Page*
SUNDAY.I. AMEH
TRANSMISSION ENGINEER
IMPLEMENTATION / NETWORKSUPPORT /QAULITY AUDIT
** ***** ***************** **********
STUDIED ELECTRICAL ELECTRONICS ENGINEERING
2b OgundeleStreet Town Planning IlupejuLagos, Nigeria Email: adxfdo@r.postjobfree.com/adxfdo@r.postjobfree.com
+234 805-***-****/ +234 703*******
Date of
Birth
19thMay 1978
Sex Male
Marital Status Married
Professional
Objective
As a Quality Auditor, BSS and Transmission Engineer with Over 14-years’ experience in telecommunication industry (GSM and Wireless communications infrastructure, maintenance and subcontractors’ management skill) with an exposure to work both locally and internationally I am looking forward to work in an environment that will give me room to grow and explore my skill acquired over this year’s while working in a multinational setup. Page2
TECHNICAL SKILL
BSS Implementation, Quality Auditor,Technical Site Survey (TSS), GSM Wireless Infrastructure Preventive and Corrective Maintenance, Subcontractor Management Skill, Network optimization, Radio transmission network implementation, Access network hardware infrastructure deployment.MPT, ADM, LSY, MXC, MPR, MSS1C and AWY radio transmission skill, 2G, 3G, 4G RF Infrastructure Skill. 4G LTE Skill. e.t.c.
WORK
EXPIRENCE
COMPANY: NOKIA—NIGERIA NOV 2019 to JUNE 2021(NOKIA PROJECT) POSITION: FIELD SUPERVISOR (RADIO TRANSMISSION IMPLEMENTATIO) STATUS: CONTRACT
RESPONSIBILITY:
• Supervise and coach the subcontractors’ resources in all rollout activities.
• Ensure all jobs are done right first time and save all the time.
• Ensure that relevant versions of applicable sign off document are available and signed with customer after every job is completed.
• Regular meeting with subcontractors to align on the best delivery approach to assign task.
• Technical support on installation, commissioning and integration of Nokia 2G and 3G equipment’s.
• Conducting site acceptance both with the subcontractor and customer for proper handover.
• Ensure plan activities are communicated to subcontractor.
• Collating of daily reports from subcontractor and supervisor.
• Ensure all equipment swaps and upgrade are done as planned.
• Prompt response to all escalations from my manager and the subcontractors.
• Prepare all requests for project activities in the region through the rollout manager to customer for approval.
• Negotiate and resolve all community issue (community settlement) Page3
COMPANY: NOKIA-NIGERIA (SOMALIA PROJECT) JAN 2019 TO AUGUST 2019 POSITION: TRANSMISSION ENGINEER
STATUS: CONTRACT
RESPONSIBILITY
• Installation and commissioning of microwave UBT-T, space diversity connectivity PTP Radio Links.
• Installation and commissioning of microwave UBT-M, space diversity Back-Haul connectivity PTP radio links
• Installation and commissioning of microwave LH space diversity long-haul connectivity PTP radio links.
• Interference analysis and error clearing for MW back-haul.
• Link capacity check test for noise to signal ratio (NSR) of MW backhaul radio links.
• Quality Audit with stakeholders
• Installation quality assurance with stakeholders
• Radio link acceptance and sign off with stakeholders. COMPANY:HUAWEI TECHNOLOGIES (MAY 2018 to NOVEMENBER 2018) POSITION: TX OPTIMIZATION ENGINEER (AIRTEL PROJECT) STATUS: CONTRACT
RESPONSIBILTY
• Ericson mini-link radio preventive and corrective maintenance of radio magazine type 2p, 6p, and 20p.
• Quality assurance checks and error correction.
• RF Physical TX optimization and monitoring
• Post installation quality checks and acceptance with subcontractors to Huawei.
Page4
COMPANY: HAUWEI TECHNOLOGIES (MAY 2016 to DECEMBER 2017) POSITION: TRANSMISSION ENGINEER
STATUS: CONTRACT
RESPONSIBILITES
• Mini-link TN installation, commissioning, integration and maintenance of magazine type 2P,6P,20P/RBS series and quality check
• Huawei RTN950/980 installation commissioning integration and maintenance
• Aviat INUE maintenance and upgrade of software
• Maintenance of difference types of generators and installation of difference types of solar panel and batteries
COMPANY: M-P INFRASTRURE (JAN 2015 to DEC 2015)
POSITION: TRANSMISSION ROLLOUT ENGINEER
STATUS: CONTRACT
RESPONSIBILITES
• Installation and Commissioning of different types of 9500 MPR such as MSS-8, MSS-4, MSS1-c
• Maintenance and Software upgrade of different types/version of 9500 MPR
• Installation and Commissioning and Integration of LSY SDH (LHRC and LHR)
• Installation of RBS and mini-line craft commissioning and integration
(Ericsson Radio)
Page5
COMPANY: ALCATEL-LUCENT NIGERIA (NOV 2008 to NOV 2014) POSITION: IMPLEMENTATION ENGINEER
STATUS: PERMANENT
RESPONSIBILITES
• Installation, Commissioning and Integrations of Alcatel 9600 LSY SDH(LHRC and LHR)
• Installation, Commissioning and Integrations of different types of 9500 MPR such as MSS-8, MSS-4, MSS1-C
• Installation and supervision of AWY Super PDH radio
• Installation, Commissioning and supervision of Alcatel 9500 SDH MXC radio
• BTS Commissioning, Integration and Cross Connection
• Alcatel 3G Equipment Installation (indoor and outdoor and optimization).
• Optimization Of Sectorial Antennal (Mechanical Tilting)
• R.F Installation Indoor and Outdoor
• Installation And Termination of Diplexer, Feeder Cable (7/8) Cable Fitting, Connectors, Jumper and Connection to Antenna And BTS.
• Supervision of full Nokia turnkey project, start to end of standalone sites.
• Swaps and integration Nokia Etisalat project.
• Integration and Maintenance of SDH Radio LSY and SRT 1F for high caliber Traffic
• Conduct TSS (Technical Site Survey) for 2G and 3G flexi Hub 800 Miles
• Conduct ATP PAC and FAC on full turnkey, 2G and 3G with costumers
(EtisalatSoutheast).
• Undertake Link capacity upgrade, E1 upgrade and BTS Board expansion
(Upgrade, 444G to 666 Config)
COMPANY: GSM TELECOM (NOV 2004 to MAY 2006)
POSITION: INSTALLATION ENGINEER
STATUS: CONTRACT
RESPONSIBILITES
Page6
• Installation of V-SAT satellite radio.
• Line up test and signal tracking
• RF sweep-test using site master.
• Participate in mast and tower erection.
• Power generator maintenance.
CERTIFICATION / TRAINING:
• Microwave Wireless RF Planning and Design
(Cambridge Broadband Network--March--2013)
• Various Alcatel-lucent Products Training for 9600 LSY SDH, 9500 AWY super PDH
• 9500 MPR SDH and PDH, DWDM (Maintenance,
• Mini-link TN installation commissioning integration and maintenance magazine
Type 2P,6P,20P/RBS SERIES and quality check
• Microwave line and transmission techniques
Organizer (Nigeria telecommunication (NITEL)-- 2000)
• Electrical Safety Certified (October---2019)
Organizer (AGIS--Member world safety organization)
• Work At Heights Certified (October---2019)
Organizer (AGIS--Member world safety organization) EXTRA-CURICLUM ACTIVITIES
Reading, Traveling, listening to good music, playing basketball & Table Tennis. REFEREES: Will be provided on request.
Page7