Post Job Free

Resume

Sign in

Power Plant Board Operator

Location:
Ludhiana, Punjab, India
Posted:
June 07, 2023

Contact this candidate

Resume:

DHANSUR B KHARA

Diploma in Electrical Engineering

Post Diploma Course in Thermal Power Plant Engineering (NPTI-Delhi)

E-Mail: adxko9@r.postjobfree.com

Contact No: - +91-958**-*****

PROFESSIONAL HEADLINE:-

ACADEMIC QUALIFICATION:-

Sr. No

Course

College

Board/University

Percentage

Year of Passing

1

PDC in Thermal Power Plant Engineering

NPTI Badarpur New Delhi

National Power Training Institute

66.9%

2017

2

Diploma in Electrical Engineering

Government Polytechnic Rajkot

Technical Examinations Board

59.66%

2008

EMPLOYMENT SCAN:-

Sr.

No

Company

Designation

From – To

1

Steag Energy Services India Pvt. Ltd

Electrical Shift In charge ( Operation & Maintenance )

08/11/2022 to Till Date

2

TUV India Pvt. Ltd (Adani Renewables)

Sr. Engineer Electrical QA&QC Renewable Project (Solar - Wind)

30/08/21 to 28/08/22

3

Reliance Industry Limited (FTE)

Maintenance Engineer Electrical

28/01/19 - 31/08/20

4

Bharat Oman Refineries Limited (Aarvi Encon Limited)

Project Engineer (Electrical & Instrumentation)

06/02/18 – 30/11/18

5

Bharat Heavy Electrical Limited (FTE)

Project Supervisor Electrical

23/04/14 – 24/09/16

6

Reliance Industry Limited (Parikh Agency)

Electrical Maintenance Engineer

03/11/11 – 23/01/14

7

Essar Oil Limited (Shri Balaji Industrial Services)

Electrical Technician

04/11/10 - 31/10/11

8

GETCO LTD (Shree Rang Consultancy Services Pvt. Ltd) (Simms Egg. Pvt. Ltd)

Switch Board Operator - Electrical

06/11/09 – 31/10/10 and 01/12/08 to 31/10/09

WORK PROFILE:-

HMEL Refinery - 165 MW CPP :- (Shift In - Charge Electrical Operation and Maintenance)

# ECS - Electrical Control System, operation for STG, GTG, 220KV Grid, 33KV GIS Board & 6.6KV Switch Board, and Power & Distribution Transformer for Captive Power Plant Generation and Control

# Synchronization of Generator to Grid, Generator to Generator, Bus 1 to Bus 2 at 33KV voltage level in Auto and Manual mode in Live as well Dead Bus Condition through ESC Or SCAP

# PF and MVR Control through ECS System

# Emergency Blackout power restoration

# Refinery Load Shedding Control and monitoring in normal and breakdown condition

# 3*36 MW Steam Turbine Generator and 2*34.5 MW Gas Turbine Generator with HRSG electrical equipment maintenance and Condition Monitoring

# 2*220KV Transmission line and 2*220/33 KV Switchyard with 50 MVA Power Transformer operation and maintenance

# 50MVA 11/33KV & 33/6.6KV Generation Transformer & Power Transformer, 2.5 MVA 6.6/0.433 KV Distribution Transformer, 415/111KV ESP Transformer Operation and Maintenance

# 33 KV GIS & 6.6 KV AIS Switchboard and PMCC, MCC, MLDB operation and maintenance, Condition Monitoring

# HT and LT motor PM, CM and Breakdown maintenance

# 2 nos. Of 300TPH CFBC, 4 nos. Of 240TPH Utility Boiler and 2 nos. of 110TPH HRSG boiler electrical equipment operation and maintenance, Condition Monitoring, Cooling Tower and Pump House Electrical equipment maintenance

# Material Handling System and Ash Handling Plant for Coal and Limestone crushing and Ash transportation electrical equipment PM and CM

# LRS start Ball Mill Motor PM and CM

# AC–DC UPS and Battery Bank CM and Operation and Maintenance

# HVAV & AHU PM and CM

# Daily and Monthly power generation report preparation

Solar Power Plant Fixed Tilt and Tracker System Type :- (Sr. Engineer and Project Supervisor - Electrical)

I worked with BHEL Solar EPC Project, Adani Solar Power Project, and Aditya Birla Green Energy Limited,

