Post Job Free

Resume

Sign in

Civil site engineer

Location:
Muscat, Muscat Governorate, Oman
Posted:
June 10, 2023

Contact this candidate

Resume:

Mohammed Al-sayed

Abdalkarime Al-sharif

civil site engineer

*/**/****

Egyptian

Married and I have 2 kids

Bahlaa city, Oman

+968********

adxmu5@r.postjobfree.com

I have an omani driving license

Personal Background

I’m a civil site engineer with more than 9 years experience. I worked in mega projects from excavation to finishing. I have a very good experience in all site works ( concrete and finishing works). My last position was senior site engineer and in this site I led a team of 4 engineers, 5 supervisors and at least 20 subcontractors.

Language

Arabic : mother tongue

English : good level and I’m Working in improving my level personal skills

Leader, planner, hard worker, creative and problem solver Software skills

AUTOCAD 2D SAP SAFE ETABS CSI MS OFFICE

Professional History

(1) from 7/2017 to 12/2019

Employer : Rowad Modern Engineering (RME)

Position : senior site engineer

R5 project at New capital with initial cost 12 milliard from 2/2019 to12/2019

I joined that project after finished BSF substation. In this site I had a team under my management contains four engineers and five supervisors. I was responsible for mock up cluster that we were in needed to finish it fast and with high quality to let owner start marketing.

Items I Implemented

1) Post tension slabs for all floors

2) finishing basement floor with hardener material and helicopter machine

3) Masonry works with fire rated specifications

4) Plaster works

5) Internal and outer painting

6) Installing ceramic and marble tiles

7) Installing granite flooring for stairs

8) Installing wooden fire rated doors and aluminum windows and doors

9) Installing stainless steel hand rails for stairs 10) Installing gypsum board, MDF, GRG, curtain wall and marble for entrances

11) Cement insulation for floors of bathrooms, Kitchens and balcony

12) Installing ferforje for balcony

13) Installing GRC for interfaces

14) Moisture insulation for retaining walls of cluster and Installing cartonl to save insulation layer

15) Installing stairs handrail

PAGE (1)

90% 60% 40% 40% 40% 90%

Mohammed Al-sayed

Abdalkarime Al-sharif

civil site engineer

Beni suef 500/220/22 KV GIS substation (7/2017:12/2018) I joined that project from excavation to energizing. In concrete works I was responsible for control building and fence of project. After one month I was responsible for all finishing works from block work to final finishing. in parallel with my tasks in finishing i was responsible for outdoor foundations, trenches foundations, roods, landscape and gantry fence.

Items I Implemented

1) Control building from excavation to finishing.

2) External fence from excavation to finishing.

3) Pouring stairs of all building and installing its handrails. 4) Pouring gantries area fence foundation.

5) Pouring all roads and installing rails for transformers road with special specifications.

6) Pouring cable trenches and its precast covers.

7) Masonry works, plaster, painting and all Flooring types for whole project according to specifications (ceramic, marble, cement tiles, mosaic tiles and sornaga tiles).

8) Heat and moisture insulation for all roofs after pouring L.W.C 9) Moisture insulation for walls from outside for underground water tank walls, septic tank, oil pit tanks, transformers walls, 500 KV building and 220 KV building.

10) Cement insulation for walls, floor and ceiling for underground water tank and pump room from inside and epoxy insulation for oil pit tanks from inside.

11) Pouring S.O.G for 220 KV building, control building, 500 KV building, firefighting rooms and security room)

12) Installing chequer plate for trenches inside buildings and installing grating for transformers

13) Installing fan supports for 500 KV and 220 KV buildings 14) Installing roller shutter doors for 220 KV and 500 KV buildings 15) Landscape works of whole project

16) Installing steel gates of whole project.

