CONSTRUCTION COORDINATOR

Project Construction Coordinator with proven track record and experience in managing multimillion dollar projects with 100%completion on time while meeting strict time lines and budgets. I simultaneously managed multiple projects under demanding deadlines.

EMPLOYEMENT

12/2020 to present: HJ Russell – Atlanta, GA

Engineering Field Inspector - Working as a Field Inspector at MARTA (Metropolitan Atlanta Rapid Transit Authority) - Construction Management Branch (CMB) - Project Management

& Construction - Capital Programs & Development.

At the moment I am assigned to ESCO project performing electrical system upgrades. We are upgrading Auxiliary Electrical Rooms installing sub-metering devices (PME Series), current transformers, communication portals remote access through MEN/SCADA system and safety disconnect switches.

• Manages all installations in the field to ensure that the work product meets the standards as set forth in the contracts and other specification documents

• Ensure good workmanship, the use of proper construction materials and equipment, and correct installation procedures are followed

• Inspect and audit the Work Daily. Immediately act to eliminate unacceptable materials, equipment, and workmanship. Recommend immediate corrective action and report the action in the appropriate Quality Control status report to the Authority. Prepare daily reports on Share Point for assigned crews’ activities. 02/2020 to 12/2020 Kiewit Corporation – Lenexa, KS Project Quality Manager – Managing quality program for Samson Solar Energy Project, developing inspection checklist from specifications and construction documents. Managing and performing random inspections and conditional reporting. Also maintaining all the test reports and any documentation that is submitted to the client as turnover documents. 09/2018 to 01/2020 Moreland Altobelli Associates, LLC, Duluth, GA Engineering Field Inspector – Working as a Field Inspector at MARTA (Metropolitan Atlanta Rapid Transit Authority) - Construction Management Branch (CMB) - Project Management

& Construction - Capital Programs & Development.

• Manages all installations in the field to ensure that the work product meets the standards as set forth in the contracts and other specification documents

• Ensure good workmanship, the use of proper construction materials and equipment, and correct installation procedures are followed

• Inspect and audit the Work Daily. Immediately act to eliminate unacceptable materials, equipment, and workmanship. Recommend immediate corrective action and report the action in the appropriate Quality Control status report to the Authority. 03/2018 – 07/2018 Radiance Solar. Atlanta, GA

Site Superintendent. Solar Construction.

• Managing the project cycle for PV projects (currently working on 1-5+ MW Projects in the Southeast) Projects can get bigger.

• Supporting the design process and permitting

• Overseeing all field teams and installation progress

• Assisting the Project Manager in defining elements of work and development of subcontracts.

• Supporting the bid process for subcontracted work

• Assisting Project Manager in the development and management of project budgets

• Managing daily logs and timesheets for projects

• Organizing and managing all project data

• Coordinating the work of subcontractors on site

• Acquiring subcontract labor, materials or equipment to ensure timely completion

• Conducting site audits for new projects

06/2017 – 09/01/2017 Coliant Solutions (Contract through Aerotek) Mercedes Benz Stadium Atlanta. QA/QC Inspector

• Ensuring that all low voltage devices and all the conduits are installed per specification.

• Making sure that during installations if there are any deviations from specs, that all the deviations have been approved and that all the necessary documents authorizing these changes are available and documenting those changes.

• Also I am responsible for creating all the low voltage as build drawings, documenting any changes during construction.

09/2016 – 02/2017 Strata Solar LLC. Chapel Hill, NC Site Superintendent

• Ensuring that all workers on a job site comply with all safety guidelines and regulations in adherence with OSHA regulations.

• Participate in pre-construction planning of projects, including plan review and comments, staffing projections, and project task sequencing.

• Develop the construction team and promote support for defined goals, objectives, and assigned responsibilities.

• Monitor the progress of the construction activities on a regular basis and hold regular (weekly at a minimum) status meetings with representatives from all the sub teams.

• Manage subcontractors, staffing, and equipment. Work with Project Manager and Construction Manager in project planning and identifying resources needed 08/2015 – 09/2016 Blattner Energy INC. Avon, MN

Project Construction Coordinator.

Solar Construction

• Coordinated the construction of Solar Plants

• Administered and coordinated the day to day operations of the project site. Was responsible for training and developing Field Construction Coordinators, Project Administrative Assistant, Foremen and new Trade Superintendents.

• Ensured on-site Risk Management programs and processes were administered. I collaborated with project Manager made sure of proper use of work codes, cost types and unit of measure were applied correctly

• Oversaw and completed daily production and costs by monitoring major work items to ensure that production cost data and safety data were collected from prior day and shared with the supervisors for purposes analysis and planning.

• Tracked progress of project and financial status by monitoring and analyzing hourly cost production data.

• Prepared monthly invoices to be submitted to owner, followed up on status of payments made sure payments were processed in a timely manner. Made sure we were not under billing or over billing the owner.

• I was responsible for developing and maintaining good working relationship with clients, subcontractors, vendors and co-workers to strengthen company’s position.

• Acquired local permits as specified in the contract.

• Visited the site to collect information, analyzed the information and interpreted the data to accurately track the job progress, and be able to make accurate decisions.

