Aug **** -
present
, HT
PROFILE
Highly self-motivated, focused, and innovated civil engineer.
A multi-tasking leader with over 12 years (6 years of GCC experiences) of qualitative experience in construction and engineering operation. Concisely finished projects under budget and ahead of schedule, familiar with all aspects of construction and commercial planning.
EXPERIENCE
Project engineer
REDCO INTERNATIONAL (DOHA)
*Project: construction of road and infrastructure at UM ALHOUL QEZ3.
-Responsibilities:
•Road activities prior to asphalt work (excavation, sub-base, grade base, compaction, and curbstone installation).
•Construction of MEP inspection chambers.
Realization pipe network (stormwater and irrigation water).
•Construction of all kinds of foundations related to electrical work
(gantries, traffic signal foundation, and meter cabinet).
•Installation of all wet utilities (potable water pipe, stormwater pipe, irrigation pipe).
•Installation of all dry utilities (excavation and backfilling of MV, LV electrical cables, fiber optical, encasement for road crossing).
•Construction of 20 electrical substations.
•Construction of swales for rainwater 13000 Lm.
Installation of the road signages (foundations, poles and signages).
•Monitoring the civil team and the manpower assignment.
•Make sure all tasks were executed as per project notes and all related codification and regulation (QCS).
•Schedule and update the planning department.
•Coordinate with the logistic department for placing orders
•Following up with the subcontractors in all phases (quality, progress, and invoices).
•Coordinating with the QC department for the inspection request and getting the approvals.
•Responsible for all the tasks related to the QC department (material approval, inspection submittal, NCR closing).
•Attending the technical meeting with the consultant to solve site problems.
•Ensuring the corrective actions for any NCR and following up the as build submittal.
CONTACT
Musheireb, QATAR
adxin8@r.postjobfree.com
PERSONAL DETAILS
Date of Birth : 25/11/1984
Nationality : Algerian
Place of Birth : Algeria
Driving license : Light
SKILLS
Analytical Thinking skills
Structural Analysis Software : SAP200,
ETAPS, SAFE
Office software, Ms Word, Ms Excel
Planning software PRIMAVERA P6
Project management
Principle and Practices Engineering
Projection software AUTOCAD
LANGUAGES
Arabic: Native language.
English: Fluent (Writing, reading, and
speaking)
French: Fluent (Writing, reading, and
speaking)
WALID DJERDJOURI,CIVIL ENGINEER
Aug 2019 - Jul
2020
Jan 2016 - Jun
2019
•Participate in the weekly progress meeting with consultant and client.
*Project: Ras Abu Aboud stadium- external work. (FIFA world cup stadium 974)
-Responsibilities:
•Supervising the asphalt wearing coat and the milling coat.
•Excavation, installation of precast MEP chambers, and backfilling.
•Formwork, reinforcement, and pouring concrete for •08 high mass foundation of the lights.
•Installation of the pole’s lights (30 m high).
•Installation of interlock, curbstone, and road signages.
*Project: Realization of 200 luxury villas in AL Shaqab.
-Responsibilities:
•Excavation and concrete casting of 200 rafts.
•Erection of the walls and slabs.
•Following up MEP services (potable water and electrical).
•Execution of all external networks (dry and wet utilities) surface water, potable water, electrical, CCTV and Telecom.
•Execution of all the fit-out work (internal painting, plumping, gypsum board.
•Installation of doors and windows.
•Realization of the external land scaping and green space. Project manager
Q Interior Design (DOHA)
*Project: Interior finishing works for Waldorf Astoria hotel & W hotel
(ceramic and marble)
-Responsibilities:
•Preparation of quotations and review of the agreement.
•Coordinate and follow up with the main contractor’s scope of work.
•Coordinate and selection of suppliers and subcontractors.
•Monitoring the progress and the quality of all the finishing tasks at the site.
•Preparation and following up on the invoices.
•Attending meetings with the main contractor and client to ensure the project goals.
•Ensured that building regulations were all met and provided thorough direction with any unusual or difficult engineering issue.
•guiding the site team and making sure all the work is done as per site requirements and as per shop drawings.
Project Engineer
ICT incha Contracting & Trading (DOHA)
*Project: Residential Labour City Development at Salwa Road.
-Responsibilities:
•Following up the realization of 12 buildings (7000 m2 build per building).
•Execute the earthing work (excavation, leveling, backfilling, and compaction).
