Timothy Shrier
**** * ***** ** ****** Arrow OK **012 918-***-**** *******@****.***
Summary of Qualifications
Demonstrated ability to train, motivate and guide team members to achieve organizational objectives.
Dedicated leader with comprehensive management, maintenance and fabrication experience.
Core Competencies
Operations Management Training & Development Quality Assurance
Lean Manufacturing Practices Regulatory Compliance Aviation Maintenance
Experienced Technical Writer Aircraft Structures (Airframe) B727, B737, B757, B787
Familiar with Computer Programs Procurement & Inventory Control MD80, C402, A318, A319,
Salumina, CATIA, Adobe, PowerPoint G550, G650, G280, F-35 A, B
MES, Velocity, Sabre, SFM & C Models
Professional Experience
Lockheed Martin Aeronautics Division
1000 Lockheed Blvd, Ft Worth Tx December 2019-Present
Quality Assurance Technician assured manufacturing process are accomplished in accordance with company design engineering and specifications. Documented discrepancies, assured discrepancies were repaired in accordance to engineering disposition. Inspected aircraft component install and assembly nose to tail to include Hydraulic systems, Flight Control installation and functional testing. Wire Harness installation and functional test. Disposition minor discrepancies according to engineering guidelines,
APA Services
2021 S Lewis Tulsa Ok 74014 suite 210 October 2018-December 2019
Contracted at NorDam in Tulsa Oklahoma, assigned to work quality on Gulf Stream G500/600 series engine nacelles, thrust reversers and cowlings. Documented discrepancies, assured discrepancies were repaired in accordance to engineering disposition. Inspected aircraft component install and assemblies.
Lockheed Martin Aeronautics Division
1000 Lockheed Blvd, Ft Worth Tx August 2017-Oct 2018,
Quality Assurance Technician assured manufacturing process are accomplished in accordance with company design engineering and specifications. Documented discrepancies, assured discrepancies were repaired in accordance to engineering disposition. Inspected aircraft component install and assembly nose to tail to include Hydraulic systems, Flight Control installation and functional testing. Wire Harness installation and functional test. Disposition minor discrepancies according to engineering guidelines,
Triumph Aerostructures Vought Division
3030 North Mingo Rd, Tulsa Oklahoma July 2015-August 2017
Quality Assurance Technician assured manufacturing process was accomplished in accordance with IAI/Gulfstream design specifications, along with any and all FAA regulations. Documented discrepancies; assured discrepancies were repaired in accordance to engineering disposition, and within IAI specifications. Inspected leading edges and trailing edge flaps, Hydraulic systems, leading edge-trailing edge wire harness installation and functional test. Develop planning for Greenline work cards and Engineering change requests.
Johnson Service Group (Contract @ Triumph)
3901 Arlington Highland Blvd Arlington, TX 76081 Dec. Dec 2014-July 2015
QA on G280 line @ Triumph Aerostructures Tulsa Ok
Spartan College of Aeronautics and technology
8820 E Pine St Tulsa, Ok 74115 July 2014 – Dec 2014
AMT Instructor Basic Electronic I & II, and Basic Mechanics and reciprocating power plant systems.
Volt Technical Resources (Contract @ Boeing)
8955 E. Pinnacle Peak Rd, #104, Scottsdale, AZ 85255 Nov. 2013 - Jul 2014
Assembly mechanic B787 composite fuselage structure in a PC7000 manufacturing environment in Charleston SC.
Avsource Aviation Professionals Inc. (Contract @ FlightStar)
7430 US HWY 42, #208 Florence KY 41042 July 2013-Oct 3013
Triumph Aerostructures Vought Division
1801 SE Airport Rd Stuart FL 34996 April 2013 – July 2013
Fabrication & assembly of Boeing 737 inboard and outboard flaps. Inspect final assembly
AAR, Oklahoma City (Contract)
6611 S. Maridian OKC, Ok 73159 February 2013 – March 2013
Structures mechanic heavy & lite “C” checks B757’s, structures mechanic heavy “C” checks MD-80’s. Accomplish repairs according to SRM, AMM or engineering disposition under FAR 145.
Onit Aviation Services (Contract @ Gulfstream Savannah GA.)
PO Box 511, Ocean Springs MS 39564 January 2012 – January 2013
Assembly Inspector Senior Performed all tasks related to G650 wing assembly inspection, responsible for structures, hydraulics, avionics, as well as, assure sub-assemblies and major assemblies fabricated in house or at vendors meet type design. Verified component met specifications (3D measurements using LEICA). Performed
1st article inspection (FAI’s) as needed. Assure mechanics are qualified to perform the tasks they accomplish.
Propose planning (Work card) and develop changes to processes to improve efficiency at the assembly and maintenance level for G650 aircraft
Bizjet.