300+ MW AC - 450MW DC and 78 MWp, Fixed tilt and Tracker Type Solar and Wind Green Field Power Project, Erection, Testing, Commissioning, operation & maintenance, as well QA&QC

# Involved in erection, Witness of testing, Pre-commissioning and commissioning, Quality Assurance & Quality Control, CEA Document Preparation, Punch Point Preparation & Closure, Plant Handover to O&M

# Perform site inspection to ensure all of equipment and activities from incoming stage to commissioning as per FQP

# Ensuring NCR and FOM are issued and monitored for closure of NC’s at the Site

# 220KV, 66KV and 33KV Transmissions and Switchyard Erection, Testing and Commissioning

# 220/33 KV - 66/11KV - 66/33KV Power Transformer, 33/0.66 KV,11/0.415KV Inverter Duty Transformer, 33 KV and 11KV HT Switch Gear Panel, 630KVA and 3125 KVA Inverter, SCADA, NIFPS, WMS, ACDB, UPS and Battery Bank, Earth pit, LA, Robotic system, Solar Module and SCB - SMB Erection, Testing and Commissioning as well Operation and Maintenance

# AC and DC Power and Control Cable laying, Jointing, testing, glanding and termination

# Electrical Equipment Site Acceptance Test Witness,

# On Job Training – Tool Box Talk given to Electrical team and Technician

# Monitor, analyze and control all field quality issues observed on site

# Support and perform site quality Audits as per schedule

# Preparation of Punch points and ensuring timely closure

# Preparation of all the CEA & COD Documents and uploading to common server and handover all documents to O&M.

Solar Inverter: 630KVA and 1250 KVA Hitachi and 3125 KVA KEHUA PV Grid tied inverter erection, Testing, commissioning and operation and maintenance.

Thermal Power Plant: (2*210 MW NTPC Badarpur, Delhi)

# 1 Year Post Diploma Course for Thermal Power Plant Engineering completed in, NPTI Badarpur - Delhi.

# 2 Week 500 MW Thermal Power Plant - TPS and 143 MW Gas Power Plant - CCGT Operation Simulator Training taken, NPTI – Faridabad.

# 3 Months on job Training completed in 2*210 MW Thermal Power plant at NTPC, Badarpur - Delhi. # Basic Operation and maintenance Knowledge of Thermal Power Plant working, Layout, Line Tracing with P&ID, Boiler, Turbine, Generator, Switchyard, Economizer, DM Plant, Condenser, Feed Water Heater, Air Preheater, BFP, CEP, FD Fan, PA, SA & ID Fan, ESP, Lube Oil System, Cooling Tower, Coal Transportation & Handling Plant.

Gas Turbine Generator: G&E make 2*19 MW Gas Turbine Generator Commissioning and maintenance.

Transmission Line: 220KV, 66KV, 33KV and 11KV Over Head Line Erection, Testing, Pre-commissioning, Commissioning, Preventive Maintenance

Breaker:

VCB - ACB and SF6 Breaker - Operation maintenance and testing

Transformer: Erection, Testing, Pre-commissioning, Commissioning, Preventive Maintenance, & Corrective Maintenance Up to 31.5 MVA Power Transformer and Up to 2MVA Distribution Transformer voltage rating of 220/33KV, 132/33KV, 132/11KV, 66/11KV, 33/6.6KV, 33/6.6KV, 11/0.433KV and 6.6/0.415KV.

HT Switchgear: 33KV, 11KV, 6.6KV AIS, HV Switchgear Erection, Testing, Pre-commissioning, Commissioning,

Operation & Maintenance, Conditioning Monitoring as well Shutdown activity

# ABB ELK-04 makes 132KV GIS commissioning

LT Switchgear: MCC, PCC, and EPMCC Erection, Testing, Pre-commissioning, Commissioning, Testing, Operation, Preventive Maintenance and Corrective Maintenance.

Motor: HT and LT Motor: Installation, Testing, Pre-commissioning, Commissioning, Preventive Maintenance, Corrective Maintenance, and Breakdown maintenance, PDM and Lubrication

Battery Charger and Battery Bank: Installation, Testing, Commissioning, preventive and breakdown maintenance of MASSTECH, HBL and AMCO make 160 Amp.440vDC.Float Charger and Float Cum Boost Charger with Backup by 300 AH VRLA batteries. Battery Discharge test.

