Post Job Free

Resume

Sign in

Attendant Entry

Location:
Olongapo, Zambales, Philippines
Posted:
June 03, 2023

Contact this candidate

Resume:

Joel A. Petil

Calapandayan Subic Zambales

adxhlo@r.postjobfree.com

095********/096********

SEMINARS AND TRAINING ATTENDED

Special Basic Military Course August 01 to October 11

Kurukutok Nature Park

Cawag, Subic Zamb.

Basic Incident Command System June 5 to 7,2019

Widus Hotel

Clark Freeport Zone

Confined Spaced and Training Attendant January 10, 2012

PETROFAC

Sharjah, U.A. E.

Certified First Aider October 20, 2011

PETROFAC

Sharjah U.A.E.

Breathing Apparatus April 06, 2009

PETROFAC

Sharjah U.A.E.

Emergency Confined Spaced Rescue April 09, 2008

PETROFAC

Sharjah U.A.E.

Hydrogen SulfideAwareness Training March 05, 2008

PETROFAC

Sharjah U.A.E.

Basic Fire Awareness February 21, 2008

PETROFAC

Sharjah U.A.E.

Confined Spaced Entry August 07, 2007

PETROFAC

Sharjah U.A.E.

Employment Record

H.S.E. Coordinator 2013 – 2016

Keppel Subic Shipyard

Safeguarding the health and safety of the employee, costumes and third parties. Ensuring compliance with health& safety and environmental legislation.

Accident incident and near-miss investigation.

Conducting SHEQ audits and meeting schedule targets.

Conduct and review risk assessment, methodstatement, JSA`s and Toolbox Talk.CompleteDaily, weekly and monthly SHEQ report as required in an accurate and timely manner.Liaise with training dept. to ensure new and existing employee receive required training.

Record and report accident statistic to client and SHEQ Director immediately. Organize and participate in Emergency Response Plan, drill for injury, Spillage and fire drill.

Attendance of ZADCO and ESNAAD client meeting and regular SHEQ Group meeting. Assisting in the continuous improvement of safety, Health, Environment and Quality management and Performance.

Representing the business at Health, Safety and Environment events.

Deliver all daily Tool Box Talk. Report all substandard practices. Report all substandard Condition.

To recognize good practice and praise my colleagues.

Complete TWO(2) Health and Safety observation Cards per week. To participate fully in all training activities, course and safety Campaign.

To ensure no jobs is started without Risk Assessment, Method Statement, Job Safety Analysis ( JSA).

Permit To Work, Lifting Plan.

To complete all pre start checks on vehicles, plant and equipment before using them.

Report all Accidents, near misses, illness, etc. immediately to the SHEQ Director.

Scaffolder 2006 – 2013

Maritime Industrial Services Co.LTD

Sharjah, United Arab Emirates

Make sure that safety requirements are met at all times.

Check requirement from drawing and written instruction, select material and set ground levels.

Fit together steel pipes, support braces and clamps to form base for scaffolding

Places planks over horizontal bars to create platforms

Checks levels to scaffolding structures

Use prefabricated scaffolding when available

Dismantle scaffolding at the complete of the job

Able to work at heights

With excellent sensesof balances and hand eye coordination

Able to work as part of a team

Examined object to be moved, estimated their sizes, shape and weight and decide on the type of equipment necessary to moved them

Erect a temporary jib or derrick (liftingdevice) if required, and install devices, pulleys and other tackles

Choose or make slinging equipment and attachit to load.

Erect cranes and mobile crane booms, and increase the height of tower cranes by bolting componentspart in placeand rigging cables

Splice ropes and cables to make sling and tackles

Erect structural steelfor building or plants under constructions

Erect pre-cast concrete panel use on façade of building

Scaffolder 1994 – 2004

JENSIS TRADING & CONSTRUCTION

Subic Shipyard Philippines

Check requirement from drawing and written instruction, select material and set ground levels.

Fit together steel pipes,support braces and clamps to form base for scaffolding

Places planks over horizontal bars to created platforms

Checks levels to scaffolding structures

Use prefabricated scaffolding when available

Dismantle scaffolding at the complete of the job

Able to work at heights

With excellent sensesof balances and hand eye coordination

Able to work as part of a team

Examined object to be moved,estimated their sizes, shape and weight and decide on the type of equipment necessary to moved them

Erect a temporary jib or derrick (liftingdevice) if required, and install devices, pulleys and other tackles



Contact this candidate