Results-oriented Construction Manager with progressive experience in various aspects of construction projects such as planning, directing, coordinating workers, choosing contractors, and monitoring performance. Skilling in how to examine a building project and oversee and monitor all parts to make it come together safety within budget guidelines. Excellent communicator, adept at communicating at motivating diverse team members to work together to achieve common business objectives.

QUALIFICATIONS SUMMARY

● Supervised projects such as the Wilson Road Valve Station tie into the Saginaw Trail Pipeline Phase 3 in addition to Carpenter Road Valve Station and Irish road Valve Station tie into the Saginaw Trail Pipeline Phase 3.

● Managed the successful construction of 17MM Utica Lateral Pipeline Project.

● Received multiple certifications such as Certified Pipeline Welding Inspector, Red Cross First Aid/CPR, and Safe-Land Basic Safety Awareness to showcase industry knowledge. PROFESSIONAL EXPERIENCE

Consumers Energy June 2019 – Present

Gas Construction Manager

Maintain responsibility for defining clear roles, responsibilities, and project deliverable requirements in terms of both scope and schedule to team members. Continuously monitor construction productivity and schedule performance to identify potential reasons for unsatisfactory performance. Recommend and institute measures for improvement through modifications to operating procedures or standard work procedures.

● Using astute safety management skills with an extensive career in construction, to consistently develop and maintain a safe working environment.

● Delegate contractors and other on-site support staff through working conditions to avoid project setbacks.

● Regularly update owners and investors with detailed progress reports to keep them abreast of progression throughout the project lifecycle.

● Analyze bill of materials for construction in attempt to keep expenditures to a minimum and in alignment with project bid.

● Using astute safety management skills with an extensive career in construction, to consistently develop and maintain a safe working environment. Safety is always the first priority. Staffmark January 2020 – April 2020

Commercial Driver

Performed comprehensive inspections of assigned vehicle prior to and following each trip. Ensured materials are properly secured in a truck or flatbed to prevent damage and/or injury. Checked weather conditions and road reports before departure. Confirmed that the contents of each shipment load matches manifest documentation. Page 2 of 5

● Determined the total time period and shortest routes from origin to specified destinations to deliver goods as efficiently and safely as possible.

● Inspected vehicles for fuel and oil level, spare parts, weight load, and proper working conditions before departure in compliance with internal and external protocols. Consumers Energy June 2019 - Present

Gas Construction Manager

Oversaw the day-to-day construction management of the project from inception to completion. Developed and organized the construction effort to formulate the most cost-effective plan to ensure timely completion within budget. Reported to Project Manager or Sr Construction manager on project details such as progress, risks, and opportunities.

● Generated construction documentation for inspections which included monthly progress payments, contract change orders, and work reports.

● Provided project scheduling, budget projections, and cost analysis. Additional Experience

Gas Construction Manager, Consumers Energy (PFES), April 2023-Present

• St. Louis Valve Site RTU, Foundation, and Building Upgrade Gas Construction Manager, Consumers Energy (PFES), January 2023-April 2023

• St. Clair Natural Gas Odorizer Station. Pre-Construction consisting of civil, mechanical, and electrical plan review. Assisting the project team with the bid proposals and contractor selection. Gas Construction Manager, Consumers Energy (PFES), November 2021-January 2023

• Greenfield City Gate (Station)

Gas Construction Manager, Consumers Energy (PFES), January 2021-November 2021

• Pontiac Adams City Gate (Station)

Gas Construction Manager, Consumers Energy (PFES), April 2020-January 2021

• Utica Lateral Pipeline

Commercial Driver, Staffmark, January 2020-April 2020 Gas Construction Manager, Consumers Energy (PFES), August 2019-January 2020

• Saginaw Trail Pipeline, Wilson Road VS, Carpenter Road VS, Irish Road VS Gas Construction Manager, Consumers Energy (Planet Forward Energy Solutions), June 2019-August 2019

• Grass Lake City Gate Rebuild

Vice President/Safety Manager, COC Pipeline, September 2018-June 2019

• Mantua Station Drainage, Dike Work, Road Construction, and Post Construction Clean Up, Construction Inspector, Buckeye Pipeline (HIFS), March 2018-September 2018