ACTIVITIES
Music
Cinema
Picnic
Racing
Bodybuildin
Oct 2011 - Dec
2015
Oct 2009 - Sep
2011
•Execute the raft foundation 3500 m2 per building.
•Ensuring all MEP services are done as per shop drawings.
•Execute the superstructure (formwork, reinforcement, and pouring concrete) and make sure work is done as per project requirements
(Aluminium shutters have been used for this project).
•Submitting and following up all the inspection requests for getting the approval in coordination with the QC department.
•Following up and supervising the subcontractors for the finishing works
Wall’s painting.
•Epoxy flooring application.
•PVC doors & windows installation.
•Light installation.
•Following up and supervising the subcontractors for the exterior finishing works
Interlock installation.
•Greenspace.
•Team leader for large construction team (2 civil engineers, 12 Forman
& 240 workers.
Reporting to construction manager and attending the technical meeting.
•Following up on the HSE rules and making all the tasks are executed in a safe environment.
Construction Manager
CIMET SPA (ALGERIA)
*Project: Extension of a fuel depot for the Algerian Air force.
-Responsibilities:
•Responsible for the execution of all the civil work (steel & concrete building).
•Responsible for the execution of all the MEP work (pipeline, electrical
& instrumentation)
•The realization of 06 fuel storage tanks with 2500 m3 capacity each.
(the first time in Algeria the welding was automatic
•Execution of 10 steel frame warehouse 1500 m2 for each.
•The realization of a petrol station with full installation.
•Execution of the firefighting pipeline.
•Execution of firewall.
•Following up all the testing work related to MEP work with the subcontractors (pression test, welding test, alarm test).
•Realisation of the concrete road as per project specifications and requirements.
•Coordinate with the planning department and procurement for all material deliveries and progress.
•Reporting to top management.
Attending meetings with the client and the consultant. Site Engineer
GDD GROUPEMENT DE DAEWOO (ALGERIA)
*Project: Boughezoul new town project.
-Responsibilities:
Oct 2009
•Supervisor and following up for the wet utility work (rainwater, used water, and potable water network).
•Execute all the excavation trench for the pipeline according to shop drawings and as per surveyor data.
•Execute the concrete pipe installation for the rainwater network.
•Execute the HDEP pipe installation including welding for potable water network.
•Execute the PVC pipe installation for the used water network.
•Proceed for the pressure test and get approval from; the QC department.
•Realizing the backfilling of trench including compaction and testing.
•Execute the excavation for the technical span galleries.
•Execute the reinforcement and formwork according to shop drawing and site requirements.
•Pouring concrete for the technical span galleries and following up all the concrete tests recommended (temperature, slump, and cube making).
•Submitting the inspection request to the QC department to get approval.
•Preparation of the daily progress report and task assignments. EDUCATION
Engineer’s Degree of CIVIL ENGINEERING
SAAD DAHLAB University (ALGERIA)
Graduated with up 80. Thesis: Numerical analysis of tower (02 ground floor+basement+07 floors) using SAP200, and section capacity checking of the interaction (column-wall) using CsiCol with a study of the raft reinforcement with NEWMARK method. NB: I was the first engineer did use SAP200 to do the raft foundation analysis in my promotion.
COURSES
Nov 2019
Scaffolding Inspector Safety Training delivered by LEADERS Training Centre Oct 2017
Project management certificate of primavera P6 (process realization- advancement resources) UPMS Universal Project Management Service partner GOLD ORACLE.
Sep 2016
HSE training course for control of work system, British Petroleum Standard with ISG In Salah Gas
Jan 2012
Prize of excellence of the year of 2011; BOUGHEZOUL NEW TOWN PROJECT, GDD Groupement De Daewoo.
Apr 2011
project management certificate of primavera P5 (Initialization Process and Planning Process) delivered from SOMENTIC Systems Institute. Mar 2008
SAP2000 training courses for finite element method analysis & design delivered by BLIDA SOFT
REFERENCE
Mr. Nazim Bouguerra General Director -
CIMET SPA .
adxin8@r.postjobfree.com
Mr. Ahmad Salah Sr Construction Manager -
ICT incha Contracting & Trading
Mr. Youcef Hamdi Project Manager. -
ICT incha Contracting & Trading
Mr. Firas Mohamed Manager Director. -
Q Interior Design
Mr. Ali Aljawahiri Construction Manager -
Redco International
Mr. Ahmar Khalil Project Manager -
Redco International