• I also made sure that that Best Practice and proper work methods were being followed, made sure that all work was performed in a safe manner. Substation Construction

I also coordinated the construction of substations that support the solar farms. I over saw the construction of substations from civil construction of foundations all the way to final completion of the substations.

• Coordinated all field construction between all construction teams. Assisted the project superintendent in planning and supervising the construction activities.

• Attended all meetings related to work and procedures.

• Ensured compliance with company and site safety policies were being followed during construction.

03/2015 – 07/2015 E Light Electric Services INC. (Contract through Aerotek) Springs Colorado Springs QA/QC Manager. Decatur Parkway Solar Project, Georgia.

• Responsible for quality on the project, ensured safety of all employees, while meeting client’s needs, controlled cost, made sure that the project was competed on schedule while implementing and administering lean principles. Managed the tracking processes to meet the expectations of E Light Electrical Services.

• Developed and administered a Quality Assurance Program for the site. Developed QC reports, posted construction reports and detailed progress reports. Assisted in development and management of project execution strategies, worked closely with Construction Manager, Project Engineer and Logistic Manager made sure that all materials, workmanship and construction were all according to contract documents, specifications and were in compliance with building codes.

• Inspected all the components before they were installed made sure all the defective materials were corrected or removed before there were installed.

• Performed Contractor submittal reviews and approvals including recommendations for verification.

• Managed the Quality staff, trained QC personnel to help them develop their QC skills so as to help improve the overall performance the QC department, and helped improve the overall quality of the project.

• Witnessed and recorded all the field tests which included megger testing, IMP’s, Hi Pot, VOC. Maintained all the field test records making sure that there were accurate before submitting them to commission department.

• Documented all red line drawings and created as build drawings. Also prepared all the QC/QA closing documents.

01/2013 – 02/2015 Pike Electric (Klondyke Construction LLC). Phoenix, AZ Construction Field Engineer QA/QC Solar Construction.

• Well experienced and informed with preparation and implementation of Project Quality Plan, Inspection and Test Plan. Managed QA/QC issues in all phases of the project.

• I was the point of contact and a leader to all quality related program

• Oversaw and directed Quality Engineers and other departments to establish and meet industry quality standards and our internal quality requirements.

• Developed quality checklists that were used to perform field quality inspections.

• Responsible for all site underground trenching AC/DC feeders, Whips, Harnesses installations. I was also responsible for the proper installation of Tracker Control Systems, Harness Combiner Boxes, Metrological Stations, Soil Monitoring • Stations, making sure all the terminations were performed correctly. Monitored all the DC Feeder terminations in the inverters and also made sure that all the AC Feeders were booted correctly and landed properly in the transformers

• Developed first install procedures that were followed by electricians to perform all their field installations

• Worked with the Commission departed Witnessed and recorded all the field tests which included megger testing, IMP’s, Hi Pot, VOC recorded the information and submitted it to the General Contractor.

• Documented all red line drawings and created as build drawings. Also prepared all the QC/QA closing documents.

• Managed all contract documents, materials and vendor agreements. RESULTS Have completed job phases with zero items on the punch list. EDUCATION

B.S. Construction Management (MEP), Southern Polytechnic State University 12/2007 B.S. Management, Southern Polytechnic State University AAS – Architectural Drafting Technology, Clayton State College & University CERTIFICATION

Nuclear Construction & Startup Certification Fall 2009

(Course development supported by the US Nuclear Regulatory Commission and ASME Board of Nuclear Codes and Standards): Completed a 48-hour workshop which includes an introduction to the nuclear industry, legal and regulatory requirements, and engineering codes and standards as they apply to nuclear power plant construction and startup. Special attention was given to cranes and heavy lifts, welding and brazing, emergency planning, OSHA requirements, radiation protection and fire protection.

OSHA 30HR – Construction Safety & Health

NFPA 70E

Forklift Operator – Sunbelt

OSHA 10 Hour – Transmission & Distribution

CPR, AED and First Aid

Erosion and Stormwater Management

ORGANIZATIONS: ASHREA, MCAA

COMPUTER SKILLS: Microsoft Office, Microsoft Project, Viewpoint, Timberline, Pro Est. Textura, Blue Beam, Primavera-P6, Share Point

PROJECT LIST

KIEWIT/TIC

Solar Farm

Project Name City State Customer

Samson Solar 1.3 GW Deport TX Invenergy

STRATA SOLAR

Solar Farm

Project Name City State Customer

Deep Branch Solar 6.9 MW Pembroke NC Strata Solar

BLATTNER ENERGY INC.

Solar Farm

Project Name City State Customer

Marshall Solar 63 MW Marshall MN NextEra Energy

Live Oak Solar 51 MW Matter GA NextEra Energy

White Oak Solar 76 MW Waynesboro GA NextEra Energy ELIGHT ELECTRIC SERVICE INC.

Solar Farm

Project Name City State Customer

Decatur Parkway Solar 80 MW Bainbridge GA Georgia Power KLONDYKE LLC/ELEMENTAL ENERGY LLC

Solar Farm

Project Name City State Customer

Kent South 20 MW Lemoore CA First Solar Electric LLC Kansas 20 MW Lemoore CA First Solar Electric LLC

Desert Sunlight 550 MW Desert Center CA First Solar Electric LLC



Contact this candidate