements to make executive abstract for contractors
5) I joined this project from stage NO.2 to finishing of whole project
(4) From 7/2011 to 9/2012
Employer: Ghanem consulting office
Position : site engineer
Projects
• Legality association at Mansoura with 7 million cost.
• Amr Ibn El-Aas mosque at Aga city 5 million cost
• Aleman association at Mansoura 10 million cost A
• lot of residential building
I worked in many projects and I had learned many things about office and site works. I worked in AutoCAD and SAP to draw architectural and civil drawings and I improved my level in these programs.
Items I Implemented
I supervised all works in many projects
1) Excavation and installing soil replace
2) Supervised all concrete works
3) Masonry works
4) Plaster works
5) painting works
6) Marble for floors and walls
7) Wooden doors and windows
8) Office works
9) AutoCAD drawing
10) I supervised a lot of items of mosques