3515 N Sheridan Rd, Tulsa Oklahoma 74116 September 2011 – December 2011
Quality Assurance Technician, STC conformity checks, as well as, 1st article inspections (FAI’s) and quality checks of interior modifications of custom cabinetry & upholstery, as well as, certify burn tests paperwork on A318 & A319 VIP and VVIP aircraft, develop & edit work cards for interior of aircraft. Assure airworthiness upon completion. Interpret and Audit maintenance documents to assure FAA compliance.
Aerotech (Contract@ NORDAM))
7645 E. 63rd #501, Tulsa Oklahoma 74133 March 2011- September 2011Worked inspection of Boeing out of production spares (DC-10 slats), performed 1st article inspection of composite panels and fittings.
CapeAir / Nantucket Airlines
660 Banstable Rd, Hyannis MA 02601 October 2010 –March 2011
A&P Mechanic, line maintenance and 60 flight hour phase checks of Cessna 402C model aircraft under FAR 135. Troubleshoot mechanical, electrical, hydraulic and structural systems. Remove and replace components as required to facilitate maintenance schedule. Fabricate repairs on aircraft skins, stringers and longerons, ribs according to SRM, AMM or engineering disposition; also troubleshoot and repair various mechanical systems. Troubleshoot and repair/maintain aircraft power plant systems. Evaluate condition of composite components and repair as required. Maintain aircraft records according to FAA and company policy.
Spirit AeroSystems
3030 N. Mingo Rd., Tulsa, OK April 2006 – November 2010 (Four (4) years perfect attendance)
Quality Assurance Technician assured manufacturing process was accomplished in accordance with Boeing design specifications, along with any and all FAA regulations. Documented discrepancies; assured discrepancies were repaired in accordance to engineering disposition, and within Boeing specifications. Inspected B777 leading edge slats and trailing edge flaps, B737 leading edge slats and trailing edge flaps. Inspected B777 and B787 composite floor beams, as well as, structural cargo beams; using CMM (coordinate measuring machine) LEICA and METRONOR Inspected B747 and B787 composite wing panels from lay-up to final trim. Certified autoclave cures to Boeing specifications. Performed 1st article inspections of B787 floor beams and fittings. Performed receiving inspection on vendor supplied assemblies and audited vendor documentation.
Mechanic, Assembled B737 trailing edge flaps and B747 center leading edge wing section, and B747 outboard leading edge wing section. Fabricated repairs according to engineering dispositions and Boeing specifications.
Wright-Staff (Contract @ NORDAM))
6910 N. Whirlpool Dr., Tulsa, OK January 2006 – April 2006 (Temporary Contract with Right Staff)
Mechanic, performed maintenance as directed on routine and non-routine work orders.
American Airlines Inc.
3600 N. Mingo Rd., Tulsa, OK 74116 (Seven (7) years perfect attendance)
Supervisor Fleet Service, Aircraft Fueling. July 1997 - March 2004
Directed activities of fleet service clerks through crew chiefs, maintain and audit shop training records. Maintained shop records to FAA compliance standards. Developed and implemented TUL base aircraft de-icing plan in accordance with FAA regulations, Tulsa Airport Authority regulations and EPA regulations. Proposed, justified, and implemented operating procedures to streamline work process.
Assured that the cabin of every aircraft that spent 3 hours or longer at the TUL maintenance base left the base ready for revenue service, also maintained employee attendance records, administered disciplinary proceedings, and recommended commendations and awards.
Special Assignments
Conducted training record audits at Tulsa maintenance base, as well as, field stations. Conducted process audits at maintenance base, field stations, as well as, supplier locations.
Production Control Scheduler
Maintained orderly flow of parts to and from maintenance dock during maintenance process (heavy and light “C” checks and “B” checks both CFR 14 Part 121 and 145) Interfaced with engineering, inspection, and various other departments to assure complete and proper documentation of maintenance performed under FAR 121 & 145.
Production Control Planner
Facilitated communication between maintenance docks and structures & door shop; negotiated repair times on behalf of repair shops, in order to accommodate multiple aircraft. Assured complete and proper documentation of maintenance performed. Under FAR 121 & 145
Mechanic
Performed sheet metal repairs on B727, B737, A300 and MD-80 flight controls, doors and fairings. Accomplished repairs to SRM, AMM or engineering disposition under FAR 121 & 145.
Education
Tulsa Technology Center Oklahoma State University
Airframe and Power plant license June 2010 Bachelor Degree, Aviation Science May1996
3.9 out of 4.0 Deans Honor rolls 1994, 1995, 1996
3.6 out of 4.0
Spartan School of Aeronautics
Diploma, Feb 1992 DeVry Institute of Technology
Commercial pilot certification with instrument rating Electronic Engineering Maintenance Feb. 1982
Certified ground instructor rating Deans Honor roll 1981, 1982
Certified flight instructor GPA 3.25 out of 4.0
GPA 3.5 out of 4.0
TEAM ORIANTED