CONTECT
B.Mutlur & Post,
Bhuvanagiri Taluk,
Cuddalore District, Tamil
Nadu, India – 608 501.
************@*****.***
SOFTWARE
SAP ECC 6.0
MS Office
SKILL
SAP ERP
SAP Business Process
SAP Plant Maintenance
Operation & Maintenance
HOBBIES
Playing Cricket
Organic Farming
LANGUAGES
English
Tamil
Hindi
Telugu
ANBARASAN.B
SAP PM Consultant Asset Management Maintenance Planning and Scheduling Operation and Maintenance.
1 Year 9 Months of experience in SAP PM Consultant and Nearly 2 Years of experience in Operation and Maintenance of Thermal Power Plants. OBJECTIVE
I am looking for a challenging role in a reputable organisation as a SAP Functional Consultant, which will allow me to grow professionally and to contribute for the growth of the organisation, and enhance my knowledge. EXPERIENCE IN SAP PLANT MAINTENANCE
Create master data such as functional locations, equipment, a task list and a bill of materials (BOM),
Create a class, characteristics, catalog and measuring points.
Create preventive maintenance in terms of time, performance, and condition-based maintenance using a strategy and multiple counters.
Having the ability to clear and resolve end-user problems in SAP PM.
Process the work orders for stock items, non-stock items, external contracts, and external services.
Create refurbishment and maintenance work with and with serialisation. Also, create subcontracting for external refurbishment maintenance.
Create calibration maintenance orders with quantitative and qualitative maintenance work orders using a catalog.
Experience in Maintenance planning and scheduling.
Generate a load sheet (LSMW) for equipment, functional locations, and maintenance plans.
Create a customised notification on PM, BM, and CM.
Creating and updating master data for SAP PM for technical objects, task lists, maintenance plans, and service notifications
Create the auto-generated notification based on the end user value entered in the measurement on the equipment.
Good knowledge of the ASAP and Activate methodologies in the SAP implementation process.
Experienced in SAP ECC PM Plant Maintenance configuration, and support.
Create Material, Purchase Order, Purchase Requisition, Split Valuation, and Invoice.
Having the good knowledge of SAP implementations and supporting role. EXPERIENCE IN OPERATION AND MAINTENANCE
Checklist of Maintenance Equipment and ensure all equipment goes through planned quality processes
Analysing the history of equipment for scheduled preventive maintenance and scheduled overhauling of equipment.
PERSONAL PARTICULAR
Date of birth : 30-05-1997
Marital Status : Single
Gender : Male
Father Name : BASKARAN.B
Passport No : R0866183
Driving License : Available
Nationality : India
Monitoring day to day activities like preventive, corrective, breakdown maintenance, compliance, and documentation.
Boiler, Turbogenerator, and BOP’s cold start up, warm start up, hot start up, and shutdown the plant as per shift in-charge instruction.
Check reserve shut-down (RSD) check lists during unit shut down time.
Ability to handle emergencies such as blackouts.
BOP Shift Engineer Operations like the Electro Chlorination Plant, Effluent Treatment Plant, and Sewage Treatment Plant, Fuel Oil Handling System.
Engaged in critical activities like boiler tube failure, turbine bearing replacement, and pump impeller replacement.
EXPERIENCE RECORD
Period Name of the Organization Role
Mar 2023 SEMBCORP ENERGY INDIA LTD., Engineer & SAP to Till Date Nellore, AP. PM
Nov 2019 COASTAL ENERGEN PVT. LTD., Engineer &
to Feb 2023 working under: Power Mech Project Ltd SAP PM
& Encotec Energy Pvt Ltd, Tuticorin, TN
EDUCATION QUALIFICATION
2018-2019 PG Diploma in Power Plant Engineering with 79.8% at NATIONAL POWER TRAINING INSTITUTE, Ministry of
Power, (Government of India), Neyveli, Tamil Nadu (SR). 2014-2018 Graduated BE Electrical & Electronics Engineering with 6.28 CGPA at KRISHNASAMY COLLEGE OF ENGINEERING &
TECHNOLOGY, Cuddalore. (Under Anna University, Chennai) ACHIEVEMENT
Got recognition for successful light-up, synchronisation of units, and generation of power without delay.
Reduction of auxiliary power consumption in turbine auxiliaries. DECLARATION
I hereby declare that all the above information is true to the best of my knowledge.
Anbarasan.B
Place: Chidambaram, TN (SIGNATURE)