17) Installing steel stairs for all buildings and galvanized stairs of water tanks, septic tank and tower guards

18) Installing wire mesh for outdoor gantries area and fence of substation

19) Installing raised floor for (control room, AC/DC room and telecom room)

20) Installing false ceiling for control building

21) Installing metal gates for building

22) Installing wooden doors

23) Installing aluminum windows for all buildings

24) Installing sornaga tiles for battery room walls and flooring in control building

25) Epoxy insulation for transformers walls and flooring from inside, S.O.G of (220 KV,500 KV and control buildings), auxiliary roams and switchgear 22KV room)

26) installing curbs for whole project

27) installing gravel on gratings

PAGE (2)

1/12/1988

Egyptian

Married and I have 2 kids

Bahlaa city, Oman

+968********

adxmu5@r.postjobfree.com

I have an omani driving license

Mohammed Al-sayed

Abdalkarime Al-sharif

civil site engineer

(2) From 2/2016 to 7/2017

Employer : International group for trading and

Contracting {IGC}

Position : Senior site engineer

PAGE (3)

Air navigation compound at new Cairo with cost 200 Million

That project contained 30 buildings, 3 underground water tanks and one mall. I worked as a site engineer and I was responsible for 5 building. After two month I was promoted as senior site engineer then whole site was under my responsibility with 3 engineers and 4 supervisors under my management

Items I Implemented

1) Casting all items from foundation to roof

2) Masonry work with L.W.B with special specifications 3) Cement insulation for tanks from inside

4) Moisture insulation from outside and after finished insulation we built solid bricks to save it from damage

5) Plaster works

6) casting walls of fence around the Project

7) Installing ferforje

8) backfilling basements

9) painting works

1/12/1988

Egyptian

Married and I have 2 kids

Bahlaa city, Oman

+968********

adxmu5@r.postjobfree.com

I have an omani driving license

(3) From 9/2012 to 2/2016

Employer : AL Wataniya group for Awqaf Investments Position : site engineer

Teba gardens compound at 6 October city with cost 500 million I worked in this company as a site engineer. Then I worked as a QC engineer for concrete works. After finished concrete works I worked again as a site engineer for three blooks (blocks NO. 28, 29 and 30) in all finishing items, landscape works, fences of buildings and pouring parking floors and ramps. I worked in stage NO.2 (blocks NO.39 and 40) those two blocks contained forty buildings. under my responsibility it was fifteen buildings with five different models After finishing concrete works of stage NO.2, I was transferred to stage NO.3 at blocks NO.28,29,30 it contained fifty buildings

Items I Implemented

1) Follow all concrete works from excavation to pouring roof slab and I prepared all shop drawing of all items ( foundations, Retaining walls, slabs and columns

2) Masonry works for all buildings

3) Plaster works and painting of interfaces

4) Installing aluminum windows and doors

5) Installing wooden doors for units

6) Moisture and heat insulation for all roofs

7) Installing marble tiles for stairs

8) Pouring stairs of buildings entrances and gardens entrances of ground floor flats

9) Fences from excavation to finishing it with Hashmi stones 10) Installing ferforje for fences of buildings

Mohammed Al-sayed

Abdalkarime Al-sharif

civil site engineer

PAGE (4)

1/12/1988

Egyptian

Married and I have 2 kids

Bahlaa city, Oman

+968********

adxmu5@r.postjobfree.com

I have an omani driving license

11) Installing curbs (sidewalks curbs and garden curbs) 12) Installing interlock tiles for all sidewalks

13) Pouring basements floors and ramps and finishing it with hardener material and helicopter machine

14) Moisture insulation for retaining walls of all buildings 15) installing cement tiles for roofs

16) installing handrails for stairs

17) installing steel gates for all buildings

• Notes

1) I did all shop drawings

2) I worked at all items of this project In this project 3) I worked with 15 subcontractors at least

4) I did all contractors statements to make executive abstract for contractors

5) I joined this project from stage NO.2 to finishing of whole project

(4) From 7/2011 to 9/2012

Employer: Ghanem consulting office

Position : site engineer

Projects

• Legality association at Mansoura with 7 million cost.

• Amr Ibn El-Aas mosque at Aga city 5 million cost

• Aleman association at Mansoura 10 million cost A

• lot of residential building

I worked in many projects and I had learned many things about office and site works. I worked in AutoCAD and SAP to draw architectural and civil drawings and I improved my level in these programs.

Items I Implemented

I supervised all works in many projects

1) Excavation and installing soil replace

2) Supervised all concrete works

3) Masonry works

4) Plaster works

5) painting works

6) Marble for floors and walls

7) Wooden doors and windows

8) Office works

9) AutoCAD drawing

10) I supervised a lot of items of mosques



Contact this candidate