UPS: Installation, Testing, Operation and Maintenance of HBL and HI REL make 160KVA UPS backup by 415 AH and 160 KVA UPS backup by 300 Ah VRLA battery.

SCADA: Installation, Testing, Commissioning, Operation and Maintenance of Solar Power Plant and Marine Tank Farm

DG SET: Operation and Maintenance of 2MW, 750 KVA and 1250 KVA Cummins make Emergency DG Set to emergency load during power failure.

EOT and LIFT: Erection, Testing, Preventive maintenance and Corrective maintenance

HVAC: Erection, Operation and Maintenance of HVAC system in substation to keep substation pressurized. And Emerson makes PAC System for air conditioning inside substations

Variable Speed Drive: Maintenance of Hi-REL make 37kw, 22kw, 7.5kw and VACON make 75kw drives for speed control of fin fan based motors based on process parameters.

Cathodic Protection System: Installation, PM and CM of cathodic protection system for Tank, and Pipe Line

Rim Seal System: Eretion, Testing and commissioning of rim seal system for Crude Oil Tank.

Cable: Cable and cable tray erection, laying, Dressing, glanding, termination and cable fault finding.

Lighting: Erection, Commissioning and maintenance of plant lighting and 30 Meter HIGH Mast,

PDB, LDB, MOVDB Erection, Testing, commissioning, operation and maintenance.

Electric Heat Tracing for Crude Oil Pipe Line Operation and Maintenance.

Earth Pit: Erection, Testing, Commissioning & Maintenance.

Training: CCGT and TPS Simulator-NPTI, PTW, LOTO, CPR, FIRE, Confine Space, Work at Height done.

Best practice for PTW, LOTO, SOP, SMP, SAFETY, RA and HITRA.

PROJECT:-

450pMW SBSR Bikaner - Rajasthan, 78MWp ABGEL Savarkundala - Gujarat, 15MW Charnaka - Gujarat, 1 & 3 MW Daman & Diu Solar & Wind Power Project including 220KV, 66KV, 33KV and 11KV transmission Line Erection, Testing and Commissioning

Cairn India, Rageshwari Deep Gas Plant Commissioning including Well Pad 33KV Over Head Line Erection and Commissioning – Gudamalani - Rajasthan.

Bharrat Oman Refineries Limited – Bina, Madhya Pradesh, BORL Expansion Project Electrical and Instrumentation Erection, Testing and Commissioning

Essar Refinery – Jamnagar, Gujarat VGO and Tank Farm Erection,testing and Commissioning

I T SKILLS:-

Basic knowledge of computer.

Working Knowledge of SAP PM and MM.

PERSONAL INFORMATION:-

Date of Birth : 17t h Sep, 1986

Sex : Male

Nationality : Indian

Permanent Address : Village: - Sapda, Dist:-Jamnagar, Post:-Pasayaberaja, Pin:-361110, Gujarat -India

Languages Known : Gujarati, English, and Hindi

Passport No : X8917319

I certify that above mentioned information is true and best of my knowledge.

Date: - DHANSUR KHARA

A Dynamic professional with 12.6 years of experience for Constriction, erection, testing & Commissioning, Operation & maintenance, QA & QC in the various industry like Oil and Gas - Refinery, 165MW CPP - 3*36 MW CFBC Thermal Power Plant, 2*34.5 MW Gas Power Plant, up to 300MW Solar & 50MW Wind Power Project, 220 KV Transmission Line and Switchyard, Generator, Power - Distribution and Inverter Duty Transformer, 33KV-11KV & 6.6KV HV Switchgear, LV-PMCC-PCC-MCC, HT - LT Motors, ESP, VFD, SCADA, AC – DC UPS, AC - DC DB, Chargers and Battery Bank, Bus Duct, EOT, LIFT, LA, Earthing System, Lighting, HVAC, Cathodic Protection, Ream seal System, MOV, AC – DC Power & Control Cable and Cable tray, NIFPS, PDB, LDB, SCB - SMB, Solar Inverter, as well Robotic cleaning system.

Currently working with Steag Energy Services as an Electrical Shift In Charge operation and maintenance in HMEL -Refinery, 165 MW Captive Power Plant (3*36 MW STG & 2*34.5 MW GTG, 220KV Switchyard).



Contact this candidate