• 12MM Capital Project Consisting of an Above Ground Manifold and Piping Remodel with the Addition of Two New Main Line Pumps and an Electrical Upgrade, Construction Inspector, Buckeye Pipeline (HIFS), February 2018-March 2018 Page 3 of 5

• Hydro Test Valves for Broadway 2 Project in Jackson, MI. Construction Inspector, Buckeye Pipeline (HIFS), September 2017-February 2018

• Wayne Station in Wayne, MI & Above Ground Piping Remodel for Four Pipelines, Construction Inspector, Buckeye Pipeline (HIFS), June 2017-September 2017

• Toledo, OH Norco Terminal Tank Dike

Construction Inspector, Buckeye Pipeline (HIFS), March 2017-June 2017

• Woodhaven, MI Added Two Loading Arms to an Operational Truck Rack Construction Inspector, Buckeye Pipeline (HIFS), June 2016-March 2017

• Major Capital Project Consisting of a Piping Remodel of 600, 000 BBL Tank Farm, Addition of Three Main Line Pumps, and Eight Auxiliary Pumps, and an Electrical Upgrade Over the Road Truck Driver, E.W. Wylie, January 2016-June 2016 Equipment Operator, Hookin R Pipeline, November 2015-January 2016 Pipeline Consultant- Stat Oil, June 2015-November 2015

• Keach Trunkline, Rung Town Site, Striminska B, and Lark E Pipelines Project Manager/Inspector, Harvest Pipeline, October 2014-June2015

• $8MM Major Piping Remodel of Three Rivers Station while in service, a 350,000 BBL, Gathering Facility, and Building of Two 85,000 BBL Storage Tanks

Utility Inspector, Harvest Pipeline, July 2014-October 2014

• Floor Installation, Floating Roof, and Coating of the Inside of a 30,000 BBL Storage Tank, Cleaning and Inspection of a Second 30,000 BBL Tank

Equipment Operator, Hookin R Pipeline, June 2014-July 2014

• 8’’ Flow and Main Lines

Equipment Operator, Hookin R Pipeline, April 2014-June 2014

• 16” Mossy Grove North, Mossy Grove South, and Evans Pipelines Welding Inspector, Access Midstream, November 2013-April 2014

• U.E.O 24” Extension Phase 2 and Scio Suction/Discharge Welding Inspector, Access Midstream, May 2013-November 2013

• U.E.O 24” Extension Phase 2

Welding Inspector, Chesapeake Midstream, February 2013-May 2013

• 12” U.E.O. NGL and 16” Kilgore Phase 1 and 2

Equipment Operator, Chesapeake Midstream, December 2012-February 2013

• Bergholz Phase 1, 12” U.E.O. NGL and 16” Kilgore Phase 1 Inspector, Northern Natural Gas, October 2012-December 2012

• 24” Pipeline Abandonment Offshore Port Aransas

Page 4 of 5

PROFESSIONAL TRAINING

Inspection Report Writing

Liquid Penetrant Level 1 and 2

Magnetic Particle Level 1 and 2

Ultra-Sonic Testing Level 1 and 2

Construction (Chevron) Rigging

First Aid and CPR

Marine Offshore Safety Survival

Commercial Diving

MEA EnergyU Operator Qualifications:

Abnormal Operation Conditions

Corrosion Monitoring; Atmospheric, Internal, External Coating Maintenance

Locating Pipelines

Operator Qualification and Procedure Training

Protection During Disturbance of Segment Support

Inspection for Damage

Leak and Strength Test: Service, Main, and Transmission Lines Line Markers Protection from Hazards

Protection When Minimum Cover Not Met

Installation of Steel Pipe: Repair of Imperfections, and Damage Support Expansion Joints, and Anchor Maintenance: Exposed Pipelines Inspection and Segment Removal

Prevention of Accidental Ignition

Visual Inspection of Welds

LICENSES & CERTIFICATIONS

Certified Pipeline Welding Inspector

National Welding Insp School, 2010

Transporter Workers Identification Card

Transportation Security Administration

Safe-Land Basic Safety Awareness Orientation

H2S Safety 29CFR 1910.1200

ANSI Z-390-1

Red Cross First Aid and CPR/AED

Page 5 of 5



Contact this candidate